Exhibit_M_PTO_0001_Worksheet_236220_GenCon.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
IDIQ JOC CONTRACT FOR GENERAL CONSTRUCTION PROJECTS UNDER NAICS 236220, NAVAL AIR WEAPONS STATION CHINA LAKE AREA OF RESPONSIBILITY, CALIFORNIA
Solicitation number
N6247318R2283
Issued by

About this file

This document contains a worksheet for a job order contract solicitation to perform general construction projects at Naval Air Weapons Station China Lake in California. The solicitation will utilize a best value source selection process to award an indefinite delivery indefinite quantity job order contract for a base period of two years and an option period of three years, for a total potential period of performance of five years, to a women-owned small business. The estimated maximum value is $49 million. Task orders will range from $2,000 to $1,000,000. Evaluation factors are ability to manage multiple projects, experience, past performance, safety, and price based on a sample task order. The solicitation will be available on the Navy Electronic Commerce Online website on or around September 17, 2018. The North American Industry Classification code is 236220 for general construction with a small business size standard of $36.5 million.

View the file

Other files

File Type Posted
N6247317R2283_RFP_China_Lake.pdf PDF
Exhibits_A_B_C_D_E_F_G_H_J_K_L.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRE-PRICED ITEM DESCRIPTIONMEANS ITEM #QTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
Selective demolition, rubbish handling, dumpster, 40 C.Y., 10 ton capacity, weekly rental, includes one dump per week, cost to be added to demolition cost0241191908404Week
Selective demolition, rubbish handling, 0'-100' haul, load, haul, dump and return, wheeled, cost to be added to demolition cost02411919204580C.Y.
Deconstruction material handling, light fixtures for recycling stack and wrap per pallet0242103003504Ea.
Hazardous waste cleanup/pickup/disposal, transportation to disposal site, truckload = 80 drums or 25 C.Y. or 18 tons, maximum02812010127035Mile
Bulk asbestos removal, remove cementitious material from flat surface, includes disposable tools & 2 suits & 1 respirator filter/day/worker02821343300075S.F.
Doors, specialty, access, standard, stainless steel, 24" x 24"0831131066501Ea.
Flooring demolition, resilient, sheet goods090505200800305S.F.
Vinyl or rubber cove base, for glued and caulked installation, add to labor0905052008001
Flooring demolition, vinyl or rubber cove base, straight section09050520085087L.F.
Vinyl or rubber cove base, for glued and caulked installation, add to labor0905052008501
Flooring demolition, vinyl or rubber cove base, molded corner0905052008604Ea.
Vinyl or rubber cove base, for glued and caulked installation, add to labor0905052008601
Walls and partitions demolition, tile, ceramic, on walls, thin set090505303760437S.F.
Gypsum wallboard, on walls, water resistant, taped & finished (level 4 finish), 5/8" thick092910302250437S.F.
Gypsum wallboard, for finishing corners, inside, add09291030535036L.F.
Wall base, rubber, straight or cove, standard colors, 6" high, 1/8" thick09651313111087L.F.
Surface preparation, interior, walls, sand, gypsum board and plaster, medium099103400670786S.F.
Painting walls, complete, on drywall or plaster, primer and 2 finish coats, with roller, including surface preparation099123721670786S.F.
Wall coating, epoxy coatings, Water based099656200400786S.F.
Toilet accessories, soap dispenser, chrome, surface mounted, liquid1028131346002Ea.
Toilet accessories, towel dispenser, stainless steel, surface mounted1028131367002Ea.
Dental equipment, chair, electric or hydraulic, selective demolition1105051074006Ea.
Selective demolition, casework, metal base cabinets12050510310025L.F.
Selective demolition, countertop, stainless steel or acid proof12050510312025L.F.
Laboratory casework, wall cabinets, metal, open, 12-1/2" deep12355313130010L.F.
Laboratory casework, wall cabinets, with doors, 12" x 31"12355313150025L.F.
Casework, base cabinets, hospital, stainless steel12357013100025L.F.
Laboratory casework, counter tops, stainless steel, excl. base cabinets12365310004025S.F.
Sprinkler system component, sprinkler heads, dry, pendent, 1/2" orifice, 3/4" or 1" NPT, 39-1/4" to 42" length, excludes supply piping2113165027905Ea.
Fixture, sink, single compartment, selective demolition2205051013002Ea.
Faucets/fittings, medical, faucet, gooseneck spout, wrist handles, grid drain2243391029002Ea.
Faucets/fittings, medical, mixing valve, knee action, screwdriver stops2243391029401Ea.
Industrial safety fixture, eyewash station, stainless steel, pedestal mounted, excludes rough-in2245161020001Ea.
Ductwork, metal; steel and stainless steel, fabricated, selective demolition230505101570100Lb.
Exhaust system, weld fume hood, selective demolition2305051017702Ea.
Balancing, air conditioning equipment, supply, return, exhaust, registers and diffusers, laboratory fume hood, (Subcontractor's quote including material & labor)2305931036001Ea.
Metal ductwork, fabricated rectangular, galvanized steel, 200 to 500 lb., incl fittings, joints, supports & allow for a flexible connections field sketches, excludes as-built drawings and insulation233113130520100Lb.
Metal ductwork, elevated installation of prefabricated (purchased) ductwork, 10' to 15' high, add to labor2331131305201
Fluorescent fixtures, interior, 2 lamp, 2' x 4', electrical demolition, remove, recessed drop-in, to 15' high, including supports & whips2605051021204Ea.
Outlet boxes, cast, switch cover, 1 gang, FS26053316151020Ea.
Interior LED fixtures, troffer, recess mounted, 6,400 lumens, 2' x 4', replaces four T8 lamp, incl lamps, mounting hardware and connections2651135510204Ea.
TOTALS$ - 0$ - 0$ - 0
NON PRE-PRICED ITEM DESCRIPTIONQTY #QTY UNITMATERIAL (MATL) UNIT COSTMATL TOTAL COSTLABOR UNIT COSTLABOR TOTAL COSTEQUIPMENT (EQUIP) UNIT COSTEQUIP TOTAL COSTOTHER COSTOTHER TOTAL COST
OFFICE SYSTEMS FURNITURE1LS$ 20,000.00$ 20,000.00
PREPRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)
CITY COST INDEX _____ (____________ WEIGHTED AVERAGE)_
SUBTOTAL (PREPRICED LINE TOTALS + CCI)
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT _________
SUBTOTAL (PREPRICED LINE ITEMS + CCI + SALES TAX)
PRE-PRICED COEFFICIENT _______ (FROM EXHIBIT K WORKSHEET)
TOTAL (PRE-PRICED LINE ITEMS + CCI + SALES TAX, LINE 52) + PRE-PRICED COEFFICIENT ADUSTMENT (LINE 52 x LINE 53)
NON PRE-PRICED LINE TOTALS (MATERIALS + LABOR + EQUIPMENT + OTHER)
APPLICABLE SALES TAX ON MATERIALS AND EQUIPMENT __________
SUBTOTAL
NON PRE-PRICED COEFFICIENT _____ (FROM EXHIBIT K WORKSHEET)
TOTAL (NON PRE-PRICED LINE ITEMS + SALES TAX, LINE 58) + NON PRE-PRICED COEFFICIENT ADJUSTMENT (LINE 58 x LINE 59)
TOTAL TASK ORDER PRICE (LINE 54 + LINE 60)
NOTE: USE OF THIS FORM IS MANDATORY. ANY MODIFICATION OF THIS FORM BY THE OFFEROR WILL RESULT IN THE OFFER BEING REJECTED AS NON-RESPONSIVE.

File details come from the government source that posted it. Updated .