J-07_IDIQ_ELIN_UN_POPULATED.xls
XLS spreadsheet 89 KB Posted
- Solicitation number
- N6247318R1407
About this file
J-07_IDIQ_ELIN_UN_POPULATED.xls
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-07_FFP_ELIN_UN_POPULATED.xls | XLS spreadsheet | |
| Amend_01.docx | DOCX document | |
| J-0200000-02_Maps.pdf | ||
| N6247318R1407.pdf | ||
| J-0200000-04_Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BASE
| ATTACHMENT J-0200000-06 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| CONTRACT # | |||||||
| Base Period - 01 Oct 2018 thru 30 Sep 2019 | |||||||
| Indefinite Delivery Indefinite Quantity Work | |||||||
| ELIN | SHORT | ||||||
| DESCRIPTION | FULL DESCRIPTION | EST | |||||
| QTY | UNIT | UNIT | |||||
| PRICE | AMOUNT | ||||||
| A700 | Service Grease Traps in Areas 1 & 2 | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| A701 | Service Grease Traps in Areas 5. Camp Billy Machem. | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| A702 | Septic Tanks at Martinez Lake, Marine Corps Recreation Facilities | Remove and dispose of up to 2,000 gallons of septic waste from the holding tank. The KO will provide assistance in locating tank access lid. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lid. Completed in 5 working days. | 40 | EA | |||
| A703 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 2200 Gallons in Areas 1 & 2 | Remove and dispose of up to 2200 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 40 | EA | |||
| A704 | Service Septic Tanks, up to 6000 Gallons in Area & 5 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| A705 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 6000 Gallons in Areas 1 & 2 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| A706 | Service Bladders and Kitchen Containers up to 3500 Gallon in area 5 (WTI) | Remove and dispose of up to 3500 combined gallons of grey & kitchen water waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days | 30 | EA | |||
| A707 | Provide and Remove Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Disabled Accessible Toilets conform to Americans with Disabilities Act (ADA) Accessibility Guidelines (AG), sections 4.1.2(6) and 4.22. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Completed per the terms of the task order. | 40 | EA | |||
| A708 | Service of Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| A709 | Provide and Remove Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 40 | EA | |||
| A710 | Service Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| A711 | Provide and Remove Chemical Toilets in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 240 | EA | |||
| A712 | Service of Chemical Toilets in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 2000 | EA | |||
| A713 | Provide and Remove Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| A714 | Service of Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 300 | EA | |||
| A715 | Provide and Remove Chemical Toilets in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 200 | EA | |||
| A716 | Service of Chemical Toilets in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 3600 | EA | |||
| A717 | Provide and Remove Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| A718 | Service of Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 150 | EA | |||
| A719 | Provide and Remove Chemical Toilets in Area 3. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 150 | EA | |||
| A720 | Service of Chemical Toilets in Area 3. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 2850 | EA | |||
| A721 | Provide and Remove Chemical Toilets with Handwash Station in Area 3. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| A722 | Service of Chemical Toilets with Handwash Station in Area 3. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 640 | EA | |||
| A723 | Provide and Remove Chemical Toilets in Area 4. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| A724 | Service of Chemical Toilets in Area 4. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 900 | EA | |||
| A725 | Provide and Remove Chemical Toilets with Handwash Station in Area 4. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| A726 | Service of Chemical Toilets with Handwash Station in Area 4. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 200 | EA | |||
| A727 | Provide and Remove Chemical Toilets in Area 5. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 175 | EA | |||
| A728 | Service of Chemical Toilets in Area 5. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 3500 | EA | |||
| A729 | Provide, Service and remove Chemical Toilets with Handwash Station in Area 5. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 30 | EA | |||
| A730 | Service of Chemical Toilets with Handwash Station in Area 5. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 300 | EA | |||
| A731 | Provide and Remove Chemical Toilets in Area 6. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 25 | EA | |||
| A732 | Service of Chemical Toilets in Area 6. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 750 | EA | |||
| A733 | Provide, Service and remove Chemical Toilets with Handwash Station in Area 6. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 20 | EA | |||
| A734 | Service of Chemical Toilets with Handwash Station in Area 6. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 240 | EA | |||
| Total IDIQ Line Items - A700 through A734 | TOTAL | $0.00 |
Opt 1
| ATTACHMENT J-0200000-06 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| CONTRACT # | |||||||
| Option Year 1 - 01 Oct 2019 thru 30 Sep 2020 | |||||||
| Indefinite Delivery Indefinite Quantity Work | |||||||
| ELIN | SHORT | ||||||
| DESCRIPTION | FULL DESCRIPTION | EST | |||||
| QTY | UNIT | UNIT | |||||
| PRICE | AMOUNT | ||||||
| B700 | Service Grease Traps in Areas 1 & 2 | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| B701 | Service Grease Traps in Areas 5. Camp Billy Machem. | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| B702 | Septic Tanks at Martinez Lake, Marine Corps Recreation Facilities | Remove and dispose of up to 2,000 gallons of septic waste from the holding tank. The KO will provide assistance in locating tank access lid. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lid. Completed in 5 working days. | 40 | EA | |||
| B703 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 2200 Gallons in Areas 1 & 2 | Remove and dispose of up to 2200 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 40 | EA | |||
| B704 | Service Septic Tanks, up to 6000 Gallons in Area & 5 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| B705 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 6000 Gallons in Areas 1 & 2 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| B706 | Service Bladders and Kitchen Containers up to 3500 Gallon in area 5 (WTI) | Remove and dispose of up to 3500 combined gallons of grey & kitchen water waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days | 30 | EA | |||
| B707 | Provide and Remove Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Disabled Accessible Toilets conform to Americans with Disabilities Act (ADA) Accessibility Guidelines (AG), sections 4.1.2(6) and 4.22. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Completed per the terms of the task order. | 40 | EA | |||
| B708 | Service of Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| B709 | Provide and Remove Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 40 | EA | |||
| B710 | Service Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| B711 | Provide and Remove Chemical Toilets in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 240 | EA | |||
| B712 | Service of Chemical Toilets in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 2000 | EA | |||
| B713 | Provide and Remove Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| B714 | Service of Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 300 | EA | |||
| B715 | Provide and Remove Chemical Toilets in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 200 | EA | |||
| B716 | Service of Chemical Toilets in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 3600 | EA | |||
| B717 | Provide and Remove Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| B718 | Service of Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 150 | EA | |||
| B719 | Provide and Remove Chemical Toilets in Area 3. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 150 | EA | |||
| B720 | Service of Chemical Toilets in Area 3. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 2850 | EA | |||
| B721 | Provide and Remove Chemical Toilets with Handwash Station in Area 3. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| B722 | Service of Chemical Toilets with Handwash Station in Area 3. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 640 | EA | |||
| B723 | Provide and Remove Chemical Toilets in Area 4. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| B724 | Service of Chemical Toilets in Area 4. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 900 | EA | |||
| B725 | Provide and Remove Chemical Toilets with Handwash Station in Area 4. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| B726 | Service of Chemical Toilets with Handwash Station in Area 4. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 200 | EA | |||
| B727 | Provide and Remove Chemical Toilets in Area 5. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 175 | EA | |||
| B728 | Service of Chemical Toilets in Area 5. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 3500 | EA | |||
| B729 | Provide, Service and remove Chemical Toilets with Handwash Station in Area 5. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 30 | EA | |||
| B730 | Service of Chemical Toilets with Handwash Station in Area 5. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 300 | EA | |||
| B731 | Provide and Remove Chemical Toilets in Area 6. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 25 | EA | |||
| B732 | Service of Chemical Toilets in Area 6. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 750 | EA | |||
| B733 | Provide, Service and remove Chemical Toilets with Handwash Station in Area 6. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 20 | EA | |||
| B734 | Service of Chemical Toilets with Handwash Station in Area 6. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 240 | EA | |||
| Total IDIQ Line Items - B700 through B734 | TOTAL | $0.00 |
Opt 2
| ATTACHMENT J-0200000-06 | |||||||
| EXHIBIT LINE ITEM NUMBERS | |||||||
| CONTRACT # | |||||||
| Option Year 2 - 01 Oct 2020 thru 30 Sep 2021 | |||||||
| Indefinite Delivery Indefinite Quantity Work | |||||||
| ELIN | SHORT | ||||||
| DESCRIPTION | FULL DESCRIPTION | EST | |||||
| QTY | UNIT | UNIT | |||||
| PRICE | AMOUNT | ||||||
| C700 | Service Grease Traps in Areas 1 & 2 | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| C701 | Service Grease Traps in Areas 5. Camp Billy Machem. | Clean designated grease traps and remove and dispose of grease to ensure they function properly. Grease traps are clean and free of grease on baffles, perforated surfaces, and all other removable parts and function to meet the intended purpose. Any service spillage is removed. Completed in 5 working days. | 15 | EA | |||
| C702 | Septic Tanks at Martinez Lake, Marine Corps Recreation Facilities | Remove and dispose of up to 2,000 gallons of septic waste from the holding tank. The KO will provide assistance in locating tank access lid. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lid. Completed in 5 working days. | 40 | EA | |||
| C703 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 2200 Gallons in Areas 1 & 2 | Remove and dispose of up to 2200 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 40 | EA | |||
| C704 | Service Septic Tanks, up to 6000 Gallons in Area & 5 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| C705 | Service Septic Tanks, Manholes, Lift Stations, Vaults up to 6000 Gallons in Areas 1 & 2 | Remove and dispose of up to 6000 combined gallons of septic waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for excavating, lid removal and replacement, back filling, and clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days. | 20 | EA | |||
| C706 | Service Bladders and Kitchen Containers up to 3500 Gallon in area 5 (WTI) | Remove and dispose of up to 3500 combined gallons of grey & kitchen water waste from selected areas. The KO will provide assistance in identifying the selected areas. The Contractor is responsible for clean-up of any spillage that may occurred during the servicing and any debris immediately around the access lids. Completed in 5 working days | 30 | EA | |||
| C707 | Provide and Remove Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Disabled Accessible Toilets conform to Americans with Disabilities Act (ADA) Accessibility Guidelines (AG), sections 4.1.2(6) and 4.22. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Completed per the terms of the task order. | 40 | EA | |||
| C708 | Service of Disabled Accessible Chemical Toilets in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| C709 | Provide and Remove Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 40 | EA | |||
| C710 | Service Chemical Toilets on Wheels in Areas 1 & 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 350 | EA | |||
| C711 | Provide and Remove Chemical Toilets in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 240 | EA | |||
| C712 | Service of Chemical Toilets in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 2000 | EA | |||
| C713 | Provide and Remove Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| C714 | Service of Chemical Toilets with Handwash Station in Area 1. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 300 | EA | |||
| C715 | Provide and Remove Chemical Toilets in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 200 | EA | |||
| C716 | Service of Chemical Toilets in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. Completed per the terms of the task order. | 3600 | EA | |||
| C717 | Provide and Remove Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide chemical toilets with services. Ensure units are available, safe, clean, sanitary, and sightly. Locations, quantity of units, number of services required, and length of service will be identified in each task order. Relocation of units by government personnel within a three-mile radius of the original drop-off point shall not cause any increased servicing and removal costs. The KO will verbally notify the Contractor of any re-locations prior to servicing and removal. Some locations may be in areas that are not easily accessible and may require a four-wheel drive vehicle. Completed per the terms of the task order. | 50 | EA | |||
| C718 | Service of Chemical Toilets with Handwash Station in Area 2. | The Contractor shall provide scheduled services to ensure toilet units are clean, sanitary, sightly, supplied, and fully functional. Servicing includes re-supply, sanitizing surfaces, deodorizing, interior and exterior cleaning, and debris removal within a 5-foot radius of each unit. The handwash station trashcan is emptied with re-supply of moist cleansing disposable towelettes, dry paper towels, soap, water, etc., depending on the type of system. Completed per the terms of the task order. | 150 | EA |