DESIGN-BID-BUILD BUILDING ADDITION SMALL BUSINESS SET-ASIDE
Solicitation number
N6247318R1208
Issued by

About this file

N6247318R1208_Amendment_0001_RFP_NavyLodgeAddition_NSAMCA.docx

View the file

Other files

File Type Posted
N6247318R1208_RFP_NavyLodgeAddition_NSAMCA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6247318R1208

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

AMENDMENT NO. 0001 – DATED 27 MARCH 2018

SOLICITATION NO: N62473-18-R-1208

TITLE: Navy Lodge Addition, Naval Support Activity Monterey, CA CS/PHONE: Shawn Borisow/831-656-3684 SOLICITATION DATE: 2 March 2018

Subject: SOLICITATION NO. N62473-18-R-1208; Navy Lodge Addition, Naval Support Activity Monterey, CA 93943-5035 A. Proposal due date is Monday, 9 April 2018, no later than 12:00 PM (local time).

B. The following information is provided in response to RFIs:

REQUESTS FOR INFORMATION:

1. Plans call to protect the existing sewer and to keep in operation at all times during construction. The existing sewer line is located in the area to be over excavated to a depth of 48". Is there any flow line elevations available?

GOVERNMENT RESPONSE: Survey was unable to determine the inverts or depth of this line.

2. Two of the three existing light poles are to be removed. Plans do not indicate how the existing light poles are wired. Where and how are the existing light fixtures fed? What is the direction of feed? Will it require new conduit and wire?

GOVERNMENT RESPONSE: Refer to the attached Revised Sheets ED101, E-101, and E-503, revision 1 dated 3/21/18.

3. Sheet AD-101, Demolition Note #16--REMOVE EXISTING STUCCO FINISH COMPLETE. PREPARE WALL FOR NEW GWB. Where or What is the location of this scope of work, could not find the corresponding number on the sheet.

GOVERNMENT RESPONSE: Design intent is to remove stucco finish on the walls to remain outside the existing laundry space, which will become interior publicly accessible corridor walls in the renovated space. Refer to revised Sheets AD-101 & A-101, revision 1 dated 3/28/18. Gypsum board indicated on A-101, Work Note 1, shall align with the gypsum board of adjacent infill walls.

4. Sheet AD-101 Demolition Note #6-JoeREMOVE EXISTING WALL ABOVE AND BELOW EXISTING WINDOW OPENING. REFER TO WINDOW TYPE 'F' ON A-407. There is not a Sheet A-407 to refer to window type.

GOVERNMENT RESPONSE: Window Types are indicated on Sheet A-405. Refer to revised Sheet AD-101, revision 1 dated 3/28/18.

5. Sheet AI101 indicates that the contractor is to provide two (2) of the "M4" Metal Shelving Units. What are the specifications on the M4 METAL SHELVING UNIT 48"L x 18"W x 84"H?

GOVERNMENT RESPONSE: All M4 Shelving will be Government Furnished, Government Installed (GFGI), Refer to revised sheet AI101, revision 1, dated 3/28/18.

6. Sheet E-106, Work Notes #13 indicates "approximate location of battery operated keycard reader". Are these devices to be provided and installed by the contractor? If so, please provide a specifications.

GOVERNMENT RESPONSE: Battery operated key card devices are indicated and specified in section 087100 - Door Hardware. Bid per the contract documents.

7. Sheet E-106, Work Notes #8 indicates that the requirements for the CCTV system is limited to providing a conduit infrastructure only. And, that the actual CCTV system (devices, cameras, wiring etc.) is provided and installed by others. Please confirm that the CCTV system is N.I.C.

GOVERNMENT RESPONSE: CCTV systems will be provided and installed by the Government (GFGI). Bid per the contract documents.

8. What type of rock is to be used in the exposed aggregate sidewalk?

GOVERNMENT RESPONSE: The Government shall choose from locally available rock samples provided by the Contractor. Size of rock shall be 1/4" diameter or smaller.

9. Sheet CD100 Site Demolition Plan - Demolition Note Reference Ex. Concrete/Tile Patio and All irrigation/landscaping to be demolished, please REFER TO LANDSCAPE DEMOLITION PLAN.

GOVERNMENT RESPONSE: The note references the Landscape plans so that the contractor is aware of the extent of the demolition and where proposed tie-ins occur. Disregard reference to LANDSCAPE DEMOLITION PLAN.

10. I did not see a separate Landscape demolition sheet included in the drawings, the only landscaping sheet reference available is L101 (Landscape Planting Bid Option), and L201 (Landscape Irrigation Plan - Bid Option) Please clarify whether a landscape demolition sheet should have been included and as part of the base value of the RFP.

GOVERNMENT RESPONSE: There is no landscape demolition sheet

11. The RFP Document currently stipulates this requirement being solicited under a 236220 primary naics code, however the description of self-performed work to be performed by the prime is 25%. Please clarify if this self-performance percentage should reflect 15% under a 236220 primary naics code.

GOVERNMENT RESPONSE: FAR Clause 52.236-1 has been changed from 25% to 15%.

C. Changes in FAR 52.236-1 Performance of Work By the Contractor (APR 1984) are indicated below:

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 25 15 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of clause)

D. Part 6 ATTACHMENTS, ARMDEC File Inventory includes additional files and is listed below:

All files will be made available upon request through AMRDEC. Please contact Mr. Shawn Borisow, Contract Specialist at shawn.borisow@navy.mil to request placement upon the Bidders List and receive AMRDEC information for the files listed below:

Beginning of AMRDEC File Inventory

T650316_DWG_FULL SET.PDF

T650316_SPECIFICATIONS.PDF

T650316_DWG_A-101_Rev01.pdf T650316_DWG_AD101_Rev01.pdf T650316_DWG_AI101_Rev01.pdf

ED101 PARTIAL FIRST FLOOR LIGHTING PLAN – DEMOLITION.PDF

E-101 PARTIAL FIRST FLOOR LIGHTING PLAN.PDF

E-503 DETAILS.PDF

T650316_Amendment 0001.pdf

End of AMRDEC File Inventory

E. ALL OTHER PARAGRAPHS, PROVISIONS, AND CONDITIONS TO N62473-18-R-1208, REMAIN UNCHANGED.

F. THE OFFEROR MUST ACKNOWLEDGE RECEIPT OF AMENDMENT 0001 ON THE OFFER SCHEDULE

G. THE PROPOSAL DUE DATE HAS EXTENDED TO Monday, 9 April 2018, no later than 12:00 PM (local time).

(End of Summary of Changes) image1.wmf