AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to update paragraph 7 of Section 00100. See page 2.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 18

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N62473-15-R-2435

X 9B. DATED (SEE ITEM 11)

29-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Jul-2015

CODE

NAVFAC SOUTHWEST

CAPITAL IMPROVEMENTS CONTRACTS CORE

CODE RAQ20

1220 PACIFIC HWY

SAN DIEGO CA 92132-5190

N62473 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N62473-15-R-2435

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTION TO OFFERORS

1. Inquiries

Inquiries regarding the Request for Proposal (RFP) shall be submitted electronically using the Request for Information (RFI) form provided as an attachment. The Point of Contact (POC) for inquiries is Brad Crawford at 619-532-2439, or e-mail at Bradley.crawford@navy.mil. The Government does not intend to respond to inquiries submitted less than 10 days before the proposal receipt date.

2. Proposal Submittal Requirements

Proposals submitted in response to this solicitation shall be formatted as follows and furnished in the number of copies stated herein. A cover letter shall accompany the proposal.

The cover letter shall include—

(a) The solicitation number;

(b) The name, address, telephone and facsimile numbers, and email address of the Offeror;

(c) The DUNS Number, CAGE Code, and Tax Identification Number (TIN) of the Offeror;

(d) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;

(e) Names, titles, phone and facsimile numbers, and email addresses of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation and;

(f) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

In addition to the cover letter, the Offeror shall submit an Offeror’s Team Consent Form for each major subcontractor/teaming partner (e.g., team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.) identified in the Offeror’s proposal.

Proposals shall be submitted in three ring binders or bound, with tabs or separators. Page limits, if stipulated, must be adhered to. Proposals shall be submitted on 8.5” X 11” paper, utilizing both sides of the paper.

The format for the proposal is as follows:

Phase One:

Cover Letter Offeror’s Team Consent Form(s) First two pages of SF1442 - with blocks 14 through 20c completed Financial Questionnaire (Original in sealed envelope from financial institution in original proposal folder only) Surety Form FAR Clause 52.209-7 - with (b) completed & DFARS Clause 252.209-7999 – with paragraph (b) completed VETS- 4212 Report Submission Confirmation (or Statement of Non-applicability) mailto:Bradley.crawford@navy.mil

Tab 1 - Factor 1, Technical Approach (Exhibit “A,” Organizational Chart, and Signed Copies of Agreements or Letters of Commitment for Each Member of the Offeror’s Team) Tab 2 - Factor 2, Experience (Exhibits “B”)

- Factor 3, Past Performance (Exhibits “C” or CCASS/ACASS evaluations) (Evaluations should immediately follow the project shown on Exhibit “B” to which they pertain)

THE FOLLOWING EVALUATION FACTORS ARE APPLICABLE ONLY TO THOSE OFFERORS

WHO ARE SELECTED TO PROCEED TO PHASE TWO OF THE SOURCE SELECTION PROCESS. DO

NOT SUBMIT TABS 4 THROUGH 6 IN PHASE ONE PROPOSALS.

Phase Two:

Tab 4 - Factor 4, Safety (Exhibit “D”) Tab 5 - Factor 5, Technical Solution (Narrative and Drawings) Tab 6 - Factor 6, Price (In sealed envelope in original proposal folder only) – The envelope shall contain the following original documents: SF1442 (Solicitation, Offer, and Award) with blocks 14 through 20c completed; Bid Bond (in the amount of 20% for PTO #0001)

Representations and Certifications, Financial Questionnaires, and Surety Forms will not be rated. However, they will be considered in assessing the Offeror’s responsibility.

Offerors are asked to submit only the information/exhibits required. Do not submit any additional information such as brochures, CDs, or other pre-printed materials.

A total of one (1) original and three (3) hard copies of the complete Phase One proposal in response to this RFP must be received by this office no later than the date and time stated in Block 13 of the SF1442. Offerors should address all Phase One evaluation factors and shall submit the proposal to the following address:

Naval Facilities Engineering Command Southwest Capital Improvements Contracts Core /RAQ20.BC Attention: Brad Crawford 1220 Pacific Highway, Building 127 San Diego, CA 92132-5190

Proposal must be clearly marked on the outside of the package with the solicitation number.

LATE SUBMITTALS WILL NOT BE CONSIDERED.

It is an Offeror's responsibility to deliver its proposal to the proper place at the proper time, which includes allowing a reasonable amount of time for the delivery of the proposal. (See FAR 15.208(a)). Proposals that are received after the stated date and time in Block 13 of the SF1442 will not be considered.

Offerors shall ensure that proposals are mailed or sent by courier in a timely manner to be delivered to the NAVFAC Southwest facility no later than the date and time stated in Block 13 of the SF1442.

Offerors intending to deliver the proposals in person to the facility at the address above are cautioned that this NAVFAC Southwest facility is located in downtown San Diego. An Offeror risks the late receipt and rejection of a proposal where it delays delivering its proposal until the last few minutes before the time set for receipt of proposals.

It is recommended that the Offeror allows for delays in driving through downtown San Diego caused by traffic (both freeway and downtown), construction projects, train/trolley crossing, parking at the pay lots/meters near the facility, and gaining access to a secure Government facility. No parking or offloading of proposals is available at the Government facility. Proposals are to be delivered to personnel in the mailroom in Building 128, and reasonable time shall be allowed for the person in the mailroom to receive and time stamp the proposal. The stamp time is determined from the NAVFAC Southwest facility mailroom time stamp and not any other time keeping equipment that the Offeror may own. Immediately upon proposal delivery, the Offeror shall leave the Government facility. An Offeror that does not leave the premises may be requested to leave or escorted by security personnel.

3. Pre-Proposal Conference

(a) A pre-proposal conference and site visit will not be conducted at this time.

(b) A list of Frequently-Asked-Questions (FAQ) with appropriate responses is provided as an attachment to the RFP.

All firms are encouraged to review the FAQ. The FAQ should be viewed prior to submitting any questions regarding the RFP.

(c) Failure of a prospective Offeror to submit any questions will be construed to mean that the Offeror fully understands all requirements of the solicitation.

(d) All prospective Offerors are advised that this solicitation will remain unchanged unless it is amended in writing. Amendments will be posted on the website at http://www.fbo.gov. However, if an amendment is issued, normal procedures relating to the acknowledgment and receipt of any such amendment as described in Contract Clause “Amendment to Solicitations” of this section shall be applicable.

4. Financial Questionnaire

Offerors shall submit the Financial Questionnaire to their financial institution and request the financial institution complete the questionnaire with regard to the Offeror’s firm. Upon completion of the questionnaire, the financial institution should place the completed questionnaire in a sealed envelope showing the return address of the financial institution and forward it to the Offeror so that the Offeror can include the questionnaire (in the sealed envelope) with the Offeror’s proposal.

If the Offeror is a joint venture, information should be submitted for the joint venture. If there is no information for the joint venture, information should be submitted for each joint venture partner.

5. Surety Form

Offerors shall submit the Surety Form to report their surety bonding information, verifying aggregate bonding capacity, current available bonding, as well as single project limit. Ensure the name of the Offeror’s surety, including the name and phone number of the Offeror’s agent within the surety, is shown on the form.

If the Offeror is a joint venture, one Surety Form shall be submitted for the joint venture, not the individual partners.

6. System for Award Management

The System for Award Management (SAM) is combining federal procurement systems and the Catalog of Federal Domestic Assistance into one new system. This consolidation includes the functionality from the following systems:

* Central Contractor Registry (CCR)

* Federal Agency Registration (Fedreg)

* Online Representations and Certifications Application (ORCA)

* Excluded Parties List System (EPLS)

Contractors must be registered in the System for Award Management (SAM) prior to award of a DoD contract. In order to participate on this solicitation, contractors must also complete electronic representations and certifications.

For more information and to complete the electronic Reps & Certs, see the SAM website at http://www.sam.gov. A contract cannot be awarded to a contractor not registered in SAM. Remember to review the NAICS codes listed in your SAM record and make sure that you have listed the NAICS code for this procurement.

Note: FAR Clause 52.209-7 and DFARS Clause 252.209-7999 are not found in the electronic Reps & Certs in SAM; therefore, Offerors shall submit FAR Clause 52.209-7 with paragraph (b) completed to report whether or not they have current active Federal contracts and grants with a total value greater than $10,000,000 and Offerors shall submit DFARS Clause 252.209-7999 with paragraph (b) completed to report whether or not they have any unpaid Federal tax liability or were convicted of a felony criminal violation under a Federal law within the preceding 24 months.

7. Federal Contractor Program http://www.fbo.gov/ http://www.sam.gov/

In accordance with Federal Acquisition Regulation (FAR) 22.13, any contractor or subcontractor with a contract or subcontract of $100,000 or more with the Federal Government must take affirmative action to hire and promote qualified covered veterans which includes, special disabled veterans, veterans of the Vietnam-era, recently separated veterans, and any other veterans who served on active duty during a war or in a campaign or expedition for which a campaign badge has been authorized.

If subject to the reporting requirements, companies must file an annual VETS-4212 Report, which shows the number of covered veterans in their workforce and number of new hires, including covered veterans hired during the reporting period. Instructions, information, and follow-up assistance is provided at VETS-4212 Internet site at http://www.dol.gov/vets/vets4212.htm or employers may contact the VETS-4212 customer support at (866) 237- 0275 or e-mail at VETS4212-customersupport@dol.gov.

VETS-4212 Reports must be filed between August 1 and September 30 of each year following a calendar year in which a contractor or subcontractor held a covered contract or subcontract.

Upon the successful submission of a VETS-4212 report, federal contractors will receive an email confirmation of receipt notification for their records. Offerors shall include a copy of their confirmation notification email in their proposal as verification of submission for the current reporting period. DO NOT SUBMIT A COPY OF THE REPORT ITSELF. If this requirement is not applicable to your firm, provide a statement that your firm does not have any contracts subject to this requirement.

A contract cannot be awarded to a contractor that has not submitted a required annual form VETS-4212, Federal Contractor Veterans’ Employment Report (VETS-4212 Report) if subject to the reporting requirements of 38 U.S.C. 4212(d) for that fiscal year.

8. Incurred Expenses

The Government is not responsible for any costs incurred or associated with preparation and submission of a proposal in response to this solicitation.

9. No Alternate or Multiple Proposals

Neither multiple proposals, nor proposal variations or options, nor alternate or alternative proposals will be considered in the evaluation.

http://www.dol.gov/vets/vets4212.htm mailto:VETS4212-customersupport@dol.gov

SECTION 00210

BASIS OF AWARD AND EVALUATION FACTORS

1. BASIS OF AWARD

Selection of contractor(s) will be accomplished using Source Selection Procedures on the basis of Best Value to the Government, considering price and other factors combined. Interested firms are expected to review the RFP and participate in a pre-proposal conference and site visit, provide proposed prices for the initial project, and provide proposal information requested to evaluate their technical and past performance factors.

The Two Phase Design-Build procedures of FAR 36.3 will be used for this procurement. Phase One of the solicitation is in accordance with FAR Part 36.3. Phase One evaluation will result in a determination of the most highly qualified Offerors. These Offerors will be requested to submit a Phase Two proposal. The maximum number of Offerors that will be selected to submit a Phase Two proposal is five (5), unless the contracting officer determines that a number greater than five (5) is in the Government’s interest and is consistent with the purposes and objectives of two-phase design-build contracting. Phase Two of the solicitation shall require submission of technical and price proposals by the Offerors selected in Phase One, which will be evaluated separately in accordance with Part 15. The Government intends to evaluate proposals and award contract(s) without discussions.

The Government anticipates three or more multiple award construction contracts. Offerors are advised that those Offerors who are selected to proceed to Phase Two are not guaranteed receipt of a contract award. Award of the basic multiple award construction contracts will be made to those responsible Offerors whose proposals conforming to the solicitation are determined to be the most advantageous to the Government considering past performance, technical, and price factors. The Government reserves the right to award three or more contracts under this solicitation or to award only the initial project (Proposed Task Order 0001) identified in the RFP as a single-action contract. The Government reserves the right not to award the Proposed Task Order 0001. The Government reserves the right to substitute or add other design-build projects that meet the scope of the MACC.

The Government reserves the right to reject any or all basic contract offers at any time prior to award; to negotiate with any one or all Offerors; to award the contract to other than the Offeror submitting the lowest total price; and to award contracts to three or more Offerors submitting proposals determined by the Source Selection Authority to be the most advantageous to the Government.

OFFERORS ARE ADVISED THAT IT IS DEFINITELY POSSIBLE THAT AN AWARD MAY BE MADE

WITHOUT DISCUSSIONS OR ANY CONTACT CONCERNING THE PROPOSALS RECEIVED.

Therefore, proposals should be submitted initially on the most favorable price and technical terms. Offerors should not assume that they would be contacted or afforded the opportunity to qualify, discuss, or revise their proposal.

Firms participating in the pre-proposal conference and site visit will not be compensated for their participation.

Successful Offerors will receive the following contract awards:

Best Value receives award with a minimum guarantee and the initial project, if the Government chooses to award it.

Second, third, and any additional selected contractor will each receive award with a minimum guarantee, and selection will be based on the same criteria as the first selection.

2. DEFINITIONS

DEFICIENCY: A material failure of a proposal to meet a solicitation requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level.

WEAKNESS: A flaw in the proposal that increases the risk of unsuccessful contract performance.

SIGNIFICANT WEAKNESS: A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance.

STRENGTH: An aspect of a proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

ACCEPTABLE FEATURES: A proposed method or technique in the proposal that addresses solicitation requirements such that no further explanation or documentation is necessary.

PAST PERFORMANCE: Relates to how well an Offeror and has performed; e.g., the quality of work accomplished, schedule compliance, customer satisfaction.

EXPERIENCE: Pertains to work performed by an Offeror within the prescribed timeframe, which is the same or similar to the work that may be ordered under this contract in terms of size, scope, and complexity.

Experience is distinct from past performance (how well an Offeror has performed).

SUSTAINABLE FEATURES: Features in the design, construction, and operation of facilities with the goal of conserving resources and minimizing adverse effects on the environment while enhancing occupant productivity, minimizing energy use, improving quality and durability of materials, increasing recycling and use of recycled products, waste reduction, etc. Relevant sustainable features are those that are the same or similar rating system recognized by Third Party Certification entities.

PROJECT: A design-build or design-bid-build construction activity or task, with a single starting point and a single ending point.

COMBINED PROJECT(S): Projects with multiple starting and ending points, performed under separate task orders, delivery orders, or multiple contracts combined in a single description. No credit will be given for work performed under MACC/IDIQ contracts in the aggregate or for multiple projects completed under more than one task/delivery order.

RENOVATION, REPAIR, ALTERATION PROJECT TYPES: Refers to projects where the primary work modifies the spaces within the existing exterior walls of existing facilities.

NEW CONSTRUCTION: Refers to creating entirely new facilities (or new expansions/ additions to existing facilities where a new structure and foundation are provided as part of the expansion/addition).

100% COMPLETE:

For construction projects: The facility is completely constructed and ready for the intended use.

For design projects (design-bid-build): 100% plans and specifications signed off by an Architect-Engineer and ready to advertise (bid) for construction with final cost estimate. Does not include any Post Construction Award Support (PCAS).

For design-build projects: 100% plans and specifications signed off by an Architect-Engineer and ready for construction with final cost estimate. Does not include any Post Construction Award Support (PCAS).

OFFEROR: Refers to the Contractor submitting the proposal as Offeror, including joint ventures, whose name appears in Block 14 of Standard Form (SF) 1442 (Solicitation, Offer and Award). In the event of a conflict or inconsistency between the Offeror’s name cited on the SF 1442 and any other part of the proposal, the SF 1442 is the conclusive document in determining the Offeror who is submitting the proposal.

OFFEROR’S TEAM: Refers to the Offeror (see definition), the Offeror's outside Lead Design Firm, and/or in-house Lead Designer(s) only; does not include subcontractors or consultants.

LEAD DESIGN FIRM / DESIGN TEAM: Applies to the Offeror’s primary design firm(s) and any in-house lead designer(s).

JOINT VENTURE (JV): A legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreement” or “strategic alliance,” which are not recognized as bona fide joint ventures for the purposes of this solicitation.

FIVE-YEAR PERIOD: The prescribed timeframe for this solicitation that refers to the period of time for which projects may be submitted for experience, past performance, or for prior support for small business. The five-year period is calculated by counting back five years from the initial RFP issuance date.

DESIGN-BUILD: Refers to combining design and construction in a single contract with one contractor.

Design-build projects require design of the project by a licensed professional (i.e. engineer, architect). Projects that only require shop drawing level effort are not design-build projects.

DESIGN-BID-BUILD: Refers to the traditional delivery method where design and construction are sequential and contracted for two separate contracts and contractors; one for an A-E contract and one for a construction contract.

SELF-PERFORM: Refers to performing relevant and major construction trade work in-house without subcontractors. This does not include project administration or management functions (e.g. quality control, safety program) and miscellaneous work (e.g. housekeeping, clean up). Relevant and major construction trade work is that which is the same or similar to the work that may be ordered under this contract.

PAGE: Refers to one printed side of a piece of paper. (For example, 5 pieces of paper printed on both sides would result in 10 pages of narrative.)

3. RELATIVE IMPORTANCE OF THE EVALUATION FACTORS

The relative importance of the evaluation factors is as follows:

a. Phase One: Phase One shall consist of Factors 1, 2, and 3. Factor 1 (Technical Approach) will be rated as either Acceptable or Unacceptable. If an Offeror is rated Unacceptable for Factor 1, they will not be invited to participate in Phase Two. Factors 2 and 3 are of equal importance to each other.

b. Phase Two: In making the best value award decision in Phase Two, Factors 2-5 and price will be considered. The technical factors (2, 4, and 5) are of equal importance to each other and when combined are of equal importance to the performance confidence assessment (Factor 3, Past Performance). The combined non-price factors are approximately equal to price. The importance of price will increase if the Offerors’ non-price proposals are considered essentially equal in terms of overall quality, or if price is so high, or low, as to significantly diminish the value of a non-price proposal’s superiority to the Government.

According to FAR 15.304, the evaluation factors that apply to this acquisition are a part of this RFP and are evaluated individually. The applicable evaluation factors and submission requirements are identified below.

4. EVALUATION FACTORS

The evaluation factors for this procurement are:

FACTOR 1: TECHNICAL APPROACH

http://en.wikipedia.org/wiki/Strategic_alliance

a. Proposal Submission Requirements:

The composition and management of the firms proposed as the design-build (DB) team for this contract will be evaluated in this factor.

The Offeror shall submit the following information under Tab “1”:

(1) Using Exhibit “A” (Offeror Team Composition and Management), provide a narrative describing the proposed primary construction firm(s) and primary design firm(s) for this contract and the rationale for proposing this arrangement. Provide the role, responsibilities, and contractual relationships between the various firms (see FAR Subpart 9.6). On a separate sheet, include a simple organizational chart that clearly identifies the lines of authority between the entities. If the experience of an entity is being claimed in Factor 2, that entity must be named in the above narrative and organizational chart.

The technical approach narrative (Exhibit A) shall be limited to one (1) double-sided page (or two (2) single-sided pages), excluding the organizational chart. The information requested in item (2) below is not included in this page limitation.

(2) In addition to the narrative, the Offeror shall submit a signed copy of a joint venture agreement, partnership agreement, teaming agreement or letter of commitment for each member of the Offeror’s team identified above (e.g., joint venture member, partner, team member, subcontractor, parent company, subsidiary, or other affiliated company, etc.).

b. Basis of Evaluation:

The assessment of the Offeror’s technical approach will be used as a means to evaluate the organizational structure and teaming relationships proposed by the Offeror. This factor will be rated on an Acceptable or Unacceptable basis.

FACTOR 2: EXPERIENCE (See definition)

Submit Exhibit “B” (Construction/Design Experience Project Data Sheet) under Tab “2.”

(1) Construction Experience:

Submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience on relevant projects that are similar in size, scope, and complexity to projects that may be ordered under this contract.

For purposes of this evaluation, relevant projects are further defined as new construction, renovation, or repair of fire protection systems, by design-build or design-bid-build, with a project construction cost between $2,000 and $7,000,000.

Types of fire protection system construction projects may include, but not limited to, the new installation, addition or repair of: fire sprinkler systems (wet-pipe, dry-pipe, pre-action, high speed deluge and ultra-high speed deluge); fire protection system water supply storage and distribution systems (fire pumps, tanks, fire hydrants, standpipes, and underground water mains); low and high expansion aqueous firefighting foam (AFFF) systems; and water spray and water mist systems.

Types of fire alarm and detection system projects may include, but need not be limited to, the following systems: building evacuation systems, mass notification systems, fire detection systems, fire reporting systems and building emergency controls and interfaces.

Associated components and systems that may also be included in the fire protection system construction projects for this contract may include: incidental special hazard systems such as gaseous systems (carbon dioxide and clean agents), kitchen fire suppressions systems and dry chemical systems.

Services may include incidental architectural, civil, geotechnical, environmental, and structural work as well as disposal of materials containing lead paint and asbestos.

• At least one project shall demonstrate primarily new construction (see definition).

• At least one project shall demonstrate performing primarily renovation construction (see definition).

• At least one project shall demonstrate a construction cost of $2,000,000 or greater.

• At least two construction projects shall demonstrate design-build construction (see definition).

Exhibit “B” must clearly address how the submitted project meets the above requirements.

Projects submitted for the Offeror shall be 100% complete (see definition) within the past five (5) years of the date of issuance of the RFP.

A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

A project experience shall be considered either primarily new construction or renovation/repair but not both. A single project may satisfy more than one of the above minimum requirements except for experience in new construction and renovation/repair.

The attached Construction/Design Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of the RFP (how the project meets the minimum requirements listed above). In addition, the description should also address any sustainable features for the project including specific descriptions of those features. Provide applicable documentation on projects with sustainable building validation and/or certification through any Third Party Certification entity.

If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, at least one relevant project shall be submitted for each Joint Venture partner. If no shared project experience is demonstrated, proposals that fail to submit at least one relevant project for each partner in the Joint Venture will be rated Unacceptable. Offerors are still limited to a total of five (5) projects combined.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of the contract.

Regarding any such submitted project, if the Offeror fails to demonstrate the affiliate/subsidiary/parent firm’s meaningful involvement in the performance of this contract, the project will not be considered relevant and will not be evaluated. Offerors are still limited to a total of five (5) projects combined.

Experience of a subcontractor submitted to demonstrate construction experience will not be considered.

(2) Design Experience:

Submit a maximum of five (5) relevant design projects for the design team that best demonstrate design experience on relevant projects that are similar in size, scope, and complexity to projects that may be ordered under this contract.

For purposes of this evaluation, relevant projects are further defined as new construction, renovation, or repair of fire protection systems, by design-build or design-bid-build, with a project construction cost between $2,000 and $7,000,000.

Types of fire protection system construction projects may include, but not limited to, the new installation, addition or repair of: fire sprinkler systems (wet-pipe, dry-pipe, pre-action, high speed deluge and ultra-high speed deluge); fire protection system water supply storage and distribution systems (fire pumps, tanks, fire hydrants, standpipes, and underground water mains); low and high expansion aqueous firefighting foam (AFFF) systems; and water spray and water mist systems.

Types of fire alarm and detection system projects may include, but need not be limited to, the following systems: building evacuation systems, mass notification systems, fire detection systems, fire reporting systems and building emergency controls and interfaces.

Associated components and systems that may also be included in the fire protection system construction projects for this contract may include: incidental special hazard systems such as gaseous systems (carbon dioxide and clean agents), kitchen fire suppressions systems and dry chemical systems.

Services may include incidental architectural, civil, geotechnical, environmental, and structural work as well as disposal of materials containing lead paint and asbestos.

• At least one design project shall demonstrate primarily new construction (see definition).

• At least one design project shall demonstrate primarily renovation construction (see definition).

• At least one project shall demonstrate a construction cost of $1,500,000 or greater.

• At least two design projects shall demonstrate design-build (see definition).

A submitted project will be given consideration as either a new construction project or a renovation project, as indicated by the Offeror on Exhibit “B”.

Projects submitted for the design team shall be 100% complete (see definition) within the past five (5) years of the date of issuance of the RFP. For design-build projects, the design portion of the contract shall have been completed within the past five (5) years of the date of issuance of the RFP.

A project is defined as a complete design effort performed under a single task order or contract/subcontract.

For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather Offerors shall submit the work performed under a task order as a project.

The attached Construction/Design Experience Project Data Sheet (Exhibit “B”) is MANDATORY and SHALL be used to submit project information. If the same project is being used to demonstrate construction and design experience, submit separate Project Data Sheets for construction and design. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of the RFP (how the project meets the minimum requirements listed above). In addition, the description should also address any sustainable features for the project including specific descriptions of those features. Provide applicable documentation on projects with sustainable building validation and/or certification through any Third Party Certification entity.

If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name and address is not exactly as stated on the SF1442), the proposal shall clearly demonstrate that the affiliate/subsidiary/parent/LLC/LTD firm will have meaningful involvement in the performance of the contract.

The Offeror may utilize experience of a design subcontractor to demonstrate design experience under this evaluation factor. The Offeror must provide a supporting joint venture agreement, partnership agreement, teaming agreement, or letter of commitment and an explanation of the meaningful involvement for the design subcontractor.

The basis of evaluation will include the Offeror’s team’s demonstrated experience and depth of experience in performing relevant construction and design projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s team’s relevant experience will be used as a means of evaluating the capability of the Offeror’s team to successfully meet the requirements of the RFP. Projects submitted in excess of the five

(5) for Construction Experience and five (5) for Design Experience will not be considered.

Relevant projects where the Offeror and the proposed design firm(s) have previously worked together may be considered more favorably than those that have not worked together.

Relevant projects that demonstrate design-build experience may be considered more favorably than those that do not have design-build experience.

Offerors who submit relevant projects that demonstrate experience self-performing relevant features of work may receive a higher rating than those who do not demonstrate self-performance.

FACTOR 3: PAST PERFORMANCE

Submit Past Performance Questionnaires (Exhibit “C”) and CCASS/ACASS evaluations under Tab “2” immediately following each of the project data sheets to which they pertain. Submit any other past performance information under Tab “3”.

If a completed Construction Contractor Appraisal Support System (CCASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for construction experience. If a completed AE Contractor Appraisal Support System (ACASS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 2 for design experience. If there is not a completed CCASS or ACASS evaluation, submit a Past Performance Questionnaire (Exhibit “C”) for each project included in Factor 2 for both Construction Experience and Design Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) in the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact.

Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 2 – Experience. Offerors may also address any adverse past performance issues. Explanations shall not exceed one (1) double-sided page (or two (2) single-sided pages) in total.

The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references unwillingness to provide the information requested may affect the Government’s evaluation of this factor.

Performance award or additional information submitted will not be considered.

This evaluation focuses on how well the Offeror performed on the relevant projects submitted under Factor 2 – Experience and past performance on other projects currently documented in known sources. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.

The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.

Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive an Unknown Confidence rating.

PHASE TWO

Basis of Evaluation/Submission Requirements/Criteria Description for Each Factor:

FACTOR 4: SAFETY

Submit Exhibit “C” (Safety Data Sheet / Safety Narrative) under Tab “3.” Individual blocks on this form may be expanded.

For a partnership or joint venture, EMR and DART rates are required for each entity that is part of the partnership or joint venture; however, only one safety narrative is required. Rates shall not be submitted for subcontractors.

The Offeror shall submit the following information:

(1) Experience Modification Rate (EMR):

For the three (3) previous complete calendar years (2012, 2013, and 2014), submit your EMR (which compares your company’s annual losses in insurance claims against its policy premiums over a three year period). If you have no EMR, affirmatively state so and explain why. Any extenuating circumstances that affected the EMR and upward or downward trends should be addressed as part of this element. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

For the (3) previous complete calendar years (2012, 2013, and 2014), submit your OSHA DART rate, as defined by the U. S. Department of Labor, Occupational Safety and Health Administration. If you cannot submit an OSHA DART Rate, affirmatively state so and explain why. Any extenuating circumstances that affected the OSHA DART Rate and upward or downward trends should be addressed as part of this element. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach to Safety:

Describe the plan that the Offeror will implement to evaluate safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety narrative shall be limited to two pages.

b. Basis of Evaluation:

The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for its self-performed work and the work of its subcontractors. The Government will evaluate the Offeror’s overall safety record, the Offeror’s plan to select and monitor subcontractors, and any innovative safety methods that the Offeror plans to implement for this procurement. The Government’s sources of information for evaluating safety will include, but are not limited to: OSHA, NAVFAC’s Enterprise Safety Applications Management System (ESAMS) database, and other related databases. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the following:

− Experience Modification Rate (EMR) − OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate − Offeror Technical Approach to Safety − Other sources of information available to the Government

(1) Experience Modification Rate (EMR):

The Government will evaluate the EMR to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower EMRs will be given greater weight in the evaluation.

(2) OSHA Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate:

The Government will evaluate the OSHA DART Rate to determine if the Offeror has demonstrated a history of safe work practices taking into account any upward or downward trends and extenuating circumstances that impact the rates. Lower OSHA DART Rates will be given greater weight in the evaluation.

(3) Technical Approach to Safety:

The Government will evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on projects under this procurement. The Government will also evaluate the narrative to determine the degree to which innovations are being proposed that may enhance safety on projects under this procurement. Those Offerors whose plan demonstrates a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.

FACTOR 5: TECHNICAL SOLUTION

• Submit a Technical Solution narrative and drawings under Tab “5” in order to demonstrate an understanding of the project objectives, design criteria, and the RFP requirements.

Provide a narrative describing the technical solution to the project. Address the following:

- Offeror's design approach to the proposed sprinkler and alarm system that will increase reliability, decrease maintenance and lower life cycle costs.

- Proposed design and engineering solutions for the fire protection system for the project and indicate how well the proposed solutions meet, or exceed, the requirements of the

RFP.

- Preliminary hydraulic calculations to determine the approximate system demand and adequacy of the water supply.

Narrative shall not exceed one (1) double-sided page (or two (2) single-sided pages).

• Submit a conceptual design of the proposed project to demonstrate an understanding of the project objectives, design criteria and functional requirements specified in the RFP.

- Provide a concept drawing that identify locations of all required fire protection equipment and devices, including detection, notification, signaling, and initiating devices on the provided floor plan.

- Provide a concept drawing that Identifies the location and detail of required fire pumps and controllers, the riser piping, sprinkler heads, flow switches, etc.

- Provide a concept drawing that identify a life safety plan.

The evaluation will be based on the Offeror’s technical approach for Proposed Task Order (PTO) 0001, for the Design and Construction of a fire protection construction project at the Reserve Training Center in San Diego County, CA. The Offeror’s demonstration of an understanding of project requirements and design criteria presented in the RFP as well as the Offeror’s technical approach to the project will be considered.

Elements of the proposed technical approach to be evaluated include:

• A technical approach that demonstrates a clear understanding of the project concepts, design criteria and functional requirements presented in the RFP may receive a higher rating.

• A technical approach that demonstrates an efficient and cost effective system design concepts that will reduce future maintenance and operating costs may receive a higher rating.

FACTOR 6: PRICE – Based on Proposed Task Order 0001 Reserve Training Center, San Diego, CA.

The Offeror (see definition) shall complete and submit (in a sealed envelope) the following in the order shown below under Tab “5” of the original proposal only.

- Standard Form (SF) 1442 (Solicitation, Offer and Award)

- Bid Bond

With regard to price as shown on the SF 1442, the only Contract Line Item that Offerors are to complete is Line Item 0002 of Section 00010 Solicitation for Proposed Task Order 0001.