Amnd 0002 20R6020 Final.pdf
PDF 239 KB Posted
- Attached to
- Repair Bridges
- Solicitation number
- N6247020R6020
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12815778 Rev 2.pdf | ||
| Amnd 0001 20R6020 Final.pdf | ||
| 20R6020 RFP.pdf | ||
| Bridge Specs.pdf | ||
| Master PPI Form 20R6020.xlsx | XLSX spreadsheet | |
| Bridge DrawingsasOne.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
6844738 Repair Bridges Solicitation N6247020R6020 Marine Corps Air Station Cherry Point, North Carolina Amendment 0002
Block 14. DESCRIPTION OF AMENDMENT (cont.)
A. This amendment replaces the language in the RFP under: “Field Oversight:” paragraph with the following:
The SSHO may not serve as the Quality Control Manager. The SSHO may not serve as the Superintendent.
B. The following provides the Government’s responses to preaward inquiries:
Date Submitted
REFERENCE QUESTION GOVERNMENT
RESPONSE
Page Section Para.
9/3/2020 9 01 14 00 1.2 b
Specifications state that for bridge 4062, one lane must always be open. A comment was made at the pre-bid that lane closures can only be done at night. This will have a huge impact on cost. Can you please clarify this in an amendment.
Refer to Note 2 on NAVFAC Drawing # 12815778 (Drawing G002).
9/3/2020
A comment was made at the pre-bid that IR scans will need to be done at bridge 4920. I can not find this in the specifications. Please confirm in an amendment that this is a requirement and what frequency of testing is required.
Refer to Note 2 on Drawing CU04 and Paragraph 3.2 in Specification Sections 31 32 23 and 32 01 29.62.
9/3/2020 67 01 35 26 1.6.1.1.1
Section states SSHO may not serve as QC manager or superintendent. Field oversight note of RFP states that one person may fill role of superintendent, QC manager, and SSHO. Please clarify
Paragraph 1.6.1.1.1 of Specification Section 01 35 26 is accurate.
This project is large enough to merit separate positions.
C. This amendment incorporates the following updated attachments:
1. Replace NAVFAC Drawing # 12815778 with revised NAVFAC Drawing # 12815778 Rev 2.
D. All other contract terms and conditions remain unchanged.
| Untitled |
| Untitled |
| IDCode: |
| Page: 1 |
| Pages: 2 |
| AmendNo: AMENDMENT NO. 0002 |
| EffDate: 09/04/20 |
| ReqNo: |
| ProjNo: 1664135 |
| IssCode: ROICC81 |
| IssuedBy: OFFICER IN CHARGE OF CONSTRUCTION FLORENCE |
NAVAL FACILITIES ENGINEERING COMMAND ATLANTIC
1121 HAMMOND ROAD
CAMP LEJEUNE, NC 28547-2521
| AdmCode: |
| AdminBy: See Item 6 |
| ContName: |
| ContStrt: |
| ContCnty: |
| ContSt: |
| ContZIP: |
| Code: |
| FacCode: |
| SolAmdNo: N6247020R6020 |
| AmendDate: 08/13/20 |
| ModNo: |
| ModDate: |
| NoCopies: 1 |
| Amended: Yes |
| ApprData: |
| ChgeOrder: |
| Modify: Off |
| SuppAuth: |
| OthrSpec: |
| Require: Off |
| Copies: |
| Descript: |
N6247020R6020 Repair Bridges, Marine Corps Air Station Cherry Point, NC
The date and the hour for the receipt of proposals remains 9 September 2020, no later than 2:00 pm (EDT).
See continuation page(s).
| SignName: |
| SignTitl: |
| ContDate: |
| CoName: |
| CoTitle: |
| CODate: |
| SolChgYs: Yes |
| SolChgNo: Off |
| OffrExt: Off |
| OffrNoEx: No |
| ChgeOrd: Off |
| SuppAgre: Off |
| ModOthr: Off |
| NoReq: Off |
File details come from the government source that posted it. Updated .