Amendment_0002.pdf
PDF 13 MB Posted
- Solicitation number
- N6247019R1004
About this file
Amendment_0002.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0005.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0001.pdf | ||
| SF1149,_N6247019R1004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TWO SHIP-TO-SHORE CONTAINER CRANES AT MILITARY OCEAN TERMINAL, CONCORD, CA
Amendment 0002 is being issued for the follow ing:
1. Respond to pre-proposal inquiries
2. Incorporate a revised Specification and Appendix A to Attachment A. All other sections remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-May-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6247019R1004
X 9B. DATED (SEE ITEM 11)
21-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-May-2019
CODE
COMMANDER NAVFAC ATLANTIC
NAVY CRANE CENTER
NORFOLK NAVAL SHIPYARD
BLDG 491
PORTSMOUTH VA 23709-5000
N62470 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N6247019R1004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND. 0002
1) QUESTION: Can you please let us know what the payment terms will be?
RESPONSE: Government Financing is available in accordance with FAR 52.232-30, Installment Payments for Commercial Items. See Section G5 of the solicitation.
2) QUESTION: Please clarify quantity for test weights per crane. One (1) Test weight set for 2 STS crane or One (1) Test weight set for each STS crane –Total Two (2) Test weight sets?
RESPONSE: Total of one test weight set is required, not one set per crane.
3) QUESTION: Please clarify “Initial spare parts” of this section means Spare parts of Section 3.8.6.1 “Spare Parts for Commissioning and Testing” or Section 3.8.6.3 “Essential Repair Part Stockage with Pricing” & Appendix E?
RESPONSE: In Section 3.8.6.1, the government requires the contractor provide a list of parts and consumption items the contractor expects to use during commissioning and testing of the cranes prior to government acceptance. Any unused items from this list remain property of the contractor. Section 3.8.6.3, and the referenced Appendix E, defined the spare parts that may be procured under optional CLIN 003.
4) QUESTION: Bidder requests to change stowage angle of boom at maintenance from 80° to 84°.
The drawing A2 of Appendix A shows 85° at maintenance position. We request to modify this to 84°.
RESPONSE: 80° is the minimum boom stowage maintenance angle. Higher angles are acceptable.
5) QUESTION: Please clarify Bidder shall include cost such as accommodation, flight, automobile in contract for government inspections.
RESPONSE: The government will bear all costs associated with government employee travel.
6) QUESTION: Minimum Support Period: Bidder suggests “at least five (5) years” to “first two (2) years of gratuitous service and next three (3) years of compensation service” for both paragraphs. Bidder suggests following sentence to be added at the end of this section.
“Consumable items including, but not limited to, lamps, filters, fuses and motor brushes are excluded from all warranties. Detail list and support period can be discussed after contract.”
RESPONSE: In section 1.11.1, the government requires the contractor to use components and software that will not become obsolete within five years. The original manufacture will provide parts availability and maintain the software during this period. Section 1.11.1 does not define warranty coverage. See Section I, FAR 52.246-18 for warranty terms.
7) QUESTION: Structural Steel: Bidder requests clarification for JIS or KS steels, which are compared in Annex 1 of this document as comparison table. By request from Government, Bidder will submit additional documents proving equivalence between ASTM steel and JIS (KS) Steel Positive review is requested.
RESPONSE: Alternate codes, including JIS, are allowed in accordance with paragraph 1.2.4.
8) QUESTION: Structural Pipes and Tubes: Bidder requests clarification that whether equivalent JIS material can be alternatively used for this project for below. Line pipe (spiral welded pipes) API 5L, PSL2, Round HSS ASTM A1085, Rectangular HSS or round ancillary ASTM A500 Grade B, High Strength Bolts, Nuts, and Washers for Structural Connections AISC-360. Document showing equivalence will be submitted for Government approval
9) QUESTION: Mechanical Bolted Fasteners: Bidder requests that high strength bolts, nuts, washers and fasteners for Barrel coupling from South-Korea manufactured products to be approved for this STS Crane. High strength bolts, nuts, and washers will have same grade of ASTM F3125 Grade A325 or A490 bolts, same grade of SAE J429 (Grade 8). Bidder will submit documents showing equivalence for Government approval.
RESPONSE: Alternate codes, including JIS, are allowed in accordance with paragraph 1.2.4. Fasteners not manufactured IAW an accepted code shall not be used.
10) QUESTION: SAE Grade 5 nuts: Bidder suggests following: 1. Nuts up to diameter12mm, to be Nylock inserted stainless steel nuts, 2. Nuts more than diameter12mm, to be High tensile strength steel nuts
RESPONSE: The requirement will not be changed. 1. Nuts shall be compatible with bolts to prevent galvanic corrosion potential between the metals. 2. The specification does not prohibit use of higher strength fasteners where SAE Grade 5 would be adequate. However, the nut shall be of a grade appropriate to the bolt as required by SAE standards.
11) QUESTION: Steel Forgings: Bidder requests equivalent steel forgings from JIS code to alternate ASTM A668, Classes A through F for medium carbon steel or, Classes G through N for alloy steel. Bidder will submit documents showing equivalence for Government approval.
12) QUESTION: Bronze Bushings and Thrust Washers: Aluminum-bronze Copper Alloy Bidder requests equivalent aluminum-bronze Copper from JIS code to alternate UNS Number C95200, C95300, or C95400. Bidder will submit documents showing equivalence for Government approval.
13) QUESTION: Accessible structural member: Bidder requests exception for accessible structural member.
Request for additional sealed member “Following structural member can be seal welded. Non-FCM part of Legs, Portal beam, Sill beam which are any equipment and cables are not arranged inside. Non-FCM part of Boom and Girder which are any equipment and cables are not arranged inside.
“Those Sealed member shall be pressure tested as requirements specified. Additionally, those sealed member will have V.C.I Powder to prevent corrosion
RESPONSE: The requested deviation complies with the intent of the specification, provided (1) there are no structural connections requiring structural inspection from the inside that are included in sealed compartments,
(2) all required structural inspections for welds made to members in sealed compartments can be reasonably inspected from the exterior, and (3) the adjacent unsealed compartments have reasonable interior access.
14) QUESTION: Inspection platforms for trolley cable carrier system (may be cable chain system) will be installed at Backreach of Trolley Girder.
RESPONSE: For a cable chain system it may not be possible to get the entire system into the backreach for inspection and repair. At a minimum, access should be provided the full length of the cable chain system from the center point (usually near the boom hinge) to the full backreach.
15) QUESTION: Trolley stowed position locking device: For Rope Towed Trolley (RTT), stowed position locking device is not required because trolley is held from drive system – drum, non-operating motor. Please exclude this device to RTT
RESPONSE: Trolley stowed lock pins are specified for stowed wind condition or for maintenance reasons. These are relatively simple devices and should not be difficult or costly to provide.
16) QUESTION: Requirements for Rail pads: Bidder requests Bidder to follow rail pad manufacturer’s recommendation in accordance with selected rail. Please clarify which requirements shall be kept for rail pad manufacturer in the paragraph.
RESPONSE: The requirements in section 2.2.11 shall be kept.
17) QUESTION: Gantry Travel Drive Mechanisms: Bidder is planning to use Geared motor type drive mechanism. Feature of standard geared motor may not correspond with requirements. Please clarify which requirements shall be kept for geared motor in the paragraph.
RESPONSE: Gearmotors shall not be used for any of the primary motions, including gantry.
18) QUESTION: Brakes for Idler wheels; Clarification is requested for below:
Driven wheels: Drive mechanism (Geared motor) has brakes, additional “Wheel brake” is not required. Deviation is requested for below: Idler wheels: Excessive braking force can affect to crane structure due to inertia force. Bidder suggest 50% of Idler wheel to have “Wheel brakes”
RESPONSE: Excessive braking force on the gantry should be a non-issue for this type of crane with this size.
19) QUESTION: Gear Reducers: Please clarify that Gear reducer shall have “A gear driven pump” basically.
Bidder does not expect that low operating oil level during crane operation. Bidder understands that “A replaceable cartridge filter with bypass and visual flow indicator” are required only for when there is “A gear driven pump”.
Your confirmation is requested.
RESPONSE: The replaceable cartridge filter requirement with bypass and visual flow indicator is only required when the reducer is equipped with a gear driven pump.
20) QUESTION: Bearings: Requirements states that each sheave shall have Two widely spaced ball bearings or Two widely spaced cylindrical roller bearings or One double row non-adjustable tapered roller bearing. Bidder requests each sheave shall have One double row cylindrical roller bearing.
RESPONSE: The requirement will not be changed.
21) QUESTION: Bidder requests that drum shall have minimum thickness under groove more than 85% of wire rope diameter. This thickness can be used safely without calculation issue.
RESPONSE: Section 2.3.8: Remove requirement: "The net thickness under the groove shall not be less than the rope diameter unless approved by the Contracting Officer".
22) QUESTION: Bidder requests following deviation Requirements: “The insulation shall be at least class H.” Deviation: “The insulation shall be at least class F.”
RESPONSE: Section 2.4.6: Change where requires "The insulation shall be at least class H" to "The insulation shall be at least class F".
23) QUESTION: Requirements: “Authorized representatives, subsidiaries, or other third parties shall not be used to provide the control software, perform integration, or provide start-up or commissioning services.” Bidder requests: “Affiliated partnership of Control System Supplier” to be approved for design, and integration for The Crane’s drives, control systems, and control software.
24) QUESTION: Requirements: “The converters shall dump excess power to resistors.” Bidder requests:
“The converters shall dump excess power to resistors or using only active front-end drives and regenerate all energy during braking. No DB resistors are used.”
25) QUESTION: Requirements: “All junction boxes and pull boxes shall be sized to a minimum of IEC or NEC requirements, as applicable, plus 20%” Deviation: “All junction boxes and pull boxes shall be sized to a minimum of IEC or NEC requirements, as applicable, plus 10%”
26) QUESTION: Bidder requests following deviation: Requirements: “Rigid conduit shall be galvanized steel with a minimum trade size of 0.75 inch and shall conform to the requirements of ANSI C80.1.” Deviation:
“Rigid conduit shall be galvanized steel with a minimum trade size of 0.75 inch and shall conform to the requirements of ANSI C80.1 or IEC or KS standard”
RESPONSE: IEC standards shall not be used.
27) QUESTION: Bidder requests following deviation: Requirements: “Conduit shall be supported using stainless steel “U” bolts with stainless-steel prevailing torque nuts with elastomeric inserts at the intervals prescribed by the NEC.” Deviation: “Conduit shall be supported using stainless steel or Hot dip galvanized “U” bolts with stainless-steel or Hot dip galvanized prevailing torque nuts with elastomeric inserts at the intervals prescribed by the NEC or IEC”
RESPONSE: IEC standards shall not be used.
28) QUESTION: Bidder requests following deviation. Requirements: “Cables for variable frequency AC (VFAC) motors shall be designed for VFAC use, rated for 600 volts with a peak capacity of at least 2000 volts AC.”
Deviation: “Cables for variable frequency AC (VFAC) motors shall be designed for VFAC use, rated for 600 volts with a peak capacity of at least 1000 volts AC”
29) QUESTION: Bidder requests following deviation. Requirements: “The MV gantry cable reel inverter drive shall be mounted in the electric room and be of the same manufacture and type as the main drive system.”
Deviation: “The MV gantry cable reel inverter drive shall be mounted in the electric room and be of gantry cable reel supplier’s standard. Manufacture will be international brand as per Nidec, GE, Schneider, Siemens, Danforss, ABB etc.”
RESPONSE: Section 2.4.17.1: Replace the first sentence of the last paragraph of with the following: "The MV gantry cable reel inverter drive shall be mounted in the electric room and be of an internationally recognized brand which has suppliers’/manufacturers’ representatives located in the United States."
30) QUESTION: Bidder requests following deviation. Requirements: “The spreader cable reel inverter drive shall be mounted in the operator’s cab/trolley and be of the same manufacture and type as the main drive system.”
Deviation: “The spreader cable reel inverter drive shall be mounted in the operator’s cab/trolley and be of spreader cable reel supplier’s standard. Manufacture will be international brand as per Nidec, GE, Schneider, Siemens, Danforss, ABB etc.,”
RESPONSE: Replace the first sentence of the second paragraph of section 2.4.17.2 with the following:
"The spreader cable reel inverter drive shall be mounted in the operator’s cab/trolley and be of a internationally recognized brand which has suppliers/manufacturers representatives located in the United States."
31) QUESTION: -Requirements: “A Programmable Logic Controller (PLC) shall be mounted on 19” rack or DIN rail…” Bidder requests “GE HPCi system is based on RXi-controller. However, Remote I/O modules are modular, DIN-Rail devices.”
RESPONSE: Section 2.4.23: Replace the first paragraph with the following: "A Programmable Logic Controller (PLC) shall be mounted on a 19” rack, or shall be DIN rail mounted or hard mounted in an enclosure, installed within the air-conditioned electric room"
32) QUESTION: Bidder requests following deviation. Requirements: “The floodlight fixture manufacturer shall have provided their lights on at least five ship-to-shore container handling crane projects located in the United States in the last two (2) years. Floodlights shall be of an US manufacturer with parts stocked in the US.” Deviation:
“The floodlight fixture manufacturer shall have provided their lights on at least five ship-to-shore container handling crane projects located in the United States or international port in the last two (2) years. Floodlights shall be of an US manufacturer or international manufacturer with parts stocked in the US.”
RESPONSE: Concur with change as proposed. Suppliers shall comply with the requirements of the solicitation.
33) QUESTION: Bidder requests following deviation. Requirements: “The Crane operator’s cabin, chairs, and consoles shall be manufactured, assembled, wired, and tested by a single supplier.” For chairs, and consoles, requirement can be implemented Cabin is difficult to follow this requirement.
RESPONSE: Section 2.5.1: Change requirement that: "The Crane operator’s cabin, chairs, and consoles shall be manufactured, assembled, wired, and tested by a single supplier" to "The chairs and consoles for the Crane operator’s cabin shall be manufactured, assembled, wired, and tested by a single supplier".
34) QUESTION: Bidder requests following deviation. Requirements:
“The air conditioning unit shall be designed for industrial use in the United States and shall comply with all applicable regulations at the Government’s Facility.” Deviation: “The air conditioning unit shall be designed for industrial use in the United States or international port and shall comply with all applicable regulations at the Government’s Facility.”
RESPONSE: Requirement does not preclude use of an international manufacturer as a supplier provided the equipment meets United States regulations for industrial use.
35) QUESTION: Requirement: “A minimum of 36 in (910 mm) clearance shall be provided around at least three sides of the main hoist, boom hoist, and trolley drive machinery (for RTT designs) ……” Bidder requests clearance around machineries 24 in (610 mm) in accordance with OSHA
RESPONSE: OSHA specifies minimum clearances. The requirement will not be changed.
36) QUESTION: Bidder is planning to install switchgear and transformer out of Electrical (Control) room.
Those will share roof with Main hoist drives and Boom hoist drives. In this reason Bidder suggest Fire Detection system with Fire extinguisher to switchgear and transformer. Not for Fire suppression system.
RESPONSE: Switchgear and transformer shall be installed in the Electrical Room.
37) QUESTION: Requirement: “The minimum passageway (walkway stair, platform, etc.) shall be 711 mm (28 inches) clear width.” Bidder requests the minimum passageway (walkway stair, platform, etc.) shall be 610 mm (24 inches) clear width in accordance with OSHA
38) QUESTION: Requirement: “All access platforms or walkways shall allow for a minimum of 914 mm (3 ft.) of clearance around machinery and electrical equipment.” Bidder requests all access platforms or walkways shall allow for a minimum of 610 mm (2 ft.) of clearance around machinery and electrical equipment in accordance with
OSHA
39) QUESTION: Bidder requests clarification followings: 3.8.6.1 Spare Parts for Commissioning and Testing; Please confirm that Bidder will prepare Spare Parts for Commissioning and Testing and submit the list of these items. 3.8.6.2 List of Long-Term Wearing and Replacement Parts; Please confirm that Bidder submit only the list of these items. 3.8.6.3 Essential Repair Part Stockage with Pricing; Please confirm that Bidder submit only the list of these items with pricing. The price of these items is not included in contract price. These items are optional.
RESPONSE: Section 3.8.6.1: The government requires the contractor provide a list of parts and consumption items the contractor expects to use during commissioning and testing of the cranes prior to government acceptance. Any unused items from this list remain property of the contractor. Section 3.8.6.2: The contractor only provides the list for the items required using the listing format specified. Section 3.8.6.3, and the referenced Appendix E, defined the spare parts that may be procured under optional CLIN 0003.
40) QUESTION: Please confirm that the DFAR clauses take precedence over the standard FAR Clauses and that the list of qualifying countries applicable to this contract are in accordance with 252.225-7002.
RESPONSE: FAR 52.225-1 is not incorporated into this solicitation. DFARS 252.225-7001 has been incorporated instead and contains a list of qualifying countries. See also, DFARS 252.225-7002 and 252.225-7021.
41) QUESTION: Confirm that “transportation by seas” clause is only applicable to the end product (i.e.
“supplies”) shipped to the FOB Destination point and that (complete) subassemblies shipped to the crane supplier’s assembly location is not required to comply with this requirement. It is our understanding that US Case Law agrees with our interpretation: U.S. Court of Appeals for the Federal Circuit - 926 F.2d 1110 (Fed. Cir. 1991) Feb. 13, 1991
Reference:
https://law.justia.com/cases/federal/appellate-courts/F2/926/1110/258337/
RESPONSE: We cannot provide the requested confirmation. The cited case reviewed the language of a now-outdated version of FAR 52.247-64, rather than DFARS 252.247-7023, which is included in this contract. The Government cannot guarantee any particular interpretation of the terms of the DFARS clauses whose inclusion are set by regulation.
42) QUESTION: Confirm that two cranes will be purchased under any resulting contract and that items 1 and 2 are not options.
RESPONSE: CLINs 0001 and 0002 make up the base price and will be awarded under any resulting contract. CLIN 0003 is an option.
43) QUESTION: This procurement is for the purchase of a commercial item. As we have done in numerous other offers, can we submit our Commercial Small Business Plan to fulfill the requirements of Factor 3.a. Our plan has been accepted in other DOD solicitations for similar commercial equipment supplied under NAIC’s Code 333923.
Information specific to the projects listed in Corporate Experience is not available - as these projects did not have a small business subcontracting requirement or were supplied overseas.
RESPONSE: It is imperative that the contractor respond to the factor completely. The commercial subcontracting plan may be accepted in place of the individual subcontracting plan, but the contractor is still required to provide Attachment H for each contract that had subcontracting opportunities and will still be required to provide the small business participation and commitment strategy document. The contractor should note that just because a contract was worked overseas does not mean that Attachment H is not required. Attachment H is required regardless of whether a subcontracting plan was required. If a contract was awarded/performed entirely overseas AND there were no subcontracting opportunities, then the contractor should provide an explanation to that effect.
No ISRs would be required if a subcontracting plan was not required; in this case, the contractor should state that no subcontracting plan was required due to the overseas nature of the work. As noted in the solicitation, explanations as to why requested information is not available will be considered.
44) QUESTION: Confirm that that the government will not evaluate an offer to the Solicitation if the Offeror participated in creating specific language included in the specification and confirm that the specification was created independently from potential supplier participation of the Technical Specification.
RESPONSE: The Government intends to comply with all applicable requirements regarding Organizational Conflicts of Interest.
45) QUESTION: Is it required that the factory test include gantry traversing a short distance along a set of runway rails with a load? Or Without a load?
RESPONSE: Motor or wheel rotation are acceptable alternatives to gantry travel during factory testing.
Means and measurements to be taken during testing shall be documented in the submitted factory test plan.
46) QUESTION: If necessary for installation of the crane, please confirm that the Government will remove necessary obstructions. From the drawing, it appears necessary to remove at least one Bollard at each crane installation position.
RESPONSE: The contractor will be responsible to work around obstructions shown on the pier drawings as the pier is scheduled to be complete prior to crane delivery. The contractor shall return the pier to original condition if it is modified or damaged during crane installation.
47) QUESTION: Identify any security measures that the offeror shall employ for shipment to this Government Facility. Also, identify the amount of time that the government will require to inspect the shipment from time of readiness to ship to the FOB destination. Please elaborate on the process in order that we may best understand our responsibilities and any delays.
RESPONSE: 1. The offeror is responsible for providing appropriate security measures during shipment.
These measure would include, but not be limited to, physical security, access control to the equipment, and maintaining physical integrity. 2. The facility will be conducting security inspection of the cranes when the transport arrives at the pier. These inspections are not expected to take more than 4 hours per crane. The cranes also will be subject to normal Customs and Immigration inspections as required by the relevant agencies. The offeror is responsible to scheduling these inspections. 3. Shipping of the equipment is the responsibility of the offeror. The government is not imposing requirements beyond a pier side security inspection and those typical for shipping this type of equipment. The government does require a transportation plan be submitted to ensure the offeror has exercised due diligence and ensure risks to the equipment are minimized.
48) QUESTION: Can the time of delivery / completion date be increased to 1095 days?
Reason: There are a significant number of contract / specification requirements and submittals in this solicitation requiring additional time over a typical commercial, industrial STS Crane. When factoring in the time for government response to submittals, a delivery time of 3 years is very realistic.
RESPONSE: The Contract Completion Date is based on prior delivery of similar equipment and data requirements.
49) QUESTION: Can minimum clearance inside legs be reduced to 55’- 6”?
Reason: Requested clearance will provide adequate clearance for container through the legs and is what is typical for an industrial STS crane. Is our standard design acceptable?
RESPONSE: Requirement will not be changed.
50) QUESTION: Can machinery house roof be sloped to drain in one direction to allow for a more standardized design?
RESPONSE: Section 2.2.12: change "The roof shall be sloped to drain in two directions at not less than 1/2-inch fall per 12 inches of horizontal distance." to read "The roof shall be sloped to drain at not less than 1/2-inch fall per 12 inches of horizontal distance."
51) QUESTION: Our boom hoist reeving has two separate ropes with turnbuckles for length adjustment to equalize the loading. Is our standard design acceptable?
RESPONSE: Specified requirement for load equalization within the boom hoist reeving shall be provided.
Use of manually adjusted turnbuckles does not meet this requirement.
52) QUESTION: Please allow for the elimination of the catenary rope support system.
Reason: Total trolley traversing distance is so short that main hoist ropes do not need additional supports to prevent sagging. Is our standard design acceptable?
RESPONSE: Requirement will not be changed.
53) QUESTION: Please allow for alternate trim, list and skew designs such as an electro mechanical screw jack system that would be located in the boom tip area. Is our standard design acceptable?
RESPONSE: Section 2.3.13: Change last sentence from "The trim, list, and skew mechanisms shall be located in the backreach and may be integrated with the snag protection system." to "Trim, list, and skew mechanisms located in the backreach may be integrated with the snag protection system."
54) QUESTION: Please allow for the machinery house and the electrical room to be separate rooms from each other.
RESPONSE: The electrical room is required to be a separate room within the machinery house.
(End of Summary of Changes)
-- Page 1 of 3 --
Contract Number:
Delivery Order Number:
NAVFAC Work Order Number:
Summary of Changes for
Project Title:
The following items are applicable to this change:
1. Specification revision (pre-award question #4):
- Section 1.3.4 Principle Dimension: Add "minimum" after 80°
- Appendix A drawing A2: Change "85° maintenance position" to "80° minimum maintenance position.
2. Specification revision (pre-award question #21):
- Section 2.3.8: Remove requirement: "The net thickness under the groove shall not be less than the rope diameter unless approved by the contracting officer".
3. Specification revision (pre-award question #22):
- Section 2.4.6: Delete the wording "The insulation shall be at least class H" and replace with " The insulation shall be at least class F".
4. Specification revision (pre-award question #29):
- Delete the wording "The MV gantry cable reel inverter drive shall be mounted in the electric room and be of the same manufacture and type as the main drive system" and replace with " The MV gantry cable reel inverter drive shall be mounted in the electric room and be of a internationally recognized brand which has suppliers/manufacturer representatives located in the United States".
MOTCO Container Cranes
Continued from Previous Page:
-- Page 2 of 3 --
5. Specification revision (pre-award question #30):
- Replace the first sentence of the second paragraph of section 2.4.17.2 with the following:
"The spreader cable reel inverter drive shall be mounted in the operator’s cab/trolley and be of a internationally recognized brand which has suppliers/manufacturers representatives located in the United States."
6. Specification revision (pre-award question #31):
-Section 2.4.23: Replace the first paragraph with the following: "A Programmable Logic Controller (PLC) shall be mounted on a 19” rack, or shall be DIN rail mounted or hard mounted in an enclosure, installed within the air-conditioned electric room"
7. Specification revision (pre-award question #32):
- Section 2.4.32.1 replace the wording “The floodlight fixture manufacturer shall have provided their lights on at least five ship-to-shore container handling crane projects located in the United States in the last two (2) years.
Floodlights shall be of an US manufacturer with parts stocked in the US.”
with “The floodlight fixture manufacturer shall have provided their lights on at least five ship-to-shore container handling crane projects located in the United States or international port in the last two (2) years.
Floodlights shall be of an US manufacturer or international manufacturer with parts stocked in the US.”
8. Specification revision (pre-award question #33):
-Section 2.5.1: Change requirement that: "The Crane operator’s cabin, chairs, and consoles shall be manufactured, assembled, wired, and tested by a single supplier" to "The chairs and consoles for the Crane operator’s cabin shall be manufactured, assembled, wired, and tested by a single supplier".
Continued from Previous Page:
-- Page 3 of 3 --
9. Specification revision (pre-award question #50):
- Section 2.2.12: Change "the roof shall be sloped to drain in two directions at not less than 1/2-inch fall per 12 inches of horizontal distance." to read "The roof shall be sloped to drain at not less than 1/2-inch fall per 12 inches of horizontal distance."
10.Specification revision (pre-award question #53):
- Section 2.3.13: Change last sentence from "The trim, list, and skew mechanisms shall be located in the backreach and may be integrated with the snag protection system." to "Trim, list, and skew mechanisms located in the backreach may be integrated with the snag protection system."
Work Order Number: 1396247
TWO SHIP-TO-SHORE CONTAINER CRANES
for
MILITARY OCEAN TERMINAL CONCORD
at
CONCORD, CALIFORNIA
PREPARED BY:
Navy Crane Center
Bldg. 491, Norfolk Naval Shipyard
Portsmouth Virginia 23709-5000
PART 1.0 GENERAL
Definitions
Specifications and Standards
General
US Domestic Codes and Standards and Specifications
International Codes and Standards
Substitution of Codes
Example of List of Codes Used in Industry Procurement Specifications
System Description and Scope of Supply
Scope of Supply
Minimum Criteria
Safety Design Criteria
Design Requirements
Performance Requirements
Unique Identifier Tags
Not Used
Submittals
Quality Assurance
Quality Assurance
Government Inspections
Contractor Quality Control
Process Control Audit
Regulatory Requirements (FAA, OSHA)
Meetings
Post-Award Meeting
Design Review Conference
Functional Description and Presentation
Pre-Manufacturing Conference (Manufacturing Kick-Off Meeting)
Pre-Installation Conference
Delivery, Storage and Handling
Existing Conditions
Contractor Requested Engineering Changes
Warranty
Not Used
Design Life
Minimum Support Period
Duty Cycles and Load Spectra
Main Hoist and Trolley Design Duty Cycle
Gantry Drive Design Duty Cycle
Boom Hoist Design Duty Cycle
Rope Inspection Duty Cycles
Main Hoist Load Spectrum
Trolley Load Spectrum
Gantry Drive Load Spectrum
Boom Hoist Load Spectrum
Other Duty Cycles and Load Spectra
Duty Cycle Analysis Requirements
Load Spectra and Design Life Analysis Requirements
Crane Modes
Primary Operating Mode
Semi-Automated Operating Mode
Passing Mode
Stowed Mode
Cargo Beam Mode
Maintenance Mode
Limping Mode(s)
PART 2.0 PRODUCTS
Materials
Ductile Materials
Structural Steel
Structural Pipes and Tubes
High Strength Bolts, Nuts, and Washers
Aluminum Castings
Iron Castings
Steel Castings
Steel Forgings
Bronze Bushings and Thrust Washers
Steel Bars of Special Quality
Steel Bars of Standard Quality
Alloy Steel Bars
Welding Materials
Charpy V-Notch Impact Requirements
Plate Through-Thickness Requirements
Material Traceability
Mechanical Material
Structural Design
General Requirements
Fracture Critical Members
Access for Inspection
Members Subject to Buckling
Welding
Crane Structure
Trolley Girder
Boom
Connections
Trolley Structure
Trolley Rails, Clips, and Pads
Machinery House
Boom Control Station
Access Structures
Counter Weight (Ballast)
Equalizer Girders and Travel Trucks
Stowed Wind Condition Securing Devices
Hatch Cover Support Structure
Boom Hoist Failure Prevention
Gantry Frame Deflections and Stiffness
Camber
Design Loads
Seismic Design
Design Loading Conditions
Fatigue Design
Allowable Design Stresses
Calculations
Stability
Wheel Loads
Structural Maintenance Program
Voyage Criteria
Mechanical Design
General Requirements
Safety Factors
Machinery Mounting, Installation, and Alignment
Drive Mechanisms
Shafts, Axles, and Pins
Gear Reducers
Bearings
Drums
Wire Ropes
Reeving
Fleet Angles
Catenary Rope Support System
List, Trim and Skew Adjustment
Headblock
Sheaves
Wheels and Guide Rollers
Couplings
Keys and Keyseats
Bumpers and End Stops
Snag Control
Slap Blocks and Rollers
Drip Pans and Catch Basins
Surface Finishes
Seals
Lubrication
Fits
Hydraulic Systems
Brakes
Boom Latch Mechanism
Bushings and Thrust Washers
Electrical Design
General Requirements
Main and Shore Power Supply
Medium Voltage Switchgear
Power Quality Meter (PQM)
Surge Protection Devices (SPD)
Medium Voltage Transformers
Low Voltage Transformers
Drive Control Systems
Converters
Inverters
Power Factor
Motors for the Major Motions
Enclosures
Conduits, Cable Trays, and Fittings
Cables
Terminations and Routing
Cable Reels
Trolley Cable Chain (Energy Chain)
Closed Circuit Television (CCTV)
Marking and Identification
Emergency Modes and Emergency Drives
Controls, Interlocks, and Indicating Devices
Programmable Logic Control (PLC)
PLC Program
Software Version Verification
Control Power Indicator
Anemometer
Emergency Stop Push Buttons
Crane Management System (CMS)
Control System and Network
Remote Crane Management System (RCMS)
Lighting
Convenience Outlets
Space Heaters
Lightning Protection
Intercom
Local Control Stations
Safety Equipment
Other Equipment Design
Operator's Cab
Spreader
Heavy Lift Cargo Beam
Machinery House and Electrical Room
In House Service Cranes
Outside the Machinery House Jib Structure or Monorail
Personnel Elevator
Safety Features
Wire Rope Re-Reeving
Load Weighing System
Wharf Level Cab
Crane Nameplates and Markings
Warning Signs
Test Weight System
Not used
Stairs, Ladders, Platforms, and Walkways
Fall Arrest Anchor Points
Stack Profiling System (SPS)
Compressed Air Distribution System
Manufacture / Erection / Assembly
Corrosion Resistance
Surface Preparation
Paint Application
Faying Surfaces
Galvanizing
Workmanship
Structural Workmanship
Mechanical Workmanship
Electrical Workmanship
Software and Controls
PART 3.0 EXECUTION
Assembly and Erection
Erection Workmanship
Erection Program
Lubrication
Boom Alignment
Crane Weighing
Factory Inspection and Testing
Builder’s Test and Inspection
Government Drawing Verification
Factory Testing
Delivery
Installation and Inspection
Acceptance Test
Final Government Inspection
Acceptance
Training
Operator Training
Maintenance Training
Reliability and Maintenance Requirements
General
Minimum Reliability
Maintainability
Computerized Maintenance Management System
Special Tools
Spare Parts
APPENDICES
A –Reference Documents
A1 – Site plan
A2 – Crane and wharf clearance drawing
A3 – Control system inventory
A4 – Reference crane-wharf interface drawings
B – (Sample) Shop Testing Procedures
C – (Sample) Acceptance Testing Procedures
D – Safety
E – Essential Repair Part Stockage List
F – Structural Details for Cranes
PART 1.0 GENERAL
Definitions
Contractor – the Contractor supplying the Cranes and the Contractor’s representatives, subcontractors, and independent engineers retained by the Contractor.
Contractor’s Engineer of Record (Contractor’s EOR) – the Contractor’s professional engineers, for the design of the structure, ancillary structures, mechanical systems, and electrical systems, who shall be responsible for ensuring that the technical requirements of these Specifications are met. See Section 1.3.8 for other requirements, including for signing and sealing design drawings and calculations.
Cranes, or STS Cranes – the ship-to-shore, rail mounted, container handling gantry Cranes as described in these Specifications, including the structure, trolley, headblock, spreader, all attached and ancillary components, all control systems and components, all monitoring and maintenance systems and components, special tools, spare parts, and all other items defined in these
Specifications.
Global Axis – Crane orientation and analysis axis system referenced in the Specification: X axis parallel to trolley travel, Y axis vertical, Z axis parallel to gantry travel.
MOTCO Facility – to be located at Military Ocean Terminal, Concord (MOTCO), Concord, California, USA. See Appendix A for site plan. See Section 0 for restrictions at the MOTCO
Facility after delivery.
Point of Common Coupling (PCC) – The location where the Crane electrical system is connected to the wharf electrical system, defined as the end of the reeling cable where it terminates on the wharf furthest from the gantry cable reel on the Crane.
Specifications – This Specification, including appendices, and any clarifications, deviations, or other addenda agreed upon between the Government and the Contractor and incorporated into the
Contract. The intent of these Specifications is to provide structural, mechanical, electrical, and functional criteria, dimensions, operating speeds and accelerations, and pertinent details for the design, construction, and installation of reliable and efficiently functioning Cranes with accessories. Unless specifically stated otherwise, the Specification requirements apply to all
Cranes and all components, even if the requirement is stated in the singular. One gender means both genders.
Will and Shall – These Specifications are written to the Contractor. When a provision of this
Specification requires action by the Contractor, the verb “shall” is used. If the Contractor is allowed to exercise an option when limited alternatives are available, the phrasing “either … or
…” is used. However, where the words “or approved equivalent” are used, the Government reserves the option of rejecting the proposed equivalent. Statements provided in the Specification as information to the Contractor use the verbs “may” or “will.” Informational statements typically identify activities or options that “will be taken” or “may be taken” by the Government.
Specifications and Standards
General
The documents below form a part of this Specification to the extent specified herein. In case of difference between the following documents and this Specification, this Specification shall govern to the extent of such difference. In case of material specifications (ASTM), the design shall be based on the issue in effect at the time of bid, but material may be procured in accordance with the issue in effect at the date of manufacture.
Where reference is made to a standard specification, e.g., AWS D1.1, the latest edition in effect on the date of invitation for bids or request for proposal shall apply. If, however, the edition is stated, e.g., ISO 4628/3-1982(E), the stated edition shall apply.
US Domestic Codes and Standards and Specifications
FEDERAL
W-C-375 Circuit Breakers, Molded Case; Branch Circuit and Service
MILITARY
MIL-F-3541 Fittings, Lubrication
FED-STD-595C Color Used in Government Procurement
NAVY SEA SYSTEMS COMMAND (NAVSEA)
OP 3565 Vol. 1 Electromagnetic Radiation Hazards (U) (Hazards to
Personnel, Fuel and Other Flammable Materials) (U)
OP 3565 Vol. 2 Electromagnetic Radiation Hazards (U) (Hazards to
Ordnance) (U)
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
360 Specification for Structural Steel Buildings
ASSOCIATION FOR IRON AND STEEL TECHNOLOGY (AIST)
TR-06 Technical Report No. 6, Specification for Electric Overhead
Traveling Cranes for Steel Mill Service
AMERICAN GEAR MANUFACTURERS' ASSOCIATION (ANSI/AGMA)
908 Geometry Factors for Determining the Pitting Resistance and
Bending Strength of Spur, Helical and Herringbone Gear
Teeth
2015 Gear Classification and Inspection Handbook – Tolerances and Measuring Methods for Unassembled Spur and Helical
Gears (Including Metric Equivalents)
2001 Fundamental Rating Factors and Calculation Methods for
Involute Spur and Helical Gear Teeth
2003 Rating the Pitting Resistance and Bending Strength of
Generated Straight Bevel, Zerol Bevel and Spiral Bevel Gear
Teeth.
2009 Bevel Gear Classification, Tolerances and Measuring
Methods
6013 Spur, Helical, Herringbone, and Bevel Enclosed Drives
6109 For Shaft Mounted and Screw Conveyor Drives Using Spur, Helical and Herringbone Gears
AMERICAN IRON and STEEL INSTITUTE (AISI)
AISI 4320 Properties of alloy steel
AISI 4820 Properties of alloy steel
AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI)
ABMA 7 Shaft and Housing Fits for Metric Radial Ball and Roller
Bearings (Except Tapered Roller Bearings)
A14.3 Ladders - Fixed - Safety
A17.1 Safety Code for Elevators and Escalators
A17.2 Inspectors Manual for Elevators and Escalators
A64.1 Walking and Working Surfaces, Personal Protective
Equipment (Fall Protection Systems)
B4.1 Preferred Limits and Fits for Cylindrical Parts
B17.1 Keys and Keyseats
B30.10 Hooks
S1.13 Measurement of Sound Pressure Levels in Air
Z535 Product Safety Signs and Labels
Z26.1 Safety Code for Safety Glazing Materials for Glazing Motor
Vehicles Operating on Land Highways
AMERICAN PETROLEUM INSTITUTE (API)
5LX Line Pipe
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
7-16 Minimum Design Loads and Associated Criteria for
Buildings and Other Structures
49 Wind Tunnel Testing for Buildings and Other Structures
Paper # 3269 Wind Forces on Structures
AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME)
B30.24 Container Cranes
B46.1 Surface Texture, Surface Roughness, Waviness, and Ly
HST-4 Performance Standard for Overhead Electric Wire Rope
Hoist
AMERICAN SOCIETY FOR NONDESTRUCTIVE TESTING (ASNT)
TC-1A How to Qualify and Certify NDT Personnel
ASTM INTERNATIONAL (ASTM)
A6/6M General Requirements for Rolled Steel Plates, Shapes, Sheet
Piling and Bars for Structural Use
A27 Mild to Medium Strength Carbon Steel Castings for General
Application
A36 Structural Steel
A53 Welded and Seamless Steel Pipe
A106 Seamless Carbon Steel Pipe for High-Temperature Service
A108 Cold-Finished Carbon Steel Bars and Shafting
A123 Zinc Coating (Hot-Dip Galvanized) Coatings on Iron and
Steel Products
A148 High-Strength Steel Castings for Structural Purposes
A153 Zinc Coating (Hot-Dip) on Iron and Steel Hardware
A159 Automotive Gray Iron Castings
A242 High-Strength, Low-Alloy Structural Steel
A275 Magnetic Particle Exam of Steel Forgings
A370 Mechanical Testing of Steel Products, Methods and
Definitions
A434 Quenched and Tempered Alloy Steel Bars, Hot-Rolled or
Cold-Finished
A500 Cold-Formed Welded and Seamless Carbon Steel Structural
Tubing
A501 Hot-Formed Welded and Seamless Carbon Steel Structural
Tubing
A504 Wrought Carbon Steel Wheels
A536 Ductile Iron Castings
A563 Carbon and Alloy Steel Nuts
A572 High-Strength Low-Alloy Columbium-Vanadium Steels of
Structural Quality
A576 Special Quality Hot-Rolled Carbon Steel Bars
A588 High-Strength Low-Alloy Structural Steel
A618 Hot-Formed Welded and Seamless High-Strength Low-
Alloy Structural Tubing
A666 Austenitic Stainless-steel, Sheet, Strip, Plate and Flat Bar for
Structural Applications
A668 Alloy Steel Forgings for General Industrial Use
A673 Sampling Procedure for Impact Testing of Structural Steel
A709 Structural Steel for Bridges
A759 Carbon Steel Crane Rails
A1085 Cold-Formed Welded Carbon Steel Hollow Structural
Sections (HSS)
B6 Zinc (Slab Zinc)
B148 Aluminum Bronze Sand Castings
B271 Copper-Base Alloy Centrifugal Castings
B505 Copper-Base Alloy Continuous Castings
B584 Copper Alloy Sand Casings for General Applications
A1023/A Standard Specification for Stranded Carbon Steel Wire
Ropes for General Purposes
C1036 Flat Glass
D4020-96 Ultra-High-Molecular-Weight Polyethylene Molding and
Extrusion Materials
E23 Test Methods for Notched Bar Impact Testing of Metallic
Materials
F436 Hardened Steel Washers
E543 Standard Specification for agencies performing
Nondestructive Testing
F593 Stainless-steel Bolts, Hex Cap Screws, and Studs
F594 Stainless-steel Nuts
F3125 High Strength Structural Bolts, Steel and Alloy Steel, Heat
Treated, 120 ksi (830 MPa) and 150 ksi (1040 MPa)
Minimum Tensile Strength
AMERICAN WELDING SOCIETY (AWS)
A2.4 Welding Symbols
A4.3 Determination of the Diffusible Hydrogen Content of
Martensitic, Bainitic, and Ferritic Steel Weld Metal
Produced by Arc Welding
A5.1 Carbon Steel Electrodes for Shielded Metal Arc Welding
A5.5 Low-Alloy Steel Covered Arc-Welding Electrodes
A5.20 Mild Steel Electrodes for Flux-Cored Arc-Welding
C4.1 Oxygen-Cut Surfaces and Oxygen Cutting Surface
Roughness Gauge
D1.1 Structural Welding Code
D1.3 Structural Welding Code-Sheet Steel
D1.5 Bridge Welding Code
ASSOCIATION OF IRON AND STEEL ENGINEERS (AISE)
No. 11 Brake Standards for Mill Motors
CRANE MANUFACTURERS' ASSOCIATION OF AMERICA, INC. (CMAA)
No. 70 Specifications for Electric Overhead Traveling Cranes
DEFENSE FEDERAL ACQUISITION REGULATIONS (DFAR)
DFARS 252.211-7003 Item Identification and Valuation
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
C37.20.1 IEEE Standard for Metal-Enclosed Low-Voltage Power
Circuit Breaker Switchgear
C62.11 IEEE Standard for Metal-Oxide Surge Arresters for
Alternating Current Power Circuits
JOINT INDUSTRIAL COUNCIL (JIC)
H-1-1973 Hydraulic Systems
NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION (NEMA)
ICS 1 Industrial Control and Systems
ICS 1.1 Application, Installation and Maintenance of Solid State
Control
ICS 2 Industrial Control Devices, Controllers and Assemblies
ICS 3 Industrial Systems
ICS 6 Enclosures for Industrial Control and Systems
ICS 9 Industrial Control and Systems Power Circuit Accessories
LI 1 Industrial Laminated Thermosetting Products
LS 1 Low Voltage Surge Protective Devices
MG1 Motors and Generators
250 Enclosures for Electrical Equipment (1000 Volts Maximum)
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 National Electrical Code
NFPA 70E Standard for Electrical Safety in the Workplace
NFPA 780 Standard for the Installation of Lightning Protection Systems
OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)
Title 29 CFR, Part 1910
PACIFIC COAST MARINE SAFETY CODE (PCMSC)
RESEARCH COUNCIL ON STRUCTURAL CONNECTIONS (RCSC)
RCSC Specification for Structural Joints Using High-Strength Bolts
STATE OF CALIFORNIA THE DIVISION OF OCCUPATIONAL SAFETY AND
HEALTH (DOSH)
Title 8 Regulations/Inspections for Cranes and Elevators
SOCIETY OF AUTOMOTIVE ENGINEERS, INC. (SAE)
J386 Operator Restraint System for Off-Road Work Machines
J429 Mechanical and Material Requirements for…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.