MILCON PROJECT P-223 MEDICAL/DENTAL FACILITY, CAMP LEMONNIER, DJIBOUTI, AFRICA
TIME & DUE DATE FOR PROPOSALS IS LISTED IN BLOCK 13 BELOW & IN SECTION 00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
SEE SECTION 00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS FOR BASE ACCESS PROCEDURES FOR DELIVERY OF PROPOSALS
SEE SECTION 00100 BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS FOR SITE VISIT INFORMATION OFFERORS ARE ADVISED THAT FUNDING MAY NOT BECOME AVAILABLE. IF FUNDS ARE NOT AVAILABLE, NO AWARD WILL BE MADE AS
A RESULT OF THIS SOLICITATION.
OFFERORS WILL NOT BE REIMBURSED FOR ANY EFFORT OR PROPOSAL COSTS RESULTING FROM THIS SOLICITATION.
KATYA OXLEY 757-322-4221
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Aug-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________820 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________4 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________27 Nov 2017 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
NAVAL FACILITIES ENGINEERING COMMAND
ATLANTIC DIVISION
6506 HAMPTON BLVD
NORFOLK VA 23511
N62470
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
N6247017R5013 41
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
N6247017R5013
Section 00010 - Solicitation Contract Form
DESCRIPTION OF WORK
The project will construct a single-story medical/dental facility for emergency treatment, surgical intervention, primary medical and dental care, evacuation and functions essential to maintenance of the health of the force, and other Role 2 functions. The facility provides functions including immediate lifesaving measures and disease and non-battle injury (DNBI) prevention and care. The facility will have a spread footing, concrete foundation with structural steel framing, and metal roofing. The facility must comply with Anti-Barriers Act and Americans with Disabilities Accessibility Guidelines. Role 2 provides advanced trauma management and emergency medical treatment including continuation of resuscitation started in Role 1. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations, and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings and AFRICOM AT/FP standards. Built-in equipment includes patient head walls in the inpatient and emergency departments, sound attenuation and an emergency generator. Surgical lights, medical gas systems, built-in furniture are also included. The scope of the project also includes demolition of the existing medical/dental facility.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
P223, BASE PRICE
FFP
Price for the entire work for P223 Medical/Dental Facility, in accordance with the drawings and specifications, but excluding work described in Contract Line Item (CLIN) 0002 and CLIN 0003.
FOB: Destination
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION OPTION 01
FFP
Price for providing all work associated with the main entry sun shades, in accordance with the drawings and specifications, but excluding work described in CLINS 0001 and 0003
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
PLANNED MOD 01
FFP
Price for providing work in connection with all labor, material, equipment, transportation, and supervision required for the Furniture, Fixtures, and Equipment (FF&E) and Audio/Visual (A/V) including all work indicated in the contract documents as Option Item 0003, but excluding work described in CLIN 0001 and
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government
0003 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
Section 00100 - Bidding Schedule/Instructions to Bidders
INSTRUCTIONS TO OFFERORS
List of Attachments:
(A) Access Request Form
(B) Base Access Roster
(C) CJTF-HOA Base Access Request Questionnaire
(D) Pre-Proposal Inquiries Submittal Form
(E) One Day Pass Request form – Visitor Pass Request Form
(F) Construction Experience Project Data Sheet
(G) Past Performance Questionnaire
(H) Schedule B
(I) Drawings and Specifications
1. OVERVIEW OF THIS SOURCE SELECTION:
This solicitation is conducted as a negotiated procurement utilizing procedures in accordance with FAR Part 36.2.
The best value continuum source selection process used in this acquisition is the tradeoff process. Award will be made to that responsible offeror whose proposal, conforming to the solicitation, is determined to offer the best value to the Government considering the non-price and price factors stated herein.
The Government reserves the right to eliminate from consideration any or all offerors at any time prior to award of the contract; to negotiate with offerors in the competitive range; to award the contract to other than the offeror submitting the lowest total price; and to award the contract to the offeror submitting the proposal determined to be the best value.
This acquisition will result in the award of a Firm-Fixed Price contract for construction services. The statutory cost limitation is $32,250,000.
The contract completion time is 820 calendar days after notice to proceed.
The Government intends to award a contract to a single contractor for CLIN 0001, with CLIN 0002 as priced option and CLIN 0003 as a planned modification. The Government reserves the unilateral right to award the Option (CLIN 0002) to the contractor at least six months prior to the contract completion date. Offerors must submit a price for each of the CLINs numbered 0001 - 0003. Offerors not submitting pricing for all CLINS will be considered nonresponsive to the solicitation and will not be evaluated. Offerors must submit a price for CLIN 0001 at or below the budget amount to be eligible for award.
INTENT TO AWARD WITHOUT DISCUSSIONS: Proposals must be set forth full, accurate and complete information as required by this Request for Proposal (including attachments). The penalty for making false statements in proposals is prescribed in 18 U.S.C. 1001. The Government intends to evaluate proposals and award without discussions. However, the Government reserves the right to conduct discussions if it is later determined by the Contracting Officer to be necessary. Therefore, each initial offer should contain the best terms from a technical, cost and price standpoint.
2. SITE VISITS
Refer to clause 52.236-27 -- Site Visit (Construction) for information about the site visit.
3. ELIGIBILITY FOR AWARD
SYSTEM FOR AWARD MANAGEMENT
To be eligible for award, your firm(s) must be registered in the System for Award Management (SAM) database as required as required by FAR 52.204-7, System for Award Management (Jul 2013).
See Section 00100 and the following:
Note that the System for Award Management (SAM) is required for all offerors, including Joint Ventures (JV) (registration must state the NAME of the JV). Offerors not currently registered in SAM must obtain a DUN & Bradstreet (DUNS) number and a CAGE or NCAGE prior to registering in SAM.
All offerors, including JV offerors, must submit with their proposal a DUNS number. In addition to the DUNS number required for JV offerors, JV offerors must submit with their proposal a DUNS number for each member comprising the JV. DUNS numbers can be obtained at http://fedgov.dnb.com/webform. The DUNS number is required in order to register in SAM (see above).
CAGE/NCAGE – A CAGE/NGAGE code is required for all offerors, including JV offerors. JV offerors must acquire a CAGE Code registered in the JV name.
(a) U.S. Offerors, including Joint Venture offerors: U.S. offerors must obtain a CAGE Code prior to registering in the SAM database, part of the SAM registration process (see paragraph above).
4. INQUIRIES, PROPOSAL FORMAT AND DUE DATE
All inquiries regarding the Request for Proposal (RFP) shall be submitted electronically to Ms. Erica Walker (Phone (757)322- 8103) by e-mail at erica.s.walker@navy.mil. Offerors are requested to use the Pre-Proposal Inquiries submittal Form (Attachment D).
The Government does not intend to respond to inquiries submitted less than 10 calendar days before the proposal receipt date.
Proposals shall be delivered to:
Commander Naval Facilities Engineering Command, Atlantic Mailroom Bldg A ATTN: ACQ34 Erica Walker 6506 Hampton Blvd Norfolk, VA 23508
All SUBMITTALS SHALL BE RECEIVED PRIOR TO 2:00 PM (EDT), MONDAY, 27 NOVEMBER 2017.
LATE SUBMITTALS WILL NOT BE CONSIDERED.
Proposal must be clearly marked on the outside of the package with the solicitation number. ELECTRONIC
SUBMISSION OF PROPOSALS WILL NOT BE ACCEPTED.
SUBMISSION REQUIREMENTS:
PAGES THAT EXCEED THE PAGE LIMITATIONS SHALL NOT BE EVALUATED.
Non-Price Factors: Offeror shall submit one (1) original, marked “Original”, 2 CDs and four (4) hard copies, each in a separate binder with the following characteristics:
- 8 ½” x 11” format
- 12 point font
- Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone and email address.
- The non-price proposal should only include information in response to Factors 1, 2, 3, and JV agreement (if applicable). Specific page limitations and Solicitation Submittal Requirements are specified in each Factor.
PAGES THAT EXCEED THE PAGE LIMITATIONS SHALL NOT BE EVALUATED.
Special Joint Venture (JV) Requirements:
JV offerors shall provide with their proposal a notarized legal document that establishes the JV. The JV Agreement shall take effect upon the submission of the proposal and remain irrevocable until one (1) year after the work has been finally inspected and accepted by the Government. Submission of the notarized legal document that establishes the JV shall be furnished with the price proposal in its original language version along with a certified English translation of the notarized JV. The Joint Venture must be formed and valid at the time of submission of the proposal. The validated notarized legal document must include language that each member of the JV will be jointly and severably liable for the performance of the whole contract and will be incorporated into the contract award if award is made to the JV.
1. The Joint Venture Agreement shall include, at a minimum, the following:
(a) Name of firms that form the JV and the name of the JV.
(b) Name and title of the corporate officials signing on behalf of each party.
(c) Solicitation number.
(d) Description of the responsibilities in terms of work category for each member (for example:
Firm A performing 100% of ___)
(e) The statement "The composition and structure of the JV will remain unchanged from award to one (1) year after the work has been finally inspected and accepted by the Government.”
(f) Date of issuance of the agreement and notarized signature of the corporate officials signing in behalf of each party.
(g) Statement under oath stating that the Joint Venture (JV) is in compliance at the time of proposal submission with all applicable laws, rules, and regulations. This statement must be signed under oath by all members comprising the Joint Venture.
2. The U.S. Government reserves the right to review the actual JV Agreement to determine its basis and compliance with the applicable laws. Any internal agreements affecting the internal composition of the existing JV and its potential liabilities in relation to the contract (performance guarantee, insurance, etc) will be sent to the Contracting Officer to provide notice of the same. Any change in the composition of the JV will require the JV to formally request a Novation Agreement in accordance with FAR 42.12, which will be approved/disapproved at the discretion of the Contracting Officer.
Price:
Offeror shall submit one (1) original, marked “Original”, a CD and one (1) copy, each in a separate binder with the following:
_ SF-1442, signed and all Amendments (SF30s) Acknowledged _ Completed Schedule B (Att (H) – Offerors should submit prices on the provided Schedule B only _ Documents establishing the Contractor’s responsibility as outlined in the paragraph below _ Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone and email address
_Copy of Representation and Certifications from SAM _The price proposal should only contain information in response to price
CONTRACTOR RESPONSIBILITY: In accordance with Federal Acquisition Regulation (FAR) 9.1, the Contracting Officer shall award contracts only to responsible vendors. No purchase or award shall be made unless the Contracting Officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must have adequate financial resources to perform the contract, or the ability to obtain them.
The Contracting Officer shall require acceptable evidence of the prospective contractor’s current sound financial status, as well as the ability to obtain required resources if the need arises. In regard to resources, the contractor must be prepared to present acceptable evidence of subcontracts, commitments or explicit arrangements that will be in existence at the time of contract award, to rent, purchase or otherwise acquire the needed facilities, equipment, services, materials, other resources or personnel. Consideration of a prime contractor’s compliance with limitations on subcontracting shall be taken into account for the time period covered by the contract base period or quantities, plus option periods or quantities, if such options are considered when evaluating offers for award. Pursuant to FAR
9.104-4, the Contracting Officer reserves the right to request adequate evidence of responsibility on the part of any prospective subcontractor(s). In the absence of information clearly indicating that the prospective contractor is responsible, the Contracting Officer shall make a determination of non-responsibility. As a minimum requirement, all offerors are requested to submit, as part of the price proposal submissions, the following:
1) Latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or at least by an authorized officer of the organization (include Balance Sheet and Income Statement).
2) Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, discuss the financial responsibilities among the companies.
3) Point of contact from a bank or any financial institution with which the offeror transacts business.
The Contracting Officer reserves the right to request additional information if needed.
5. HAND DELIVERIES OF PROPOSALS
All visitors to NAVFAC Atlantic who do not have a CAC badge must have a background check run by the Naval Station Pass & ID office (Security Department at Commander, Naval Region Mid-Atlantic) and be issued a temporary DBIDS (Defense Biometric Identification System) visitor pass.
Visitors who do not have a CAC badge must complete the attached Visitor Access Pass Request form (Excel spreadsheet (Att. (E)). Visitors must complete and forward the form directly to the following personnel in the security department via email:
1. Iris Gholston, 757-322-8116, iris.gholston@navy.mil
2. Robert Hernandez, 757-322-8044, robert.hernandez3@navy.mil
3. Steven K. Anderson, 757-322-8115, steven.k.anderson@navy.mil
Visitors must complete and provide the attached form to the security department at least five working days prior to their scheduled meeting date to allow ample time to process and complete the background check.
Commercial couriers such as FEDEX, DHL or UPS follow the same visitor procedures listed above and they are required to have a background check if they do not have a CAC badge. Commercial couriers must also have their vehicle inspected at location listed in the attached LRA commercial vehicle inspection procedures prior to accessing the LRA.
Firms should check with their intended courier to ensure they have the proper identification credentials to access the LRA.
DBIDS passes must be picked up by the approved visitor from the Naval Station Pass and ID Office located at the following address prior to visiting NAVFAC Atlantic on LRA:
Address: Naval Station Pass and ID Office 9040 Hampton Blvd Norfolk, VA 23505 Telephone Number: 757-322-2975 Hours of Operation: 0700 -1530 on Monday through Friday
6. EVALUATION FACTORS FOR AWARD
1. The solicitation requires the evaluation of price and the following non- price factors:
Non-Price Evaluation Factors:
Factor 1 – Experience Factor 2 – Safety Factor 3 – Past Performance
The distinction between corporate experience and past performance is that corporate experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work described under the definition of recent, relevant projects, in terms of size, scope, and complexity. Past performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
2. The relative order of importance of the non-price evaluation factors is the technical factors (Experience & Safety) are of equal importance to each other and, when combined are equal in importance to the past performance evaluation/performance confidence assessment factor. When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non- price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors’ non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal’s superiority to the Government. Award will be made to the responsible Offeror(s) whose offer conforms to the solicitation and represents the best value to the Government, price and non-cost/price factors considered.
(a) Price:
(1) Solicitation Submittal Requirements: Offeror shall submit one (1) marked “Original,” one (1) copy and one (1) CD, each in a separate three-ring binder with the following:
-SF-1442, signed and all Amendments (SF30s) Acknowledged -Completed Schedule B (Att (H) – Offerors should submit prices on the provided Schedule B only -Include a cover page with Solicitation Number, Solicitation Title, Prime Contractor Name, Address, Phone Number, Fax Number, DUNS, Cage Code, Point of Contact and their phone and email address -Copy of Representation and Certifications from SAM -Required Contractor Responsibility documentation
(2) Basis of Evaluation: The Government will evaluate price based on the total price. Total price consists of the basic requirements and planned modification item (see Section 00010 of the solicitation). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
(b) Non-price Factors:
(1) Factor 1 Experience:
(i) Solicitation Submittal Requirements: The Offeror shall submit a maximum of five (5) relevant construction projects for the Offeror that best demonstrates your experience on relevant projects that are similar in size, scope, and complexity to the RFP. For purposes of this evaluation, a relevant project is further defined as: 1) a new construction project, and 2) featuring construction of at least a single new building that is a minimum of 25,000 square feet.
Projects submitted for the Offeror shall be completed within the past five (5) years of the date of issuance of this
RFP.
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project;
rather Offerors shall submit the work performed under a task order as a project.
The attached Construction Experience Project Data Sheet (Att. (F)) is MANDATORY and MUST be used to submit project information to demonstrate construction experience. Except as specifically requested, the Government will not consider information submitted in addition to this form. Individual blocks on this form may be expanded;
however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages) 8-1/2” X 11” page size. DUNS numbers for the entity that performed the project shall be noted for the construction projects.
For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP (i.e.: unique features, area, construction methods). Failure to do so may result in a project being found non-relevant.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have experience, projects should be submitted for each Joint Venture partner. Projects may be submitted for any joint venture partner; however, offerors who fail to submit experience for each joint venture partner may be considered less favorably. Offerors are still limited to a total of five
(5) projects combined.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the proposal shall clearly demonstrate the manner in which the affiliate/subsidiary/parent/LLC/LTD member firm will have meaningful involvement in the performance of the contract for the experience information of the affiliate/subsidiary/parent/LLC/LTD member companies to be considered. The proposal shall state specific commitments of technical resources (e.g. personnel, equipment) that the affiliate/subsidiary/parent/LLC/LTD member companies will commit to the performance of this contract. In particular, the proposal will clearly state the specific commitments of resources of the affiliate/subsidiary/parent/LLC/LTD member that will be located at the worksites and company offices in the city/area of the project. The proposal shall also describe specific roles of the affiliate/subsidiary/ parent/LLC/LTD member companies in terms of the work it will either self-perform or manage on behalf of the Offeror in performance of the contract.
The Offeror may utilize experience of a subcontractor that will perform major or critical aspects of the requirement to demonstrate construction experience under this evaluation factor. The Offeror must provide a signed letter of commitment from the subcontractor and an explanation of the meaningful involvement that the subcontractor will have in performance of this contract. Substitution of subcontractor(s) shall be avoided to the maximum extent possible, and any proposed substitutions shall have verifiable, equivalent experience to the subcontractor being replaced.
(ii) Basis of Evaluation: The basis of evaluation will include the Offeror’s demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects for construction. Any projects submitted in excess of the five (5) for Construction Experience will not be considered.
The Offeror may be considered more favorably if:
1. Relevant projects that demonstrate construction experience with medical clinics or hospital buildings may be considered more favorably than those that have do not have medical construction experience.
2. Relevant projects that demonstrate construction experience in logistically challenging areas may be considered more favorably than those that do not have construction experience in logistically challenging areas. Logistically challenging areas are defined as location possessing unskilled local labor and significant challenges concerning mobilization of labor, materials, and equipment.
3. Relevant projects that demonstrate construction experience performed for the U.S. Government may be considered more favorable than those that do not.
4. Relevant projects that demonstrate construction experience performed as a prime contractor versus a subcontractor may be considered more favorable than those that are not.
(2) Factor 2, Safety.
(i) Solicitation Submittal Requirements: The Offeror shall submit the following information:
(For a partnership or joint venture, the following shall address each contractor who is part of the partnership or joint venture; only one safety narrative is required.) Describe the offeror’s technical approach to safety for its employees as well as the plan that the Offeror will implement to evaluate and measure safety performance of potential subcontractors, as a part of the selection process for all levels of subcontractors. Also, describe any innovative methods that the Offeror will employ to ensure and monitor safe work practices at all subcontractor levels. The Safety Narrative shall be limited to three pages, 8 ½ x 11 page size (e.g., one (1) double-sided page plus one (1) single-sided page; or three (3) single-sided).
(ii) Basis of Evaluation: The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The Government will evaluate the Offeror’s plan to select and monitor subcontractors, and any innovative safety methods that the Offeror plans to implement for this procurement.
The Government’s sources of information for evaluating safety may include, but are not limited to, Government agencies, OSHA, NAVFAC’s Facility Accident and Incident Reporting (FAIR) and Contractor Incident Reporting System (CIRS) databases, and other related resources. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete safety information regarding these submittal requirements rests with the Offeror. The evaluation will collectively consider the Offeror’s technical approach to safety and other sources of information available to the Government. The Government will also evaluate the narrative to determine the degree to which subcontractor safety performance will be considered in the selection of all levels of subcontractors on the upcoming project.
Finally the evaluation of the Offeror’s safety narrative will consider any innovations proposed to determine the degree to which they may enhance safety on this procurement. Those Offerors whose plans demonstrate a commitment to hire subcontractors with a culture of safety and who propose innovative methods to enhance a safe working environment may be given greater weight in the evaluation.
(3) Factor 3, Past Performance:
(i) Solicitation Submittal Requirements: The Offeror shall submit the following information:
If a completed Construction Contractor Appraisal Support System (CCASS) or Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1 - Experience. AN OFFEROR SHALL NOT SUBMIT A PPQ WHEN A COMPLETED CCASS OR CPARS IS AVAILABLE. If there is not a completed CCASS or CPARS evaluation then the offeror must submit Past Performance Questionnaires (Att. (G)) for each project included in Factor 1 - Experience. The Offeror should provide completed Past Performance Questionnaires (PPQ) with the proposal. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). The Government may make reasonable attempts to contact the client noted for that project(s) to obtain the PPQ information. However, Offerors should follow-up with clients/references to help ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Ms. Erica Walker at Erica.s.walker@navy.mil.
IMPORTANT: It is the responsibility of the offeror to provide accurate points of contact for each identified contract and current telephone numbers and/or email addresses. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified.
The Government reserves the right to contact references for verification or additional information. The Government’s inability to contact any of the Offeror’s references or the references’ unwillingness to provide the information requested may affect the Government’s evaluation of this factor.
Offerors may provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 – Experience. Offerors may also address any adverse past performance issues. Such explanations shall not exceed two (2) double-sided pages (or four (4) single-sided pages) in total.
Performance awards or additional information submitted will not be considered.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
(ii) Basis of Evaluation: This evaluation focuses on how well the Offeror performed on the relevant, recent projects submitted under Factor 1 – Experience and past performance on other projects currently documented in known sources. More emphasis will be placed on more relevant projects. In addition to the above, the Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources including sources outside of the Government. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS) using all CAGE/DUNS numbers of Contractors who are part of a partnership or joint venture identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror.
The Government will also evaluate the degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., PPIRS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and information obtained from any other source) reflect a trend of satisfactory performance considering:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.);
- Recency of tasks performed that are identical to, similar to, or related to the task at hand; and
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in the Contractor’s performance. This evaluation is separate and distinct from the Contracting Officer’s responsibility determination. The assessment of the Offeror’s past performance will be used as a means of evaluating the Offeror’s probability to successfully meet the requirements of the RFP.
Offerors lacking relevant past performance history will not be evaluated favorably or unfavorably in past performance and will receive a Neutral Confidence rating.
7. PERFORMANCE GUARANTEE / BOND
PERFORMANCE GUARANTEE (replaces FAR 52.228-15, NFAS 5252.228-9305, and NFAS 5252.228-9306.)
Ten-Percent (10%) PERFORMANCE GUARANTEE
The Offeror whose offer/proposal is accepted shall provide, within ten (10) days after award, either (1) a notarized Performance Guarantee letter or (2) Performance and Payment Bonds conforming to the requirements below. If the Offeror fails to provide either (1) a Performance Guarantee letter or (2) Performance and Payment Bonds within ten
(10) days, the contract may be terminated for default. In such event, Offeror shall be liable for any cost of re-procuring the work that exceeds the amount of its offer.
Form of Performance Guarantee Letter. The Performance Guarantee letter shall be accompanied by a notarized document authenticating the financial institution's authority to sign the letter. An English translation of the Performance Guarantee letter shall be submitted at the same time.
Performance Guarantee: An amount equal to ten percent (10%) of the amount of the contract shall be deposited into a properly certified banking institution, which will then issue an irrevocable letter guaranteeing the payment of the amount deposited plus any applicable interest, to the United States Government, upon demand by the Contracting Officer. Demand will be made if the Contractor fails to comply with the terms and conditions of the contract, or does not fulfill its undertaking in whole or in part. Payment to the Contracting Officer will be by check made payable to the "United States of America by the U.S. Department of the Navy, Naval Facilities Engineering Command, Europe, Africa, Southwest Asia."
The Performance Guarantee shall take effect upon the date of signature of the Performance Guarantee letter and shall remain valid and irrevocable until one (1) year after the work has been finally inspected and accepted by the Government.
SAMPLE OF PERFORMANCE GUARANTEE ISSUED BY A BANK
The Government will accept as valid a Performance Guarantee conforming to these requirements.
BANK LETTERHEAD Date To: United States of America U.S. Department of Navy Contracting Office (FEA/IPT put in your address)
Attention: Contracting Officer
This is a letter of performance guarantee. I/We, the undersigned, acting as the duly authorized representative(s) of the Bank, declare that the Bank hereby guarantees and is jointly and severally liable as guarantor with the Contractor named below to effect payment to the Contracting Office that issued the contract stated below, by check made payable to the “United States of America by the U.S. Department of the Navy, Naval Facilities Engineering Command Europe Africa Southwest Asia,” within five (5) calendar days after receipt of a simple written request by registered mail, return receipt, in amount up to sum of (Amount equal to ten (10%) percent of the contract amount in the currency stated in the contract), which represents the deposit required of the Contractor to guarantee fulfillment of his obligations for the satisfactory completion and timely performance of the work under Contract No. (insert contract number) for (insert description of services and location), in strict compliance with the terms, conditions and specifications of said contract entered into between the United States of America by the U.S. Department of Navy, Naval Facilities Engineering Command Europe Africa Southwest Asia and the Contractor (insert name of Contractor) on (insert contract date), plus legal interest to be calculated from the date of receipt of the registered letter of request by the Contracting Officer to the date of actual payment, without any need for the Contracting Officer to take any legal action or obtain the prior consent of the Contractor, or for any other proof, action or decision by any other authority. The request by the Contracting Officer shall simply inform the Bank that the Contractor failed to comply with the terms and conditions of the contract, or did not fulfill his undertaking in whole or in part.
I/We agree and consent that said contract may be modified by change order or supplemental agreement affecting the amount or the period of performance of the contract without prior consent of the Bank and without affecting the validity of this guarantee; provided, however, that the amount of this guarantee shall remain unchanged.
This letter of performance guarantee will continue in effect without change in amount or terms until one year after the work has been finally accepted by the Government through its Contracting Officer’s legal representative.
(BANK NAME & ADDRESS) (CONTRACTOR NAME & ADDRESS)
Signed by: Signed by:
(Typed name) (Typed name)
(Title) (Title)
(This Performance Guarantee shall be accompanied by a notarized document authenticating the bank agent’s authority to sign the letter of performance guarantee for the bank company.)
Performance and Payment Bonds. In lieu of a performance guarantee letter in the above stated form, the Contractor may submit performance and payment bonds in which the Contractor and the surety obligate themselves in the amount of ten percent (10%) of the contract price, that the Contractor shall undertake the performance of the contract, shall make all required payments to subcontractors, and that said performance and payment bonds ensure the fulfillment of all agreements contained in the contract.
a. The bonds shall be from a registered bank, bonding firm, or registered insurance firm approved by the Contracting Officer.
b. The bonds shall be of the U. S. standard type or of another approved type and shall include the following concepts: (1) name of Surety and name of agent signing in behalf of Surety; (2) name of Principal; (3) a statement that the Principal and Surety are firmly bound on the United States of America in the penal sum of the bond; (4) Contract number; (5) Penal sum of bond and the statement "This bond will be in force until the Contracting Officer of the above-cited Contract authorized cancellation of the bond"; and (6) date of issuance of bond and signature of Surety's agent.
Section 00600 - Representations & Certifications
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2016 52.204-8 Annual Representations and Certifications JAN 2017 52.209-7 Information Regarding Responsibility Matters JUL 2013 52.233-2 Service Of Protest SEP 2006
CLAUSES INCORPORATED BY FULL TEXT
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2017)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date.