N6134023R0058 Amendment 0009.docx

DOCX document 45 KB Posted

Attached to
SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS) Federal contract opportunity
Solicitation number
N6134023R0058
Issued by
Department of the Navy Naval Air Systems Command

View the file

Other files for this federal contract opportunity

Other files attached to SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS), newest first.
File Type Posted
N6134023R0058 Amendment 0013.pdf PDF
N6134023R0058 Amendment 0013 - Conformed Copy.docx DOCX document
J-1_SWMFTS_SOW_Rev_2_FINAL.docx DOCX document
N6134023R0058 Amendment 0011 - Conformed Copy.docx DOCX document
N6134023R0058-0010_QandA Matrix_6_01_Amendment_0010.xlsx XLSX spreadsheet
N6134023R0058 Amendment 0009 Conformed.pdf PDF
Attachment L-C1 Pricing Worksheet_Amendment_7.xlsx XLSX spreadsheet
N6134023R0058_Amendment_0005_Conformed.pdf PDF
SWMFTS_Pre-Proposal_Conference_09May23.pptx PPTX presentation
N6134023R0058_Amendment_0004.docx DOCX document
N6134023R0058 Amendment 0003.pdf PDF
N6134023R0058 Amendment 0003 Conformed.docx DOCX document
N6134023R0058 Amendment 0003.docx DOCX document
J-8-a_SWMFTS_WD 15-4089_Rev-22_Newport_RI_12.27.2022.pdf PDF
J-1_SWMFTS_SOW_Rev_0_Final.docx DOCX document
J-2_DD_254_PLAN_N61340-22-R-0058_SWMFTS.pdf PDF
N6134023R0058 Amendment 0001.docx DOCX document
Attachment L-T2 Technical Experience.xlsx XLSX spreadsheet
J-8-g_SWMFTS_WD 15-5635_Rev-21_North Island and Camp Pendleton_CA_12.27.2022.pdf PDF
J-8-d_SWMFTS_WD 15-4561_Rev-22_Pensacola_FL_12.27.2022.pdf PDF
Exhibit CDRL B003_DI_MGMT_80934C Contractors Operational Security Plan.pdf PDF
N6134023R0058 Amendment 0001.pdf PDF
J-4_SWMFTS_Data_Item_Transmittal_Form.pdf PDF
J-8(a)_SWMFTS_WD 15-4089 Rev-22 Newport RI_12272022.pdf PDF
J-8(h)_SWMFTS_WD 15-5781 Rev-20 Cherry Point NC_12272022.pdf PDF
J-6_SOFA-22-401.1-Japan-Defense-SMA.pdf PDF
J-1_SWMFTS_SOW_Final.pdf PDF
J-4 SWMFTS_Data_Item_Transmittal_Acceptance_Rejection_Form_01.31.23 (1).pdf PDF
J-7_SWMFTS_CDRL Address List.docx DOCX document
Attachment L -C1 Pricing Worksheet.xlsx XLSX spreadsheet
J-8(c)_SWMFTS_WD 15-4539 Rev-20 Jacksonville FL_12272022.pdf PDF
RFP SPS 4-10-2023-N6134023R0058rev1.docx DOCX document
Exhibit CDRL B002_DI_ADMN_81505 Contractor Provided Meeting Minutes.docx DOCX document
J-2 DD 254 PLAN N61340-22-R-0058 - SWMFTS-signed.pdf PDF
Attachment L-P1 Past Performance Summary Tables.xlsx XLSX spreadsheet
Attachment L-P2 Past Performance Contract Data.xlsx XLSX spreadsheet
J-3_SWMFTS_Surveillance Activity Checklist_01.31.23 (1).doc DOC document
J-1_SWMFTS_SOW_Draft_v4_Clean.pdf PDF
Exhibit CDRL B003_DI_MGMT_80934C Contractors Operational Security Plan.docx DOCX document
Attachment L-P2 Past Performance Contract Data.xlsx XLSX spreadsheet
Attachment L-Q2 Section L Questionaire (1).xlsx XLSX spreadsheet
Attachment L-P1 Past Performance Summary Tables.xlsx XLSX spreadsheet
J-8(e)_SWMFTS_WD 15-5475 Rev-1 Yuma AZ_12-27-2022.docx DOCX document
Attachment L-C1 Pricing Worksheet.xlsx XLSX spreadsheet
Exhibit CDRL B001_DI_MGMT_80227 Contractor Progress Status and Management Report.docx DOCX document
J-8(d)_SWMFTS_WD 15-4561 Rev-22 Pensacola FL_12-27-2022.docx DOCX document
Attachment L-C4 Sample of Completion Effort P-8.docx DOCX document
Attachment L-C3 Sample of Completion Effort MQ-4C.docx DOCX document
J-8(c)_SWMFTS_WD 15-4539Rev-20 Jacksonville FL_12-27-2022.docx DOCX document
N6134023R0058 - SWMFTS - Final Draft RFP - 3-9-2023.docx DOCX document
Show all 50

SOFTWARE MAINTENANCE OF FIELDED TRAINING DEVICES (SWMFTS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N6134023R0058

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION M - EVALUATION FACTORS FOR AWARD

The following have been modified:

SECTION M

EVALUATION FACTORS

Part A. GENERAL INFORMATION

1.0 GENERAL

The Government expects to select one Offeror whose proposal provides the best value, to the Government, using the trade-off analysis. "Best value" means the expected outcome of an acquisition that, in the Government's estimation, provides the greatest overall benefit in response to the requirement. The Offeror is advised that the lowest priced proposal meeting the solicitation requirements may not be selected for an award if award to higher priced Offeror is determined to be more beneficial to the Government. However, the perceived benefits of the higher priced proposal must merit any additional price.

The government will not evaluate classified proposals or any classified information.

2.0 EVALUATION PROCESS

The Government intends to award without discussions. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer (CO) to be necessary.

For the Technical factor an acceptable/unacceptable rating will be assigned. Offerors are advised that during the evaluation process, a technical factor with an “Unacceptable” rating will be unawardable. If an offeror’s Technical proposal is Unacceptable, the government will not evaluate the other factors.

For Past Performance, the Government will assign a Performance Confidence Assessment Rating. The assessment reflects the government’s level of confidence in the offeror’s ability to successfully perform the solicited effort based on the offeror’s record of recent and relevant past performance.

The government will utilize a Cost Realism approach to determine the Probable Cost/Price (PC/P)/Price (PC/P). The higher of the PC/P or proposed cost/price will be used in the tradeoff.

3.0 EVALUATION FACTORS FOR AWARD

Proposals will be evaluated using the factors, listed below.

Each offeror will be evaluated based on the following factors:

(1) Technical

(2) Past Performance

(3) Cost/Price

Past-Performance is significantly more important than price/cost.

PART B: SPECIFIC INFORMATION

1.0 TECHNICAL

1.1 Security Clearance. The government will confirm that the name, address, and CAGE Code listed in Attachment L-T1 is the prime contractor or JV Team Member and matches the information for one of the entities in the table in Administrative. If the information does not match that of the prime contractor or JV Team Member and the information in the table in Administrative, then the proposal is Unacceptable. If the information does match, then the government will check National Industrial Security System (NISS) using the name, address, and CAGE Code provided in Attachment L-T1. If that entity does not have a facility clearance in NISS at that time, then the proposal is Unacceptable.

1.2. Technical Experience. The government will review Attachment L-T2 and the related, submitted contract/order(s). The government will review the cited portion of the contract/order(s) to confirm the offeror was required to manage performance at a site in a foreign country (excluding U.S. territories) and at least two sites simultaneously CONUS. The government will only consider the contract/orders itself (not documents external to the contract/order like emails, report submittals, or self-assertions) in assessing whether the offeror demonstrates that the contract/order(s) required the management of the above sites. The government is not obligated to search the contract/order documents on any page/paragraph that is not cited in Attachment L-T2. If the contract/order(s) does not demonstrate that the offeror was required to manage performance at a site in a foreign country (excluding U.S. territories) and at least two sites simultaneously CONUS, then the proposal is Unacceptable.

If either the Security Clearance element or the Technical Experience element is Unacceptable, then the proposal is unawardable and the government will not evaluate the other factors or further consider the proposal.

2.0 PAST PERFORMANCE

Under Past Performance, the Government will evaluate recent and relevant performance to determine how well an Offeror has performed work similar to the work required by the solicitation. When proposals are received from Joint Ventures and subcontractors, specifically formed by the Offeror to propose on a particular acquisition, the past performance evaluation will consider individual JV team member’s relevant past performance. There are three aspects to the past performance evaluation: recency, relevancy, and demonstrated past performance. After evaluating the Offeror’s past performance information, the government will assign a Performance Confidence Assessment Rating. More relevant past performance will typically be a stronger predictor of future success and have more influence on the Performance Confidence Assessment Rating than past performance of lesser relevance. In the case of an Offeror without a record of relevant past performance, the Offeror will receive a Performance Confidence Assessment Rating of “Unknown Confidence (Neutral)” which is considered a “Neutral” rating.

The government will evaluate a maximum of two proposed past performance references. If the Offeror attempts to submit more than two references, the government will only evaluate the first two references listed in Attachment L-P1 of the Offeror’s proposal. The government will only consider Past Performance Questionnaires if no CPAR exists.

The government will evaluate the Offeror’s proposed past performance references, specifically the portions of the references identified in the Offeror’s Attachment L-P2. The government has no duty to search for missing pieces of the contract or to search parts of the contract that is not cited by the Offeror in Attachment L-P2. Moreover, the government will not consider any statements or descriptions of the past performance references that are not included within the contracts themselves. For example, the government will not consider document deliverables under the contract or offeror self-descriptions of work performed.

2.1 Recency - The first aspect of the past performance is to evaluate the recency of the Offeror’s past performance being evaluated. Recency as it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant.

Past performance will be considered recent if the contract/order has been performed within three years of the final solicitation release date. If any portion of a reference’s performance occurred within the three year window, then the government will consider all performance under the contract (or order, in the case of orders under IDIQs). Past Performance that is not recent will receive no further consideration, with no opportunity to submit a replacement, even if the government requests revised proposals.

For single-award indefinite delivery past performance references, only the task or delivery orders (maximum of two) submitted for consideration will be evaluated for recency, not the base contract.

2.2 Relevancy - The second aspect of the past performance evaluation is to evaluate how relevant the Past Performance being evaluated is to the requirements of this solicitation. The government will evaluate the past performance references to determine how relevant each is to this solicitation.

Any past performance reference found to be Not Relevant will receive no further consideration, with no opportunity to submit a replacement, even if the government requests revised proposals.

In determining relevancy, the government will compare the contract types (cost or fixed price), the location and divisions of the company that performed the effort (CAGE Code), scope (tasking similar to Attachment J-1 SOW, paragraph 3.2.1), magnitude (total dollar value), and complexity (number of total sites managed and number of sites outside the United States managed) of the past performance reference effort to the effort required by this solicitation.

For single award IDIQ contracts the Government will aggregate the information for up to a maximum of two orders submitted in the proposal when assessing relevance. Orders with performance at the same site will only count as one site when aggregated. Orders under MACs will be assessed as individual references.

Only past performance of the Offeror (including JV Team Members and major subcontractors) is relevant. The government will only consider past performance of some other CAGE Code if (1) the Offeror demonstrates that it acquired that other CAGE Code through a corporate acquisition, reorganization, merger and the personnel, facilities, or other resources of that that other CAGE Code are now a part of the Offeror and will be used to perform the requirements of the solicitation, or (2) the government is required by 13 CFR 125.11 to consider the past performance where the Offeror submits the information required by 13 CFR 125.11.

Rating
Definition
Very Relevant
Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

2.3 Demonstrated Past Performance - The third aspect of the past performance evaluation is to evaluate the overall quality of the Offeror’s recent and relevant past performance. The Government will evaluate the Offeror, MAJOR subcontractors, and JV team members’ performance and focus its evaluation on the following areas:

1) Technical: Quality of Product or Service,

2) Cost Control,

3) Management.

A separate demonstrated past performance rating will not be assigned.

For those cases where the Offeror may have had past performance problems likely to occur again, the government will assess whether the Offeror successfully applied improvements to resolve those problems. Problems not addressed by the Offeror are considered to still exist.

Sources of past performance evaluation information may include information provided by the Offeror in response to the solicitation, information obtained from questionnaires, and any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information Systems, Electronic Subcontract Reporting System, or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.

Past performance information that obviously does not relate to the order(s) submitted under a single award IDIQ will not be considered.

2.4. Performance Confidence Assessment - The Past Performance evaluation culminates in the Performance Confidence Assessment Rating. The Performance Confidence Assessment Rating reflects the Government’s confidence that the Offeror will successfully perform the solicitation’s requirements based on the Offeror’s recent and relevant past performance record. While the government will evaluate the past performance references the Offeror submits as its best, most relevant references, the government may also take into account any show cause notices, cure notices and terminations for default on any contract performed within three years of the issuance date of the final solicitation. In assigning a Performance Confidence Assessment Rating and/or in the source selection authority’s tradeoff decision:

a. More relevant past performance will typically be a stronger predictor of future success and have more influence on the Past Performance Confidence Assessment than past performance of lesser relevance.

b.Past performance of an entity proposed to perform a significant percentage of the work (as indicated in Attachment L-P1) is more significant than past performance of an entity proposed to perform relatively little work;
c.Past performance of an entity proposed to perform the Attached J-1, SOW, paragraph 3.2.1 tasking is more significant than past performance of an entity proposed to perform other portions of the Attachment J-1, SOW tasking;
d.Performance under United States government contracts, or under first tier sub contracts of small businesses under U.S Government contracts, is more significant than performance under commercial contracts.
e.Past Performance Questionnaires provided by another member of the offeror’s proposed team, an entity affiliated with the Offeror (e.g. parent, subsidiary), or by a competing offeror is not given as much weight as information from the Government or a disinterested third party.
f.Past performance of prime contractor or a JV member is relatively more significant than past performance of a subcontractor

The Government will employ the Performance Confidence Assessments Rating Method described in the table below. In the case of an Offeror without a record of recent relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the Offeror shall be determined to have unknown or neutral past performance.

Rating
Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Limited Confidence
Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort.

3.0 COST/PRICE

The Government will evaluate the Cost/Price Volume to assess: the probable price cost (PC/P), reasonableness, unbalanced pricing, and cost realism.

3.1 Probable Cost/Price. The probable cost/price (PC/P) is an Offeror’s total cost, including fee, and any additional adjustments the Government has determined necessary to make the proposed cost realistic for all periods. The PC/P also includes the firm fixed price efforts (mobilization), burdened ODCs, the Government-provided completion task estimates, and Government-calculated value of FAR 52.217-8, Option to Extend Services. The Government will calculate the value of the burdened ODCs by applying the rate proposed in G.2 to the Government provided estimates in Attachment L-C1, “ODC” tab. The Government will calculate the value of FAR 52.217-8, Option to Extend Services for evaluation purposes only by dividing the probable cost of Year 7 under every tab in the offeror’s completed Attachment L-C1 Pricing Worksheet by 50%.

The PC/P may differ from the proposed cost/price. The higher of the PC/P or proposed cost/price will be used for purposes of evaluation to determine the best value. Contract awarded value, however, will be based upon the successful Offeror’s proposed cost/price.

3.2 Reasonableness. Normally, competition establishes price reasonableness. It is expected that the award decision will include a determination that there is adequate price competition and that the proposed prices are reasonable. In limited situations, additional analysis will be required by the Government to determine reasonableness. If, after receipt of a proposal, the Procuring Contracting Officer determines that adequate price competition does not exist and a determination is made that none of the exceptions in FAR § 15.403-1(b) apply, the offeror may be requested to provide certified cost and pricing data in accordance with FAR § 15.403-4. In accordance with FAR 15.404-1(b)(2), various price analysis techniques and procedures will be employed to ensure the prices being proposed for this requirement are fair and reasonable. To assist in the overall determination of price reasonableness, the Government will identify all instances where a proposed fully burdened labor cost exceeds the tripwire amount of $300K annually per employee. This also applies to a fully burdened subcontractor employee labor cost, inclusive of the prime contractor’s pass-through burden. An exceeded tripwire may ultimately be determined unreasonable absent justification.

3.3 Cost Realism. Except for otherwise unacceptable proposals when awarding on initial proposals, the Government will perform a cost realism analysis in determining the probable cost/price (PC/P) for each applicable offeror’s proposal. In conducting its cost realism evaluation, the Government will compare the Offeror’s proposal rates in the offeror’s completed Attachment L-C1 Pricing Worksheet to the substantiating documents provided in the Offeror’s proposal. The Government may also consider other pertinent cost information, such as average labor rate information and DCAA-recommended rates for such costs as direct labor, overhead, G&A, Glassdoor.com, Indeed.com and Salary.com.

3.4 For proposal preparation purposes a Man-Year is calculated at 2,080 hours.

4.0 ADMINISTRATIVE

Each offeror’s proposal will be evaluated to determine whether the offeror completed the information requested in Section L Part B, paragraph 4 of this solicitation. The information below is not part of the source selection authority’s “best value” tradeoff, but some of the information may be necessary for an offeror’s proposal to be acceptable for contract award. Unless otherwise noted below, any questions to offerors to resolve issues with the items below are not considered “discussions” as that term is used at FAR subpart 15.3, even if the information below is necessary for contract award. Unless otherwise noted below, any questions to offerors to resolve issues with the items below are considered informalities or minor irregularities rather than deficiencies that make an offeror unacceptable for award, even if the information below is necessary for contract award. The failure to comply with the government’s requests, however, may adversely impact the offeror’s evaluation results, and could result in the offeror being removed from consideration for award.

This volume contains the following Information:

A. Offeror Representatives and Information B. Terms and Conditions statement C. Joint Venture Agreement, if proposing as a joint venture D. Signed Completed and signed SF33 for basic solicitation and completed and signed SF30(s) for all amendments.

E. Signed Representations, Certifications and Acknowledgements and/or System for Award Management (SAM); completed copies of all certifications listed in Section K, F. Proposal validity for at least 270 days after proposal submission.

G. Documentation verifying that the Offeror, JV and Subcontractors has a DCMA approved Accounting System in accordance with DFARS clause 252.242-7006, or state that it’s Accounting System has not been approved by DCMA.

H. Completed table from Section L, Part B, paragraph 4.H that complies with FAR 52.219-14.

I. Complete Table B-3 based on rates proposed in Attachment L-C1.

52.217-5EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

(End of Summary of Changes) image1.wmf