N61340-19-R-0062 AATCC CATCC

QuestionReferenceAnswerReferenceParagraphPageSource
1SOW 4.0.a, Configuration Management Requirements, states "The Contractor shall verify that their Configuration Management Plan (CMP) on file with the Government under the TSC IV contract is still valid and in compliance with SAE/EIA-649-1 Configuration Management Requirements for Defense Contracts." As the TSC IV IDIQ contract did not require submission of a CMP, recommend the Govt modify this requirement.Statement of Work PMA205-18-GT-15G30-SOW-001, section 4.0.aThe CMP has been removed from SOW and is no longer a requirement.Industry Day
2Request clarification on PRF 090044, 3.1.1.1 and 3.1.1.2 Technical Performance Parameters for the AATCC/CATCC. How would this 100% accountability be measured and verified? Request access to documentation for a representative simulator syllabus event.Performance Specification, PRF 090044, sections 3.1.1.1 and 3.1.1.2The 100% accountability of the Technical Perfromance Parameter will be confirmed during the Mission Test phase by a successful complketion of each courses Performance Run (P-run) scenarios.Industry Day
3SOW 2.1, Government Documents. Request access to the Systems Engineering Plan, 205-18-GT015G30-SEP-001.Statement of Work PMA205-18-GT-15G30-SOW-001, para 2.1 Government DocumentsWill be provided as GFI. For access to GFI, please submit the GFI request form to the contract specialist.Industry Day
4Will the Government be providing respondants to the 4 Jan 2019 ASATS Sources Sought (SS) a summary of its analysis of industry SS submissions?Sources Sought, N6134919R0062, for Device 15G30 Block UpgradeNo, respondents will not receive an analysis of their sources sought submission. The sources sought conducted by the government was to assist in determining the acquisition strategyIndustry Day
5Will a draft RFP with Sections L and M be posted for industry comment? If so, in which month?It is currently planned to have a draft RFP posted for industry comments in April. Section L & M is planned to be included.Industry Day
6Will the 20 Feb 2019 Industry Day presentation slides be posted for download?Yes, they will be posted with the Industry Day Q&A.Industry Day
7Would the Government be willing to accept alternate proposals?No, alternate proposals will not be accepted.Industry Day
8Is it a requirement to resume a scenario in real time after the scenario is recorded and played back?Spec para 3.1.2.1.10 and 3.1.2.2.7Resuming a scenario in real time (flyout) after playback is not a requirement.Industry Day
9Will a diagram of the new AATCC layout be provided?Spec para. 3.1.2.2.20The new layout of AATCC has been added to the specification.Industry Day
10Is an ATO required?SOW para 3.2.2.2Yes, Device 15G30 will require an ATO upon completion of the modificaiton.Industry Day
11Can the SPN-43 and WSC-3 upgrades be virtualized?Spec para. 3.1.2.1.6.1, 3.1.2.1.24, 3.1.2.1.26, and 3.1.2.2.5.1,YesIndustry Day
12Can pictures of current fleet equipment be provided?Current fleet equipment is shown in the manuals provided as GFI.Industry Day
13Industry Day
14Industry Day
15Industry Day
16Industry Day
17Industry Day
18Industry Day
19Industry Day
20Industry Day
21Industry Day
22Industry Day
23Post Industry Day