C10 - Redacted Brand Name Justification.pdf

PDF 111 KB Posted

Attached to
Small Business Set-Aside for Technologies for Tomorrow (TFT) Rackmount System Servers Per Attachments
Solicitation number
N61331-26-Q-JK29
Issued by

About this file

This is a Brand Name Justification memorandum issued by the Naval Surface Warfare Center Panama City Division (NSWC-PCD), Code 024, located at 110 Vernon Ave., Panama City, FL 32407. The document justifies a firm fixed price contract award to authorized sellers of Technologies for Tomorrow brand rackmount systems under simplified acquisition procedures.

The Government requires thirteen (13) TFT Compass CSB Xeon 6 3U Rackmount Systems (Part Number TFT3U-1P1S1G0D-10780) configured with Intel Xeon 6745P processors, GigaComputing MS04-CE0 motherboards, 256GB DDR5 RAM, storage adapters, and accessories including PNY Quadro RTX PRO 4000 Blackwell graphics cards. The system specifications include dual 2.5" and quad 2.5" SATA hot-swap enclosures, Broadcom HBA storage adapters, Intel 10-gigabit network interfaces, USB controllers, vibration remediation, testing and configuration services, and a three-year parts/labor depot warranty with advanced parts replacement. The estimated contract value exceeds $25,000.00 and will be synopsized on sam.gov. The justification states that Technologies for Tomorrow is the only brand capable of meeting the Government's performance requirements without risk of mission failure, and no alternative brand selection would produce cost savings sufficient to justify competitive delay. The Contracting Officer determined this procurement represents best value and the lowest overall cost alternative considering price, features, and administrative costs.

View the file

Other files

File Type Posted
C07 - Description and QTY.pdf PDF
C07 - Description and QTY.pdf PDF
C10 - Redacted Brand Name Justification.pdf PDF
C07 - Clauses-Supply.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM

Subj: BRAND NAME JUSTIFICATION TO PROCURE TECHNOLOGIES FOR

TOMORROW RACKMOUNT SYSTEMS

1. Identification of the agency and the contracting activity, and specific identification of the document as a “Brand Name Justification.”

This is a brand name justification. Contracting activity is NSWC-PCD, Code 024, 110 Vernon Ave., Panama City, FL, 32407.

2. Nature and/or description of the action being approved.

This action will award a firm fixed price contract to authorized sellers of the Technologies for Tommorow items listed in Paragraph 3 of this document.

3. A description of the supplies or services required to meet the agency’s needs.

The Contractor shall provide thirteen (13) of the following:

Part Number: TFT3U-1P1S1G0D-10780 Configuration:

TFT Compass CSB Xeon 6 3U Rackmount System - No Media / 6x SATA Bays (10780) Intel Xeon 6745P - 3.1->4.3GHz - 336MB Cache - 32-Core/64-Threads - LGA4710 -

300W

- 2U+ Active Socket 4710 Heatsink/Fan up to 550W

- 2U+ Active Socket 4710 Heatsink/Fan up to 550W 13 CCT 3U Short Depth

Rackmount Chassis - 15.7" Depth - 1x 5.25"/1x 3.5" Bays

- 1200W 2U 80Plus Platinum Non-redundant Power Supply

- PC Speaker for audio alerts/BIOS code beeps

- 2x 80mm High CFM Front Intake Fans

- 2x 60mm High CFM Rear Exhaust Fans

- 2x Front USB 3.0 Ports (Type A)

GigaComputing MS04-CE0 Xeon 6 Motherboard 13 - Single Socket LGA4710

- 8x DDR5-6400 ECC/REG DIMM Slots

- 4x PCIe 5.0 x16; 1x PCIe 5.0 x16 (x8 Lane)

- 2x PCIe 5.0 x2 M.2 2280/22110 Slots

- Intel I210-AT Dual-Port Gigabit LAN

- 6x USB 3.2 Gen1 (4 rear, 2 via header)

- 12x SATA3 (via 3x SlimSAS 4i)

GigaComputing TPM 2.0

32GB DDR5-6400/PC5-51200 - 2Rx4 LP (16Gb) - ECC RDIMM (8 each) - 256GB Total System RAM

IcyDock MB522SP-B - Dual 2.5" SATA Hot Swap Trayless Enclosure IcyDock MB014SP-B R1 - Quad 2.5" SATA Hot Swap Trayless Enclosure Broadcom HBA 9600-24i Tri-Mode Storage Adapter - 12Gb/s SAS/SATA/NVMe - PCI Express 4.0 x8 - 3x SFF-8654 SFF-8654 8i to Dual x4 SFF-8612 OCuLink NVMe/Tri-Mode Cable (2 each) SFF-8654 4i to 4x 7-Pin SATA Cable (2 each) SIIG LB-US0114-S1 - Renesas uPD720201 Chipset - 4-Port USB 3.0 Controller - PCI

Express Startech PEX20000SFPI/Intel 82599 - Dual Port 10G SFP Intel X710-T4L - 4x 10GBase-T Ports - PCI-E 3.0 x8 Customer provided Fan Duct and 40mm Cooling Fan PNY Quadro RTX PRO 4000 Blackwell SFF - 24GB GDDR7 - 4x Mini-DisplayPort

- 70W TDP

Vibration/Shock-Remediation Testing / Configuration / QA 3 Year Parts/3 Year Labor-Depot Warranty + Advanced Parts Replacement

The Government’s minimum needs have been verified by the certifying technical and requirements personnel. This memo does not authorize acquisition for other requirements. This acquisition will be conducted using simplified acquisition procedures

4. Identification of the justification rationale and, if applicable, a demonstration of the proposed contractor’s unique qualifications to provide the required supply or service.

10 U.S.C. 2304(c)(1). Application for brand name description FAR 6.302-1(c).

The Naval Surface Warfare Center Panama City Division (NSWC PCD) currently has a requirement for the item(s) listed in Paragraph 3 of this document. . If another brand were to be selected, the system may not perform as required, resulting in mission failure.

As such, the Government does not expect significant savings through competition and does expect significant and unacceptable delays that will negatively impact this requirement.

Therefore, it is in the Governments’ best interest to acquire the Technologies for Tommorow brand.

5. A determination by the ordering activity contracting officer that the order represents the best value consistent with FAR 13.106-1(b).

The Contracting Officer has determined that the order represents the best value and results in the lowest overall cost alternative (such as considering price, special features, administrative costs) to meet the Government’s needs.

6. A description of the market research conducted among schedule holders and the results or a statement of the reason market research was not conducted.

For the reasons specified in paragraph 4 above, Technologies for Tommorow is the only brand that can meet the Government’s needs. This requirement will be synopsized in the government point of entry sam.gov because it is estimated greater than $25,000.00.

7. Any other facts supporting the justification.

None.

8. A statement of the actions, if any, the agency may take to remove or overcome any barriers that led to the restricted consideration before any subsequent acquisition for the supplies or services is made.

As stated in paragraph 4 above, Technologies for Tommorow is the only brand that can meet this requirement.

File details come from the government source that posted it. Updated .