C27 Questions and Answers N61331-24-T-KS37.pdf
PDF 98 KB Posted
- Solicitation number
- N61331-24-T-KS37
About this file
This document contains Questions and Answers regarding a federal contract opportunity solicitation for the rental of an air conditioning unit. The solicitation, number N61331-24-T-KS37, is a Small Business Set Aside issued by the Department of the Navy Naval Sea Systems Command.
The key details include: the equipment will be placed on the ground and require 68-75 degree Fahrenheit outlet temperature; 100% external air will be utilized; the distance from the equipment to the conditioned air connection is unknown but will require ductwork; the facility has 480V power available in various amp capacities; the contractor will be responsible for delivering and picking up the equipment, but the government will set it up; the area to be cooled is 40 ft long by 15 ft diameter; a 12-ton AC unit will be sufficient without a separate dehumidifier; the contractor must provide a quote by June 12, 2024 at 11am Central Time. Relevant details on power, ductwork, and set-up requirements are also provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C27 Questions and Answers N61331-24-T-KS37.pdf | ||
| A5 Statement of Work.pdf | ||
| C12. Clauses - Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers N61331‐24‐T‐KS37
Question: Will the equipment be on the ground or the roof?
Answer: The equipment will be on the ground.
Question: What outlet temperature do you require inside of the space?
Answer: 68 ‐ 75 deg.
Question: Are we connecting to existing duct or utilizing 100% external air? 100% external
Answer: 100% external
Question: What is the distance from equipment placement to the needed conditioned air connection/opening?
Answer: Hard to say right now, we need to build a platform external to the chamber opening, but it'll be close. The amount of ducting that we rented will be more than sufficient.
Question: What is the layout of the facility? (Tight/Closed In/Open area/Shelves or Racks/Various encolsed offices/etc.?)
Answer: Open highbay with a crane and forklift access.
Question: Do you have 480V power available on site or will you need an Aggreko generator?
Answer:We have 480V power.
Question: If you have 480V power, how many amps of service do you have available?
Answer: We have nearly any 3 phase 480VAC ampacity that may be required. Specifically, 20A, 30A, 40A, 50A, 60A, 70A, 100A, 125A. I have no 80A, or 90A available.
Question: What is the distance from the equipment placement to the breaker available?
Answer: Probably 30 ‐ 50 ft.
Question: Will contractor need to setup and install the equipment?
Answer: The equipment will just need to be delivered and picked up by the contractor and we will set it up.
Question: What is your power source?
Answer: We have nearly any 3 phase 480VAC ampacity that may be required. Specifically, 20A, 30A, 40A, 50A, 60A, 70A, 100A, 125A. We have no 80A, or 90A available.
Question: What size is the area that needs to be cured (Size of vessel or tank)
Answer: 40ft long x 15ft diam
Question: Do you need a 12ton and separate dehumidifier or a 12ton with DX mode?
Answer: No separate dehumidifier required. The chamber is very insulated and a 12 ton unit will suffice for all requirements.
Question: Can you clarify the Duct runs for a 12ton ac unit?
Answer: The amount of ducting in the SOW is what is required due to unknown laydown area construction configurations. The chamber is very insulated and a 12 ton unit will suffice for all requirements.
Question: Can you confirm what you mean by Lead Time under the description part of the solicitation?
Answer: Lead time is the amount of time it will take for an item to be delivered.
Question: The voltage of the AC unit (460v or 208v)?
Answer: 480
Question: What is the size of the vessel that is needed to be cooled? 40 ft x 15 ft diam
Answer: 40 ft x 15 ft diam
Question: Will you be running the power off a generator? If so what size?
Answer: No.
Question: Will 12” ducts work?
Answer: 12” could work
Question: Will we be providing temporary internal ducting?
Answer: We request supply and return ducting to and from the unit.
Question: What is the entry location for ducting? Will it be a door, window or existing ducting?
Answer: We will have to manufacture something here.
Question: What is the distance from unit location to power supply?
Answer: 50 ft.
Question: We need more information on the pin an sleeve connector.
Answer: Unit will be plugging into a Hubbell circuit Lock CAT No HBL460MI7W receptacle