N6133121R0004 Synopsis QA Amendment 3 20210302.pdf

PDF 100 KB Posted

Attached to
SYNOPSIS IDIQ ARCHITECT/ENGINEER (A/E) CONTRACT FOR GENERAL DESIGN SERVICES AT NSWC PCD PANAMA CITY FL
Solicitation number
N6133121R0004
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N61331‐21‐R‐0004 ‐ Synopsis IDIQ A/E Contract for General Design Services at NSWC PCD

Industry Questions and Government Responses

008 Is the completion date in block 24 for design services, without regard to follow on PCAS?

A project will be considered complete based on the project completion date provided in Block 24 of the project description. Sufficient information to determine the date of completion of the project must be included in the project description or the project will not be considered. If more than the maximum number of projects is submitted, the

Government will only evaluate projects up to the maximum number authorized in the order submitted. Projects shall be submitted on the SF330 at Part I, Section F and shall be completed projects. Projects not completed will be excluded from evaluation consideration. For submittal purposes, a task order on an IDIQ contract is considered a project, as is a stand‐alone contract award. Do not submit an IDIQ contract as an example project. Instead, list relevant task orders or stand‐alone contract awards that fit within the definition above. The Government will not evaluate information provided for an IDIQ contract.

Examples of project work submitted that do not conform to this requirement will not be evaluated.

Criteria 1 ‐ Specialized Experience

Amendment 3

File details come from the government source that posted it. Updated .