N61331-19-R-0014-0001.pdf

PDF 388 KB Posted

Attached to
Maritime Buoyant Plates (MBP) Federal contract opportunity
Solicitation number
N61331-19-R-0014
Issued by
Department of the Navy Naval Sea Systems Command

About this file

RFP N61331-19-R-0014 Amendment 0001

View the file

Other files for this federal contract opportunity

Other files attached to Maritime Buoyant Plates (MBP), newest first.
File Type Posted
N61331-19-R-0014-0005.pdf PDF
N61331-19-R-0014-0004.pdf PDF
N61331-19-R-0014-0003.pdf PDF
N61331-19-R-0014-0002.pdf PDF
Exhibit_A.pdf PDF
Attachment_J.5_Standards.pdf PDF
Attachment_J.1_MBP_PD_NQ-PD_16-04.pdf PDF
Attachment_J.3_Past_Performance_Questionnaire.pdf PDF
Attachment_J.2_MBP_QALI.pdf PDF
Attachment_J.6_MAC_Ordering_Procedures.pdf PDF
N61331-19-R-0014.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to answ er questions received. Please see Summary of Changes for the questions and answ ers.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N6133119R0014

X 9B. DATED (SEE ITEM 11)

31-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Jun-2019

CODE

NSWC PANAMA CITY (K. NELSON)

KAYLA.M.NELSON@NAVY.MIL

850-230-7072

110 VERNON AVE.

PANAMA CITY FL 32407-7001

N61331 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N6133119R0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0001

Amendment 0001:

The purpose of this amendment is to answer the following questions:

With regards to solicitation N61331-19-R-0014 Maritime Buoyant Plates, clarification is required on the ballistic resistance data required under sub-factor 2 BALLISTIC PERFORMANCE/MATERIAL DATA. Per Attachment_J.1 – Appendix A MBP Testing Protocol.

1. V50 Ballistic Protocol:

A. There is no clear definition as to how many each XS and/or XL are prescribed. Should we assume it is 3 each XS and 3 each XL?

Answer: See Attachment J-1 (NQ/PD 16-04), Appendix B, Table I-B.

B. The V50 protocol does not differentiate between 1st, 2nd, and 3rd shot V50 values. Reasoning: As a long-standing practice with hard body armor, it is important to differentiate between these shots as a V50 comprised of all 3 shots on one hard body armor insert will skew and provide false results. Also, it is important to note the effects of MIL-STD-662 has on hard body armor as a velocity fluctuation can have both positive and negative impacts on consecutive shots.

Answer: V50 testing will be conducted per MIL-STD-662F.

2. V0 Ballistic Resistance:

A. There is no clear definition as to how many each XS and XL are prescribed?

Answer: See Attachment J-1 (NQ/PD 16-04), Appendix B, Table I-B.

3. Is there a drawing package that is available for the correct insert shape?

Referencing NQ/PD 16-04, Figures A/B and I-A do not match and are commonly referred to as swimmers cut, and SAPI or SPEAR cut respectively.

Answer: Drawings provided as appropriately requested. Figures A, B and I-A in the PD clearly stipulate that they are "not to scale.” They are only intended as references for label/marking placement and shot locations.

(End of Summary of Changes)

File details come from the government source that posted it.