N61331-15-R-0015_Amend_3.doc

DOC document 46 KB Posted

Attached to
Landing Craft Air Cushion (LCAC) Lightweight Armor Panels
Solicitation number
N61331-15-R-0015
Issued by

About this file

Amendment 3 - Clarify mailing address in Section L.

View the file

Other files

File Type Posted
N61331-15-R-0015_Amend_2.docx DOCX document
N61331-15-R-0015_Amend_1.doc DOC document
Attach_1_DD254.pdf PDF
N61331-15-R-0015.doc DOC document
Attach_2_Armor_Specifications.doc DOC document
Exhibit_A_CDRL.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

EVALUATION FACTORS

INSTRUCTION TO OFFEROR

Offeror submission requirements:

In responding to this solicitation, Offeror(s) shall complete and submit the following in hard copy format. The proposal amounts shall be in US currency and all data shall be in English. Proposal data shall be submitted in two (2) hardcopies. (Note – The one original hard copy of page 1, signed by the offeror’s authorized official, and all other required proposal submission data must be received, by the Contract Specialist identified in block 7 of page one, by the time and date reflected in block 9 of page one of the solicitation.)

Offerors shall use the address below for mailing purposes:

Commander

Naval Surface Warfare Center Panama City Division (NSWC PCD)

Attention: Ken Longstreet, Code 023/Tel: 850-636-6012

110 Vernon Avenue

Panama City, FL 32407-7001

RFP N61331-15-R-0015

DO NOT OPEN IN MAIL ROOM

VOLUME I

Legal Offer

The completion and submission to the Government of an offer shall indicate the Offeror’s unconditional agreement to the terms and conditions of the solicitation. The offeror’s proposal shall be structured in the manner listed below and shall include the following:

Cover Letter

The proposal shall include a cover letter that identifies all enclosures being transmitted as part of the proposal. The letter shall reference the solicitation number and acknowledge that it transmits an offer in response to the solicitation. It shall state that proposal validity is valid for 120 days from the date of submission.

Section A

Complete required sections.

Section B

Complete all pricing.

Section K

Complete the required provisions in Section K – Representations, Certifications, and Other Statements of Offerors.

VOLUME II

Technical Proposal

The technical proposal submission shall not contain any reference to price. The technical proposal submission shall be in a Microsoft Word document and shall not exceed 20 pages. Past Performance is limited to ten (10) pages and is excluded from the 20 page count. The contents shall be typed with print in 10 point font within a one inch margin. Volume II shall address the following:

Factor 1 - Technical Capabilities Solicitation Submittal Requirements:

1. The Contractor shall provide proof that they have a quality system that meets the requirements of ISO 9001-2008.

2. The contractor shall provide a detailed description of what types of equipment and methodologies of manufacturing of the panel assemblies that will ensure deliver of the panels within the required 60 days.

3. The Contractor shall provide a detailed description of the process it will use to submit the first article to an independent certified ballistic test facility for ballistic testing in accordance with SOW Paragraph 2.3(b) and the classified Appendix A (provided separately).

Factor 2 - Past Performance

Factor 2 Past Performance Solicitation Submittal Requirements:

1. Offerors shall provide up to three example contracts, where the offeror was the prime contractor, which were completed within the last five years, or are substantially complete, and are most relevant to the solicitation requirements. Describe how this past performance applies to the requirements of this effort.

2. Example contracts may have been performed for Federal, State, and/or local Governments, as well as private industry. Offerors are responsible for providing contract descriptions and applicable experience in sufficient detail to permit evaluation of the example contract’s relevancy. The information shall be provided for each Predecessor Company or key person.

3. Offerors are advised that: (1) Past performance information obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency; (2) the Government reserves the right to use any such information received as part of its evaluation of the offeror’s past performance; (3) the Government reserves the right to directly solicit input on the offeror’s past performance from other sources and the Government may use any other data available to its evaluators, including the personal knowledge of those individuals; and (4) if the offeror omits projects of which the Government evaluation team is aware or becomes aware, customer assessments may be sought from the relevant organization

4. Offerors with no record of relevant past performance or for whom past performance is not available, may submit past performance information on Predecessor Companies and key personnel who have relevant experience (if applicable). Offerors that have no past performance (i.e. new business) must submit a signed and dated certification to that effect. In the event an offeror has no record of relevant past performance, or information on past performance is not available, the offeror will not be evaluated either favorably or unfavorably on past performance. A neutral rating will be assigned to this evaluation factor.

Factor 3 - Price

Pricing information shall be submitted in Section B.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .