USS ASHLAND Itemized Pricing Sheet.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USS ASHLAND (LSD-48) CIS PUMPS AND MOTORS
Solicitation number
N5523624Q0059
Issued by

About this file

This document contains an itemized pricing sheet and related federal contract opportunity solicitation for pump and motor repair services for the USS Ashland. The pricing sheet details line item prices for rigging, transporting, overhauling, testing, painting and additional labor and materials for repair of an NR-2 ASW pump and motor unit. The solicitation seeks fixed-price quotes by February 14, 2024 for the labor, equipment and materials to remove, repair, reinstall and test the pump in accordance with the technical specifications. The Navy is conducting this small business set-aside procurement using FAR Part 13 for an indefinite delivery, indefinite quantity contract for pump and motor contingency services aboard the USS Ashland located in Navy Region Southwest.

View the file

Other files

File Type Posted
N5523624Q0059_RFC.docx DOCX document
RFQ_N5523624Q0059.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Itemized Pricing Sheet
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACTOR:
DELIVERY ORDER:
SHIP:USS ASHLAND (LSD-48)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM01-L0625-52-0-E, MMR # 1, NR2 ASW PUMP1
ITEMIZED PRICING 0001
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (OFFLOAD AND ONLOAD), CRANE SUPPORT AND TRANSPORTATION OF THE NR-2 ASW PUMP AND MOTOR UNIT FROM THE SHIP TO THE SHOP FOR REPAIRS AND TRANSPORT REPAIRED ASW PUMP AND MOTOR UNIT BACK TO THE SHIP FOR RE-INSTALLATION AND OPTEST IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK1$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM01-L0625-52-0-E, MMR # 1, NR2 ASW PUMP1
ITEMIZED PRICING 0002

PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE ASW PUMP IN ACCORDANCE WITH TECH MANUAL S6226-Z2-MMC-010 TO INCLUDE REPLACEMENT OF THE SHAFT SLEEVES, SHAFT KEY, BEARINGS, LUBRICATION FITTINGS, O-RINGS, GASKETS, SLINGERS, MECHANICAL SEAL, CASE AND WEARING RINGS 1 $0.00

JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM01-L0625-52-0-E, MMR # 1, NR2 ASW PUMP1
ITEMIZED PRICING 0003
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP AND SHIPBOARD OPERATIONAL TEST OF THE REPAIRED ASW PUMP IN ACCORDANCE WITH TECH MANUAL S6226-Z2-MMC-0101$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM01-L0625-52-0-E, MMR # 1, NR2 ASW PUMP1
ITEMIZED PRICING 0004
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE ASW PUMP AND MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEMS 009-321$0.00
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM01-L0625-52-0-E, MMR # 1, NR2 ASW PUMP1
ITEMIZED PRICING 0005 PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK. SEE NOTE 2
1$0.00
EDWINJOEY MAGBUTAY, CIS SBS
01 February 2024TOTAL$0.00
OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of a modification to the purchase order.ESTIMATED AMOUNTUNIT OF ISSUEFBLR for ELIN 0010. MATERIAL HANDLING RATE FOR ELIN 0011TOTAL
ELIN 0006ADDITIONAL WORK - LABOR Estimated Straight Time (ST) Man-hours - 100 HRS

ST Fully Burdened Labor Hour Rate $________

NOTE: The offeror’s proposed fully burdened labor rate (FBLR) is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.100HR$0.00
ELIN 0007ADDITIONAL WORK - MATERIALS
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a purchase order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.20,000.00DOLLARS, US0%
MILESTONE EVENTSDATES
1. Purchase Order Start Date20-Feb-24
2. Remove and transport to shop20 - 22 Feb 24
3. Overhaul and Shop Test23 Feb - 19 Mar-24
4. Delivery to Ship, install, align and Shipboard OPTEST20 - 22 Mar-24
5. Purchase Order End Date22-Mar-24
NOTES:
1. Refer to Technical Manual S6226-Z2-MMC-010, 60 HP AC SEAWATER PUMP for detailed procedures on the overhaul of NR-2 ASW Pump to include Shop and Shipboard operational testing.
2. If machining hours are required, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6226-Z2-MMC-010.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .