N5523622R0006PR

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

REF: N5523622R0006 - SUBMARINE REPAIR FOLLOW-ON MAC-IDIQ

SEE CONTINUATION PAGE(S).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jan-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N5523622R0006

X 9B. DATED (SEE ITEM 11)

18-Jan-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jan-2022

CODE

SOUTHWEST REGIONAL MAINTENANCE CENTER

CODE 410B 3755 BRINSER STREET, STE 1

SAN DIEGO CA 92136

N55236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

John V. Rocks, Contracting Officer

(619) 556-6222 john.v.rocks.civ@us.navy.mil

N5523622R0006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been added by full text:

CONTINUATION PAGE(S)

The purpose of this Amendment is as follows:

a. Answer the following offerors’ pre-proposal questions:

b. Incorporate revised attachment S-1 – Past Performance Questionnaire to reflect the below change (see the answer to question 3, below).

QUESTION 1:

The RFP Statement of Work states:

“…all workmanship, material, equipment, and articles used in the performance of work hereunder, shall be in accordance with the applicable rules and requirements of the

American Bureau of Shipping, the United States Coast Guard, the American Boat and

Yacht Council, the Institute of Electrical and Electronic Engineers or other widely accepted technical guidance in effect at the time of the Contractor’s acceptance of the separately placed order.”

The Contractor submitting this question does not believe that “workmanship, material, equipment, and articles used in the performance of work hereunder” on U.S. Navy Submarines are accomplished using the requirements listed. Please advise.

ANSWER 1:

This paragraph has been revised as follows:

Work shall be performed hereunder in accordance with the separately placed delivery order and any drawing or specifications identified. Navy specifications, standards of material and workmanship shall be followed. Unless otherwise specifically provided in the separately placed delivery order, all operational practices of the Contractor and all workmanship, material, equipment, and articles used in the performance of work hereunder, shall be in accordance with the applicable rules and requirements of the American Bureau of Shipping, the United States

Coast Guard, the American Boat and Yacht Council, the Institute of Electrical and Electronic

Engineers or other widely accepted technical guidance in effect at the time of the Contractor’s acceptance of the separately placed order. All material shall be new unless otherwise identified in the delivery order.

QUESTION 2:

The RFP states:

“Proposal Due Date: All copies of proposals must be received by the Government at the address below no later than 18 February 2022 at 02:00 PM (Pacific). Offerors must send in their proposals by mail or delivery in person to the contracting address listed below.”

The Contractor submitting this question asked if proposals may be submitted via email and/or DOD SAFE, due to the continuing pandemic and continuing unreliability of the USPS and other carriers.

ANSWER 2:

No email proposals will be accepted. The Contract Specialist researched whether DOD SAFE could be used for proposals. The DOD SAFE website advises against using it for proposals. It states in relevant part: “Per Office of the Secretary of Defense (OSD) guidance, DoD SAFE should NOT be used for transmission of contract proposals or other contract award documentation” (See https://safe.apps.mil/).

Proposal instructions for delivery by mail or in person to the contracting address contained in the RFP remain unchanged.

QUESTION 3:

The check boxes on page 4 of the PPQ implies that the Contract Office and Program Office are required to collaborate in the response for the specified Contract? Is this correct?

ANSWER 3:

The Government hereby revises Attachment S-1, Past Performance Questionnaire as follows:

Comments from: [ ] Contracting Office or and [ ] Program Office

In other words, the Government is requesting the person filling out the Past Performance Questionnaire comments to check if he/she is from the "Contracting Office" or "Program Office." Please find the revised

Attachment S-1, attached.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

General. The Southwest Regional Maintenance Center, hereafter referred to as “SWRMC,” intends to utilize this contract to order the repair, maintenance, and alteration of U.S. Navy- submarines home ported or visiting San

Diego, CA and to procure long lead time material (LLTM) in support of these activities. The Contractor, under the direction of SWRMC as specified in each individual delivery order issued under this contract, and as an independent Contractor and not as an agent of the Government, shall furnish the material, labor, and facilities

(except those furnished by the Government under express provisions of this contract) necessary for the accomplishment of this work. Inherent in performing this contract, the Contractor shall provide the supervision and management necessary for efficient and effective administration and control of work performed. The Contractor https://safe.apps.mil/ shall ensure adequate resources are dedicated to satisfy the requirements. “Delivery orders,” will be issued under the resultant contract by the Procuring Contracting Officer.

This statement of work (SOW) is intended to outline the general requirements of the contract. Specific details of work items, deliverables, documentation, training, applicable Government/departmental/industry standards, and other requirements will be specified in individual delivery orders.

The primary purpose of this contract is to accomplish Depot-Level-Maintenance and Repair Availabilities (See below) of submarines home ported or visiting San Diego, CA. Work tasked under this contract shall be in the forward compartment forward of frame 50 for 688 CL submarines. For Virginia and Trident class submarines, work tasked under this contract shall be forward of containment areas. In addition, work shall be non-nuclear and non-

SUBSAFE in scope or requirements. All nuclear work shall be accomplished by the Portsmouth Naval

Shipyard (PNS) Detachment San Diego. Nor will this work involve radiological controls or be inside radiological boundaries. No work aft of Frame 50 shall be completed or authorized using this contract.

The types of work/tasking per each delivery order is to include, but are not limited to, the following:

a. Plumbing System Hydro/Cleaning

b. Sheet Metal Services: Lockers, Miscellaneous Equipment Manufacturing, Latches/Drawers/Catches

c. Upholstery Services

d. Locksmith Services

e. Interior Decking Services: PRC, Vinyl Tile, Carpet, Electrical Grade Matting

f. Exterior Non-skid Replacement

g. Staging W/Environmental Wrap

h. DSRV Seating Surface Preserve/Paint

i. Plastisol Services

j. Decorative Wall Coverings

k. Rudder Staging

l. Temp Services; Blowers and Hoses, Dewatering Services

m. Tank Cleaning Services Forward Frame 50

n. Sonar Dome Cleaning/Staging

o. Pier Side Support Services: Diesel Generators, Reefer/Freezer, HPAC/LPAC, Air Dryers

No contracted work requiring a Process Controlled Procedure (PCP) forward of Frame 50 shall be completed using this contract. Contracted pier side support services will be supplied to PNS Det San Diego as NSA/LMA for turnover and hook-up to individual submarines.

a. Maintenance and Repair Availabilities. Continuance Maintenance Availability (CMAV) and Docking

Continuance Maintenance Availability (DCMAV)- are examples of the work intended to be accomplished under this contract Interdeployment upkeep work may be ordered during the performance of this contract.

b. The Government will provide the following facilities (unless otherwise specified in an

Individual delivery order) for the performance of work:

1. Pierside Availabilities (e.g. CMAVs,)-submarines will be berthed at Naval Submarine Base

Point Loma, CA piers.

2. Docking Availabilities (e.g. DCMAVs)-submarines will be dry-docked at Naval Submarine

Base Point Loma, CA piers.

c. The Government will provide crane services to support submarine repairs at Naval

Submarine Base Point Loma. The Contractor shall provide the Public Works Center

(PWC) a twenty-four (24) hour advance notification for crane services.

This contract will be administered with SWRMC as the Procuring Contracting Officer (PCO) and as the

Administrative Contracting Officer (ACO).

The Contractor shall be required to perform in accordance with the standards, guidelines, and procedures as stated in each individual delivery order.

In performing delivery orders, the Contractor must have the industrial capability, the management organizational, and financial capability, and the personnel resources available with the capability and experience to meet the needs of the requirement.

The Contractor shall provide necessary advance procurement of Long Lead Time Material (LLTM), repairs, maintenance, and/or alterations when ordered by written delivery orders issued under the resultant contract by the

PCO. Work performed under this contract will be under the technical cognizance of SWRMC, unless otherwise noted in each delivery order. Each delivery order will specify the details of the work to be accomplished and will be estimated/negotiated separately.

Any successful awardee may be required to work on various projects or sites any time. Each project may require personnel from various labor categories. This could be followed by an inactive period where effort is not required.

The Contractor is responsible for meeting all of the customer’s needs as defined in the delivery orders.

The Contractor may utilize government utilities (i.e., shore power, water, air, and waste disposal services) available at the pier to accomplish the work specified in this contract. It is the Contractor’s responsibility to arrange for, coordinate with, meet the requirements of, and pay Naval Facilities Southwest (NAVFAC-SW) for use of

Government utilities.

The Contractor shall comply with NAVSEA Standard Item 009-32 Change 1 and NAVSEA Standard Item Quality

Management System 009-04, Quality Management System.

Expertise and experience anticipated to be needed for the performance of this contract include but is not limited to

Naval vessels having the following characteristics:

Types of Vessels: SSN, SSBN, and SSGN Class Ships

Structural Material: Steel, Aluminum, Composites, and Wood

Propulsion Method: Nuclear

Design Types: Hull, Mechanical, Electrical and Electronic Design

Alterations may be installed by either activities separate from work ordered under this contract. Alteration

Installation Team (AIT) efforts may require interface or teaming between Contractors. Alterations that may be included in AIT efforts include but are not limited to safety alterations, alterations requiring special skills or tools, alterations best installed by one Contractor to meet schedules, or those alterations that will result in significant savings to the Government if installed via AIT. Coordination of AIT work and work ordered under this contract may be required during certain periods of industrial work. Definitions of alterations and AIT are provided below to ensure all have understanding of other types of industrial work that may be accomplished by other activities.

Per the Fleet Modernization Program Management and Operation Manual, SL720-AA-MAN-010, and for the purposes of this contract, Alterations and Alteration Installation Teams are defined as follows:

Alteration – Any change in the hull, machinery, equipment or fittings that involves a change in

Design, materials, number, location or relationships of an assembly’s component parts whether the

Change is separate from, incidental to, or in conjunction with repairs.

Alteration Installation Team (AIT) – a Navy team (military, civilian Contractor team) under the

Direction of Navy personnel that is trained and equipped to accomplish specific SHIPALTS or

Temporary modifications on specified ships.

Other Government activities such as Ship’s Force, Naval Shipyards, as well as other Government contractors, may perform maintenance repairs or alterations during availability periods for the vessels. The Contractor shall accommodate these activities as required in specific delivery orders.

COORDINATION PROCESS

The Contractor shall assign one lead individual for each delivery order and this individual shall

Coordinate all aspects of the order with the designated Government representative and vice versa. The

Contractor’s designated representative will keep Government representatives apprised of schedule, technical, material and financial issues pertaining to the order.

All communication with other Government organizations, commands, and departments shall be via the SWRMC representative unless otherwise authorized. The Contractor’s employees shall not visit vessels or military activity associated with a delivery order without prior approval from the SWRMC representative. If required, the SWRMC representative shall forward security clearances to military installation for Contractor personnel.

The Contractor shall provide protection during contamination-producing operations and maintain cleanliness in accordance with NAVSEA Standard Item (NSI) 009-02 as per the requirements of CDRL Data Item No. A002.

Remove, manage and properly dispose of all hazardous material, debris, trash and foreign material resulting from cleaning, removal, installation or any other aspect of task performance in accordance with federal, state and local requirements and SWT 948-41-001, Hazardous Waste Produced on Naval Vessels control

TECHNICAL CONFERENCES/REVIEW MEETINGS

Contractor and Government representative shall meet monthly or as required by the Government, for the duration of the contract to review the Contractor’s performance.

Contractor personnel shall be available for informational daily/weekly meetings with technical personnel to discuss the direction, progress, results, and/or issues that occur during the performance of each delivery order placed under this contract.

The Contractor shall provide written reports to the Project Manager (PM) on all work performed, and test documentation of those results. Reports shall be in accordance with CDRL Data Item No. A001.

The Contractor shall submit a written weekly report detailing the daily events and the progress made during the course of each day to the PM and Ship's Authorized Representative (SAR). Time and location for submission of the weekly report shall be agreed upon at the beginning of each Delivery Order and prior to the start of the work. A sample of said report is to be provided to SWRMC prior to the first reporting cycle. Reports shall be in accordance with CDRL Data Item No. A001.

The Contractor shall submit a schedule listing completion date of each paragraph in the Specification Package Work

Item on each Delivery Order and a Test and Inspection Plan (TIP) during the first week of awarded Delivery Order of all required inspections and operational testing required throughout the availability. Reports shall be in accordance with CDRL Data Item No. A003.

The Contractor shall submit schedule and reports in accordance with CDRL Data Item No. A004 for availabilities nine (9) weeks or greater in duration or CDRL Data Item No. A005 for availabilities nine (9) weeks or less in duration.

STANDARDS/SPECIFICATIONS/REFERENCES

Individual delivery orders will reference the specific documents applicable to each delivery order. The types of documents that may be referenced in delivery orders include, but are not limited to, the following:

a. Alteration Record; Liaison Action Record (LAR)

b. NAVSEA Standard Work Items (fiscal year in effect at date of delivery order);

c. Standard Specifications for U.S. Navy Vessels

d. Military Standards

e. Technical manuals

f. OPNAV Instruction

g. Commercial and Industry Standards

h. Government Standards, Technical Drawings and Documentation

i. Applicable Contractor Quality Assurance Plan/Document

j. Current NAVSEA Standard Items

SPECIFICATIONS, AMENDMENTS OR REVISIONS APPLICABLE

1. Whatever specifications, standards, drawings, publications or other documents are cited without issue number, revision, date or amendment number identified, the revision, date or amendment in effect as of the date of the delivery order shall apply. See Section J, Exhibit B, Contract Security Classification Specification.

2. Whatever specific issue number, revision, date or amendment number for specifications, standards, and publications are specified, the issue specified shall apply.

SECURITY REQUIREMENTS

1. The Contractor shall provide clearance information data to SWRMC prior to delivery order start date. Data to include list of all Contractor personnel supporting the installation, social security numbers, addresses, citizenship, and level of clearance. Personnel shall have a minimum of a CONFIDENTIAL Clearance. Only U.S. citizens with a minimum of CONFIDENTIAL Security Clearance, who have received radiological controls indoctrination training within the required 12-month periodicity, will be granted access to the submarine for work under this contract.

Contractor personnel who do not meet the requirements must receive authorization from Commander Submarine

Squadron Eleven.

2. The Contractor’s facility that will support the work described in the Statement of Work shall be cleared at the

SECRET Clearance level. See Section J, Exhibit B: DD Form 254, Contract Security Classification Specification.

PERSONNEL QUALIFICATIONS

1. The Contractor shall be responsible for employing technically qualified personnel to perform the work specified in each delivery order hereunder. The Contractor shall maintain the personnel, organization, and administrative control necessary to ensure that the work delivered meets the contract specification requirements. The work history of each Contractor employee must contain experience directly related to the delivery and function he/she intended to perform under this contract.

2. The Government reserves the right, during the life of this contract, to request work histories to any Contractor employee for purposes of verifying compliance with this requirement. If the Government questions the qualifications or competence of any person performing under the contract, the burden of proof to sustain that the person is qualified as prescribed herein shall be upon the Contractor.

3. Welders shall carry their welding certifications with them at all times.

REQUIRED STANDARDS OF WORKMANSHIP

1. Unless otherwise specifically provided in this contract, the quality of all supplies rendered hereunder shall conform to the highest standards in the relevant profession, trade, or field of endeavor. All supplies shall be rendered by or supervised by individuals fully qualified in the relevant profession, trade or field, and holding all licenses required by law.

2. Work shall be performed hereunder in accordance with the separately placed delivery order and any drawing or specifications identified. Navy specifications, standards of material and workmanship shall be followed. Unless otherwise specifically provided in the separately placed delivery order, all operational practices of the Contractor and all workmanship, material, equipment, and articles used in the performance of work hereunder, shall be in accordance with the applicable rules and requirements of the American Bureau of Shipping, the United States Coast

Guard, the American Boat and Yacht Council, the Institute of Electrical and Electronic Engineers or other widely accepted technical guidance in effect at the time of the Contractor’s acceptance of the separately placed order. All material shall be new unless otherwise identified in the delivery order.

3. The Contractor shall at all times keep the vessel work site free from accumulation of waste material or rubbish resulting from work performed. At the conclusion of each work day, the Contractor shall remove all rubbish from and about the site of the work, and shall leave the work in its immediate vicinity “broom cleaned.” The Government has the option to require a weekly pull back of all temporary support equipment from the vessel being worked and sweep down if in the Government’s point of view, work place cleanliness is not being properly addressed.

WARRANTY PROVISIONS

Contractors shall extend to the Government the full coverage of any standard commercial warranty normally offered in a similar commercial sale, provided that, such warranty is available at no additional cost to the

Government. Contractors shall provide a copy of the standard commercial warranty with the item. The standard commercial warranty period shall begin upon the final acceptance of the applicable material or software. Acceptance of the standard commercial warranty does not waive the Government’s rights under the

“Inspection” clause, nor does it limit the Government’s rights with regard to other terms and conditions of the contract. In the event of a conflict, the terms and conditions of the contract shall take precedence over the standard commercial warranty.

“Acceptance,” as used in this clause, means the act of an authorized representative of the Government by which the

Government assumes for itself, or as an agent of another, ownership of existing and identified supplies, or approves specific services, as partial or complete performance of the contract.

Notwithstanding inspection and acceptance by the Government or any provision concerning the conclusiveness thereof, the Contractor warrants that all services performed under this contract will, at the time of acceptance, be free from defects in workmanship and conform to the requirements of this contract. The Contracting Officer shall give written notice of any defect or nonconformance to the Contractor within 90 days from the acceptance by the

Government. This notice shall state either (1) that the Contractor shall correct or re-perform any defective or nonconforming services, or (2) that the Government does not require correction or re-performance.

If the Contractor is required to correct or re-perform, it shall be at no cost to the Government, and any services corrected or re-performed by the Contractor shall be subject to this clause to the same extent as work initially performed. The Contractor’s obligation under this requirement to correct or repair such deficiency shall extend ninety (90) days from the date of such correction or repair, whichever occurs first. If the Contractor fails or refuses to correct or re-perform, the Contracting Officer may, by contract or otherwise, correct or replace with similar services and charge to the Contractor the cost occasioned to the Government thereby, or make an equitable adjustment in the contract price.

If the Government does not require correction or performance, the Contracting Officer shall make an equitable adjustment in the contract price by issuing a delivery order modification.

ADDITIONAL PROVISION

The Contractor(s) awarded a contract as a result of the solicitation will be required to have in place, no later than the contract award date, a SWRMC approved Quality Management System (QMS) IAW NAVSEA Standard Item 009-

04 and the most current International Organization for Standardization (ISO).

(End of Summary of Changes)

2022-01-28T10:10:56-0800
ROCKS.JOHN.V.1384235626

File details come from the government source that posted it. Updated .