Attach 1 - Itemized Pricing.xlsx

XLSX spreadsheet 17 KB Posted

Attached to
USS MAKIN ISLAND (LHD-8) NR 10 FIRE PUMP & MOTOR UNIT
Solicitation number
N5523622Q0140
Issued by

View the file

Other files

File Type Posted
Amendment 0002 Q0140.pdf PDF
Attach 1 - Itemized Pricing.xlsx XLSX spreadsheet
Attach 1 - Itemized Pricing.xlsx XLSX spreadsheet
Attach 1 - Itemized Pricing.xlsx XLSX spreadsheet
Amendment 0001 Q0140.pdf PDF
Attach 3 - S6225-W6-MMA-010 NAVY STANDARD TITANIUM CENTRIFUGAL PUMP 1000 GPM REV-6.pdf PDF
Attach 1 - Itemized Pricing.xlsx XLSX spreadsheet
RFQ N5523622Q0140.pdf PDF
Attach 2 Request for Specification Clarification (RFC) Form.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITEMIZED PRICING
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACTOR:
SHIP:USS MAKIN ISLAND (LHD-8)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0001
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), TRANSPORTATION OF THE EXISTING NR 10 FIRE PUMP MOTOR FROM SWRMC BUILDING 3418 TO THE SHOP FOR REPAIRS AND DELIVER REPAIRED NR 10 FIRE PUMP MOTOR TO THE SHIP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 1)1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0002

PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR 10 FIRE PUMP MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113, ROTATING ELECTRICAL EQUIPMENT WITH A SEALED INSULATED SYSTEM (SIS), REWIND TO INCLUDE INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS AND FITTINGS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTES 2 AND 3). 1

JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0003

PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR 10 FIRE PUMP UNIT IN ACCORDANCE TECH MANUAL TO INCLUDE THE PROCUREMENT AND INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS AND FITTINGS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK

(SEE NOTES 2 AND 3). 1 $0.00

JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0004
PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4)1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0005 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPERATIONAL TEST AND SHIPBOARD OPERATIONAL TEST OF THE OVERHAULED FIRE PUMP AND MOTOR ASSEMBLY1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0006
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF THE OVERHAUL OF THE NR-3 SEAWATER COOLING PUMP1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0007 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE FIRE PUMP AND MOTOR ASSEMBLY AND NEW AND DISTURBED SURFACES IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-321
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-L1106-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY1
ITEMIZED PRICING 0008 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION1

TOTAL

ITEM NOSUPPLIES/SERVICESHRUNIT PRICEEXT PRICE
OVER AND ABOVE WORK - LABOR
NOTE: The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control.100
ITEMIZED PRICING 0009100$0.00
ITEM NOSUPPLIES/SERVICESLOTUNIT PRICEEXT PRICE
OVER AND ABOVE WORK - MATERIALS

Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.

ITEMIZED PRICING 0010 0 $0.00 $0.00

ITEM NOSUPPLIES/SERVICESEST. QTYUNIT PRICEEXT PRICE
ADDITIONAL WORK - MATERIALS HANDLING FEE
Note: Offeror shall propose a material handling burdened rate: ____% to be applied to ITEMIZED PRICING 0010.15%
ITEMIZED PRICING 001115%
MILESTONE EVENTDATE
1. Delivery Order Start23-Aug-2022
2. Pick up NR-10 FIRE PUMP AND MOTOR UNIT, overhaul/rewind, preserve and shop testing.25 AUG - 23 SEP 2022
3. Deliver and Optest of 6-81-0-E, NR-10 FIRE PUMP AND MOTOR UNIT28-Sep-2022
4. Delivery order end.29-Sep-2022
NOTES:
1. Pick up existing NR-10 FIRE PUMP AND MOTOR ASSEMBLY from SWRMC, BLDG 3418, POC RICHARD GOERISCH (619) 940-3154 to the Shop and deliver overhauled Fire Pump Motor Assembly onboard the USS MAKIN ISLAND located in 6-81-0-E.
2. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation.
3. Refer to Technical Manual S6225-W6-MMA-010 for detailed procedures on the removal, overhaul/repair, installation of the fire pump motor assembly to include shop operational testing.
4. If machining hours is required other than the collector ring or keyway, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6225-W6-MMA-010, NR-10 FIRE PUMP AND MOTOR ASSEMBLY

Sheet2

Sheet3

File details come from the government source that posted it. Updated .