The file's text, extracted by GovTribe without its formatting.
Sheet1
| INDEPENDENT GOVERNMENT ESTIMATE / SCOPE SHEET | |
| CONTRACT: | PUMP AND MOTOR CONTINGENCY |
| CONTRACTOR: | |
| SHIP: | USS MAKIN ISLAND (LHD-8) |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ITEMIZED PRICING 0001 | | | |
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), TRANSPORTATION OF THE EXISTING NR 10 FIRE PUMP MOTOR FROM SWRMC BUILDING 3418 TO THE SHOP FOR REPAIRS AND DELIVER REPAIRED NR 10 FIRE PUMP MOTOR TO THE SHIP IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 1) | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ITEMIZED PRICING 0002 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR 10 FIRE PUMP MOTOR UNIT IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-113, ROTATING ELECTRICAL EQUIPMENT WITH A SEALED INSULATED SYSTEM (SIS), REWIND TO INCLUDE INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS AND FITTINGS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 2 AND 3). 1
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ITEMIZED PRICING 0003 | | | |
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO ACCOMPLISH THE OVERHAUL OF THE NR 10 FIRE PUMP UNIT IN ACCORDANCE TECH MANUAL TO INCLUDE THE PROCUREMENT AND INSTALLATION OF NEW BEARINGS, SEALS, O-RINGS, GASKETS AND FITTINGS IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK
(SEE NOTES 2 AND 3). 1
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| | ITEMIZED PRICING 0004 | | | |
| PROVIDE LABOR (40 HOURS), SERVICES, EQUIPMENT, AND MATERIALS FOR THE MACHINING HOURS (IF REQUIRED) IN ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT AND THE STATEMENT OF WORK (SEE NOTE 4) | 1 | | | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ITEMIZED PRICING 0005 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHOP OPERATIONAL TEST AND SHIPBOARD OPERATIONAL TEST OF THE OVERHAULED FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ITEMIZED PRICING 0006 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF THE FIRE PUMP AND MOTOR ASSEMBLY AND NEW AND DISTURBED SURFACES IN ACCORDANCE WITH NAVSEA STANDARD ITEM 009-32 | 1 | | |
| JSN | LOCATION | LOT | UNIT PRICE | EXT PRICE |
| EM02-L110 | 6-81-0-E, NR-10 FIRE PUMP AND MOTOR ASSEMBLY | 1 | | |
| ITEMIZED PRICING 0007 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION | 1 | | |
TOTAL
| ITEM NO | SUPPLIES/SERVICES | HR | UNIT PRICE | EXT PRICE |
| | OVER AND ABOVE WORK - LABOR | | | |
| NOTE: The offeror’ s proposed fully burdened labor rate is a fixed hourly rate that includes all wages, overhead, all other indirect costs, general and administrative expenses, Facilities Capital Cost of Money (FCCOM), and profit. The fully burdened labor rate represents a blended rate including labor transferred between divisions, subsidiaries, or affiliates of the offeror under a common control. | 100 | | | | |
| | ITEMIZED PRICING 0008 | 100 | | |
| ITEM NO | SUPPLIES/SERVICES | LOT | UNIT PRICE | EXT PRICE |
| OVER AND ABOVE WORK - MATERIALS | | | |
Note: For contract changes involving subcontractors, subcontractor quotes will be treated as Other Direct Costs (ODCs) and will be subject to the contract material burden rate. Subcontractor quotes must be competitively acquired and submitted with the contractor’s Change Order Price Analysis (COPA) in response to a contract and/or Delivery Order modification issued by the Contracting Officer. At no time will the proposed total to be performed by the prime contractor combined with subcontractor quote, material quote, and applicable burdens be allowed to cost more than it would have, had the prime contractor directly provided all material and labor.
ITEMIZED PRICING 0009
| ITEM NO | SUPPLIES/SERVICES | EST. QTY | UNIT PRICE | EXT PRICE |
| | ADDITIONAL WORK - MATERIALS HANDLING FEE | | | |
| Note: Offeror shall propose a material handling burdened rate: ____% to be applied to ITEMIZED PRICING 0009. | 15% | | | | |
| | ITEMIZED PRICING 0010 | 15% | | |
| MILESTONE EVENT | DATE |
| 1. Delivery Order Start | 23-Aug-2022 |
| 2. Pick up NR-10 FIRE PUMP AND MOTOR UNIT, overhaul/rewind, preserve and shop testing. | 25 AUG - 23 SEP 2022 |
| 3. Deliver and Optest of 6-81-0-E, NR-10 FIRE PUMP AND MOTOR UNIT | 28-Sep-2022 |
| 4. Delivery order end. | 29-Sep-2022 |
| NOTES: |
| 1. Pick up existing NR-10 FIRE PUMP AND MOTOR ASSEMBLY from SWRMC, BLDG 3418, POC RICHARD GOERISCH (619) 940-3154 to the Shop and deliver overhauled Fire Pump Motor Assembly onboard the USS MAKIN ISLAND located in 6-81-0-E. |
| 2. In the event the requirements stated in the SOW has changed from NAVSEA Standard Item 009-113 to 009-17 as a result of the disassembly inspection, the Contractor shall submit one legible copy, in hard copy or approved transferrable media, of a CFR listing the recommendations of repair requirements to the SBS. The change in scope will require the Contractor to submit a revised estimated cost towards the performance of the new repair recommendation. |
| 3. Refer to Technical Manual S6225-W6-MMA-010 for detailed procedures on the removal, overhaul/repair, installation of the fire pump motor assembly to include shop operational testing. |
| 4. If machining hours is required other than the collector ring or keyway, submit CFR to the SUPERVISOR with the result of UNSAT measurement not conforming in accordance with the Technical Manual S6225-W6-MMA-010, NR-10 FIRE PUMP AND MOTOR ASSEMBLY |
Sheet2