ELINS_Updated Milestones.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- N5523620Q0140
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N5523620Q01400001 Amendment.pdf | ||
| USS ANCHORAGE 077-001 SWT PACK 2.docx | DOCX document | |
| N5523620Q0140 RFC.docx | DOCX document | |
| ELINS.xlsx | XLSX spreadsheet | |
| N5523620Q0140 SF 18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
ELINS / SCOPE SHEET
| CONTRACT: | TANK AND BILGE CLEANING |
| CONTRACT NO: | |
| CONTRACTOR: | |
| SHIP: | USS ANCHORAGE (LPD-23), PACKAGE 2 |
| LOCATION: | NAVY REGION SOUTHWEST |
| JSN | LOCATION | EA | UNIT PRICE | EXT PRICE | |
| EB14-L003 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK | 1 | BALLAST TANK AND INITIAL GAS FREE CERTIFICATION | ||
| ER04-L039 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID | 1 | |||
| ELIN: 0001 | |||||
| PROVIDE SERVICES AND MATERIAL TO EMPTY, CLEAN AND MAKE GAS FREE FUEL OIL TANK AND VOID, TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK " IN ACCORDANCE WITH THE STATEMENT OF WORK | 2 | $0.00 |
| JSN | LOCATION | GAL | UNIT PRICE | EXT PRICE | |
| EB14-L003 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK | 2,000 | FUEL OIL OVERFLOW STORAGE TANK AND VOID | ||
| ER04-L039 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID | 500 | |||
| ELIN 0002 | |||||
| PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE OFFLOAD, TRANSPORTATION AND DISPOSAL OF SOLIDS WASTE, LIQUID WASTE, HAZARDOUS WASTE, NON-HAZARDOUS WASTE, DUST AND DEBRIS GENERATED IN ACCORDANCE WITH THE STATEMENT OF WORK | 2,500 | $0.00 |
| JSN | LOCATION | DAYS | UNIT PRICE | EXT PRICE | |
| EB14-L003 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK | 6 | FUEL OIL OVERFLOW STORAGE TANK AND VOID | ||
| ER04-L039 | 4-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID | 6 | |||
| ELIN: 0003 | |||||
| PROVIDE SERVICES TO MAINTAIN GAS FREE CERTIFICATION , TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK" IN ACCORDANCE WITH THE STATEMENT OF WORK | 12 | $0.00 |
TOTAL: $0.00
| NEW MILESTONE EVENT | DATE |
| 1. Delivery Start Date | 30-Sep-2020 |
| 2. On-load and assembly of Drain, Maintain, and Disposal equipment | 30-Sep-2020 |
| 2. Maintain Gas Free Certification, to include as "Safe for Workers and Safe for Hot work" Start Date | 1-Oct-2020 |
| 2. Maintain Gas Free Certification, to include as "Safe for Workers and Safe for Hot work" End Date | 10-Oct-2020 |
| 4. Dismantle and offload all drain, maintain, and disposal equipment | 10-Oct-2020 |
| 5. Delivery End Date | 11-Oct-2020 |
| NOTES: |
| 1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the ELINS listed in the scope of work. |
| 2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aj), and the requirements of the ELINS listed in the scope of work. |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .