ELINS.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
USS ANCHORAGE (LPD-23), PACKAGE 2, CIS TANK AND BILGE
Solicitation number
N5523620Q0140
Issued by

View the file

Other files

File Type Posted
ELINS_Updated Milestones.xlsx XLSX spreadsheet
N5523620Q01400001 Amendment.pdf PDF
USS ANCHORAGE 077-001 SWT PACK 2.docx DOCX document
N5523620Q0140 RFC.docx DOCX document
N5523620Q0140 SF 18.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ELINS / SCOPE SHEET

CONTRACT:TANK AND BILGE CLEANING
CONTRACT NO:
CONTRACTOR:
SHIP:USS ANCHORAGE (LPD-23), PACKAGE 2
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONEAUNIT PRICEEXT PRICE
EB14-L0034-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK1BALLAST TANK AND INITIAL GAS FREE CERTIFICATION
ER04-L0394-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID1
ELIN: 0001
PROVIDE SERVICES AND MATERIAL TO EMPTY, CLEAN AND MAKE GAS FREE FUEL OIL TANK AND VOID, TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK " IN ACCORDANCE WITH THE STATEMENT OF WORK2$0.00
JSNLOCATIONGALUNIT PRICEEXT PRICE
EB14-L0034-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK2,000FUEL OIL OVERFLOW STORAGE TANK AND VOID
ER04-L0394-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID500
ELIN 0002
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE OFFLOAD, TRANSPORTATION AND DISPOSAL OF SOLIDS WASTE, LIQUID WASTE, HAZARDOUS WASTE, NON-HAZARDOUS WASTE, DUST AND DEBRIS GENERATED IN ACCORDANCE WITH THE STATEMENT OF WORK2,500$0.00
JSNLOCATIONDAYSUNIT PRICEEXT PRICE
EB14-L0034-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-68-1-F, FUEL OIL OVERFLOW STORAGE TANK6FUEL OIL OVERFLOW STORAGE TANK AND VOID
ER04-L0394-65-1-Q, CLOSED CIRCUIT TELEVISION ROOM, 5-63-1-V, VOID6
ELIN: 0003
PROVIDE SERVICES TO MAINTAIN GAS FREE CERTIFICATION , TO INCLUDE AS "SAFE FOR WORKERS AND SAFE FOR HOT WORK" IN ACCORDANCE WITH THE STATEMENT OF WORK12$0.00

TOTAL: $0.00

NEW MILESTONE EVENTDATE
1. Delivery Start Date24-Sep-2020
2. On-load and assembly of Drain, Maintain, and Disposal equipment24-Sep-2020
2. Maintain Gas Free Certification, to include as "Safe for Workers and Safe for Hot work" Start Date29-Sep-2020
2. Maintain Gas Free Certification, to include as "Safe for Workers and Safe for Hot work" End Date4-Oct-2020
4. Dismantle and offload all drain, maintain, and disposal equipment5-Oct-2020
5. Delivery End Date5-Oct-2020
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the ELINS listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aj), and the requirements of the ELINS listed in the scope of work.

Sheet2

Sheet3

File details come from the government source that posted it. Updated .