Exhbit_A-E.xlsx

XLSX spreadsheet 106 KB Posted

Attached to
Commercial Industrial Services (CIS) Federal contract opportunity
Solicitation number
N5523618R0019
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Exhibit A-E

View the file

Other files for this federal contract opportunity

Other files attached to Commercial Industrial Services (CIS), newest first.
File Type Posted
Amendment_0003.pdf PDF
Amendment_0002_(Signed)_N5523618R0019.pdf PDF
Amendment_1_(Signed).pdf PDF
CDRL_F001.pdf PDF
Attachment_J1_-_Reference_Information_Sheet.docx DOCX document
Attachment_J2_-_Request_for_Specification_Clarification_Form.doc DOC document
CDRL_F005.pdf PDF
CDRL_F007.pdf PDF
CDRL_F002.pdf PDF
CDRL_F003.pdf PDF
CDRL_F004.pdf PDF
CDRL_F006.pdf PDF
N5523618R0019_RFP_(FBO).docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

SECTION B: CLIN 0001
EXHIBIT A (BASE - YEAR ONE)
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND COATING APPLICATION. Provide labor, services, equipment, and materials for the removal of the existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A001AA Existing Ceramic Tiles (Quarry and/or Porcelain) deck covering system 2,000 SF $0.00

A001AB Existing Wear-Resistant Deck Tiles deck covering system 1,000 SF $0.00

A001AC Existing Chemical-Resistant Flooring deck covering system 1,000 SF $0.00

A001AD Existing Electrical Grade Sheeting and Matting deck covering system 3,000 SF $0.00

A001AE Existing Electrical Grade Sheeting and Matting (Loose Lay) deck covering system 1,000 SF $0.00

A001AF Existing Carpeting deck covering system 1,000 SF $0.00

A001AG Existing Solid Vinyl and Vinyl Composition Tile deck covering system 1,000 SF $0.00

A001AH Existing Cosmetic Polymeric (PRC) deck covering system 6,000 SF $0.00

A001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A002CERAMIC TILES (QUARRY AND/OR PORCELAIN). Provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work.

Note: ELIN A001AA shall provide labor, services, equipment, and materials for the the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A002AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 2,000 SF $0.00

A002AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 2 inch X 2 inch "Offeror shall list $1.00 for the unit price to equal the ELIN amount of $15,000" 2,000 SF $0.00

A002AC Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 3 inch X 3 inch 2,000 SF $0.00

A002AD Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 4 inch X 4 inch 500 SF $0.00

A002AE Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 2,000 SF $0.00

A002AF Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 8 inch X 8 inch 2,000 SF $0.00

A002AG Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 1,000 LF $0.00

A002AH Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 1,000 LF $0.00

A002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A003REPAIR ONLY - CERAMIC TILES (QUARRY AND/OR PORCELAIN). Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work.

A003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 100 SF $0.00

A003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 2 inch X 2 inch 100 SF $0.00

A003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 3 inch X 3 inch 100 SF $0.00

A003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 4 inch X 4 inch 100 SF $0.00

A003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 100 SF $0.00

A003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 8 inch X 8 inch 100 SF $0.00

A003AB Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 100 LF $0.00

A003AB Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 100 LF $0.00

A002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A004WEAR-RESISTANT DECK TILES. Provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work.

Note: ELIN A001AB shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A004AA Wear-Resistant Deck Tiles 200 SF $0.00

A004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A005REPAIR ONLY - WEAR-RESISTANT DECK TILES. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of the new Wear-Resistant Deck Tiles deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work.

A005AA Wear-Resistant Deck Tiles 200 SF $0.00

A005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A006CHEMICAL-RESISTANT FLOORING. Provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical-Resistant Flooring deck covering system, to include new underlayment material, new waterproof membrane, new color coat, and new seal coat with aggregate, in accordance with the requirements of the statement of work.

Note: ELIN A001AC shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A006AA Chemical-Resistant Flooring - Type I Class 1 1,000 SF $0.00

A006AB Chemical-Resistant Flooring - Type I Class 2 100 SF $0.00

A006AC Chemical-Resistant Flooring - Type IV Class 1 1,000 SF $0.00

A006AD Chemical-Resistant Flooring - Type IV Class 2 100 SF $0.00

A006AE Chemical-Resistant Flooring - Type V Class 1 1,000 SF $0.00

A006AF Chemical-Resistant Flooring - Type V Class 2 100 SF $0.00

A006AG LPD CLASS ONLY: Chemical-Resistant Flooring - Type IV Class 1 and Type V installed with 100 % colored flakes. 500 SF $0.00

A006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A007REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. Provide labor, services, equipment and materials for the removal to substrate of only the damaged Chemical-Resistant Flooring deck covering, damaged underlayment material (not to exceed 35% of the entire deck), and damged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane and new Chemical-Resistant Flooring on removed areas only. Recoat or recolor and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work.

A007AA Chemical-Resistant Flooring - Type I Class 1 1,000 SF $0.00

A007AB Chemical-Resistant Flooring - Type I Class 2 100 SF $0.00

A007AC Chemical-Resistant Flooring - Type IV Class 1 1,000 SF $0.00

A007AD Chemical-Resistant Flooring - Type IV Class 2 100 SF $0.00

A007AE Chemical-Resistant Flooring - Type V Class 1 1,000 SF $0.00

A007AF Chemical-Resistant Flooring - Type V Class 2 100 SF $0.00

A007AG LPD CLASS SHIPS ONLY: Chemical-Resistant Flooring Type IV Class 1 and Type V installed with 100 % colored flakes. 500 SF $0.00

A007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A008ELECTRICAL GRADE SHEETING AND MATTING. Provide labor, services, equipment and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system, to include new underlayment, in accordance with the requirements of the statement of work.

Note: ELIN A00AE AND A001AF shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A008AA Electrical Grade Sheeting and Matting - NAVSEA SI 009-26 including Attachment D Paragraph 1. ELIN A001AD 1,500 SF $0.00

A008AB Electrical Grade Sheeting and Matting (Loose Lay) - NAVSEA SI 009-26 including Attachment D Paragraph 2. ELIN A001AE 500 SF $0.00

A008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A009REPAIR ONLY: ELECTRICAL GRADE SHEETING AND MATTING. Provide labor, services, equipment and materials for the removal of the entire existing Electrical Grade Sheeting and Matting and removal to substrate of only the damaged underlayment material (not to exceed 35% of the entire deck), and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Electrical Grade Sheeting and Matting deck covering system on the entire deck, in accordance with the requirements of the statement of work.

A009AA Electrical Grade Sheeting and Matting - NAVSEA SI 009-26 including Attachment D Paragraph 1. 1,500 SF $0.00

A009AB Electrical Grade Sheeting and Matting (loose Lay) - NAVSEA SI 009-26 including Attachment D Paragraph 2. 500 SF $0.00

A009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A010CARPETING. Provide labor, services, equipment and materials for the installation of the new Carpeting deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work.

Note: ELIN A001AF shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A010AA Carpeting 300 SY $0.00

A010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A011REPAIR ONLY - CARPETING. Provide labor, services, equipment and materials for the removal of the entire existing Carpeting and removal to substrate of only the damaged underlayment (not to exceed 35% of the entire deck) and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Carpeting deck covering system on the entire deck, in accordance with the requirements of the statement of work.

A011AA Carpeting 300 SY $0.00

A011 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A012SOLID VINYL AND VINYL COMPOSITION TILE. Provide labor, services, equipment and materials for the installation of the new Solid Vinyl and Vinyl Composition Tile deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work.

Note: ELIN A001AG shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A012AA Solid Vinyl Tile 400 SF $0.00

A012AB Vinyl Composition Tile 400 SF $0.00

A012 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A013REPAIR ONLY: SOLID VINYL AND VINYL COMPOSITION TILE. Provide labor, services, equipment and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of the new underlayment material and new Solid Vinyl and Vinyl Composition Tile deck covering system on removed areas only, in accordance with the requirements of the statement of work.

A013AA Solid Vinyl Tile 200 SF $0.00

A013AA Vinyl Composition Tile 200 SF $0.00

A013 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A014COSMETIC POLYMERIC (PRC) . Provide labor, services, equipment, and materials for the installation on the entire deck of the new Cosmetic Polymeric (PRC) deck covering system, to include new underlayment material, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, in accordance with the requirements of the statement of work.

Note: ELIN A001AH shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

A014AA COSMETIC POLYMERIC (PRC) - Type I Class 1 200 SF $0.00

A014AB COSMETIC POLYMERIC (PRC) - Type I Class 2 400 SF $0.00

A014AC COSMETIC POLYMERIC (PRC) - Type II Class 1 500 SF $0.00

A014AD COSMETIC POLYMERIC (PRC) - Type II Class 2 5,000 SF $0.00

A014AE COSMETIC POLYMERIC (PRC) - Type III Class 1 200 SF $0.00

A014AF COSMETIC POLYMERIC (PRC) - Type III Class 2 200 SF $0.00

A014AG LPD CLASS ONLY: COSMETIC POLYMERIC (PRC) - Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, and Type III Class 2, installed with 100 % colored flakes. 1,000 SF $0.00

A014 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A015REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC). Provide labor, services, equipment and materials for the removal to substrate of damaged PRC deck covering, damaged underlayment material (not to exceed 35% of the entire deck), and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane, and new Cosmetic Polymeric (PRC) on removed areas only. Recoat or recolor and reseal (with new colored flakes and new aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work.

A015AA COSMETIC POLYMERIC (PRC) - Type I Class 1 200 SF $0.00

A015AB COSMETIC POLYMERIC (PRC) - Type I Class 2 400 SF $0.00

A015AC COSMETIC POLYMERIC (PRC) - Type II Class 1 200 SF $0.00

A015AD COSMETIC POLYMERIC (PRC) - Type II Class 2 5,000 SF $0.00

A015AE COSMETIC POLYMERIC (PRC) - Type III Class 1 200 SF $0.00

A015AF COSMETIC POLYMERIC (PRC) - Type III Class 2 200 SF $0.00

A015AG LPD CLASS SHIPS ONLY: COSMETIC POLYMERIC (PRC) - Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, and Type III Class 2, installed with 100 % colored flakes. 1,000 SF $0.00

A015 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A016LOGOS AND/OR DECALS . Provide labor, services, equipment and materials for the installation of Logos and/or decals in accordance with the requirements of the statement of work.

A016AA Logos and/or Decals - Size 1 - 2 SF 4 EA $0.00

A016AB Logos and/or Decals - Size 2 - 4 SF 4 EA $0.00

A016AC Logos and/or Decals - Size 4 - 6 SF 5 EA $0.00

A016AD Logos and/or Decals - Size 6 - 8 SF 5 EA $0.00

A016AE Logos and/or Decals - Size 8 - 10 SF 5 EA $0.00

A016AF Logos and/or Decals - Size 10 - 12 SF 5 SF $0.00

A016 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
REMOVAL OF EXISTING DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.

A017AA Removal of existing Chemical-Resistant Flooring, MIL-PRF-32584, deck covering with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

A017AB Removal of existing Cosmetic Polymeric (PRC), MIL-PRF-24613, deck covering with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

A017AC Removal of existing Electrical Grade Sheeting and Matting, MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

A017AD Removal of existing Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

A017 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the installation of new deck covering system, to include new insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, and new waterproof membrane, in accordance with the requirements of the statement of work.
A018AAInstallation of new Chemical-Resistant Flooring, MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AA shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.100SF$0.00
A018ABInstallation of new Cosmetic Polymeric (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AB shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.100SF$0.00
A018ACLPD CLASS SHIPS ONLY: Instalation of new Chemical-Resistant Flooring, MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AA shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
A018ADLPD CLASS SHIPS ONLY: Installation of new Cosmetic Polymeric (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). , including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AB shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
A018AEInstallation of new Electrical Grade Sheeting and Matting, MIL-DTL-15562
NOTE: ELIN A017AC shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
A018AFInstallation of new Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-15562
NOTE: ELIN A017AD shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00

A018 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A019REPAIR ONLY - DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the repair of the deck covering system over insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, in accordance with the requirements of the statement of work.

A019AA REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2). 100 SF $0.00

A019AB REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). 100 SF $0.00

A019AC LPD CLASS SHIPS ONLY: REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2). 200 SF $0.00

A019AD LPD CLASS SHIPS ONLY: REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). 200 SF $0.00

A019AE REPAIR ELECTRICAL GRADE SHEETING AND MATTING, MIL-DTL-15562: 200 SF $0.00

A019AF REPAIR ELECTRICAL GRADE SHEETING AND MATTING, MIL-DTL-15562 (Loose Lay): 200 SF $0.00

A019 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
A020OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the modification(s) to an awarded Delivery Order.

A020AA Additional work -Labor. 100 HRS $0.00

A020AB Additional work - Material. “Offeror shall list $1.00 for the unit price to equal the ELIN amount of $15,000.” 15,000 LOT $0.00

A020 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
A021ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items A001 through A020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A020 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN A020).

A001 - A020 ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION $0.00

ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): $0.00

ADDITIONAL PERCENT FEE PROPOSED: Lot $0.00

A021 ITEM NUMBER TOTAL 1 Lot $0.00

ELIN SUMMARY

A001 TOTAL$0.00
A002 TOTAL$0.00FINAL TOTAL$0.00
A003 TOTAL$0.00
A004 TOTAL$0.00
A005 TOTAL$0.00
A006 TOTAL$0.00
A007 TOTAL$0.00
A008 TOTAL$0.00
A009 TOTAL$0.00
A010 TOTAL$0.00
A011 TOTAL$0.00
A012 TOTAL$0.00
A013 TOTAL$0.00
A014 TOTAL$0.00
A015 TOTAL$0.00
A016 TOTAL$0.00
A017 TOTAL$0.00
A018 TOTAL$0.00
A019 TOTAL$0.00
A020 TOTAL$0.00
A021 TOTAL$0.00

EXHIBIT "A"

BASE YEAR

&P of &N

Exhibit B

SECTION B: CLIN 0001
EXHIBIT B (BASE - YEAR TWO)
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B001REMOVE EXISTING DECK COVERING TO SUBSTRATE, SURFACE PREPARATION, AND COATING APPLICATION. Provide labor, services, equipment, and materials for the removal of the existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B001AA Existing Ceramic Tiles (Quarry and/or Porcelain) deck covering system 2,000 SF $0.00

B001AB Existing Wear-Resistant Deck Tiles deck covering system 1,000 SF $0.00

B001AC Existing Chemical-Resistant Flooring deck covering system 1,000 SF $0.00

B001AD Existing Electrical Grade Sheeting and Matting deck covering system 3,000 SF $0.00

B001AE Existing Electrical Grade Sheeting and Matting (Loose Lay) deck covering system 1,000 SF $0.00

B001AF Existing Carpeting deck covering system 1,000 SF $0.00

B001AG Existing Solid Vinyl and Vinyl Composition Tile deck covering system 1,000 SF $0.00

B001AH Existing Cosmetic Polymeric (PRC) deck covering system 6,000 SF $0.00

B001 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B002CERAMIC TILES (QUARRY AND/OR PORCELAIN). Provide labor, services, equipment, and materials for the installation on the entire deck of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work.

Note: ELIN A001AA shall provide labor, services, equipment, and materials for the the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B002AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 2,000 SF $0.00

B002AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 2 inch X 2 inch 2,000 SF $0.00

B002AC Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 3 inch X 3 inch 2,000 SF $0.00

B002AD Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 4 inch X 4 inch 500 SF $0.00

B002AE Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 2,000 SF $0.00

B002AF Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 8 inch X 8 inch 2,000 SF $0.00

B002AG Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 1,000 LF $0.00

B002AH Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 1,000 LF $0.00

B002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B003REPAIR ONLY - CERAMIC TILES (QUARRY AND/OR PORCELAIN). Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new Ceramic Tiles (Quarry and/or Porcelain) deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work.

B003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 100 SF $0.00

B003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 2 inch X 2 inch 100 SF $0.00

B003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 3 inch X 3 inch 100 SF $0.00

B003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 4 inch X 4 inch 100 SF $0.00

B003AB Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 6 inch X 6 inch 100 SF $0.00

B003AA Ceramic Tiles (Quarry and/or Porcelain) - Tiles Size: 8 inch X 8 inch 100 SF $0.00

B003AB Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 100 LF $0.00

B003AB Ceramic Tiles (Quarry and/or Porcelain) - Cove Base (Bull Nose) 100 LF $0.00

B002 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B004WEAR-RESISTANT DECK TILES. Provide labor, services, equipment, and materials for the installation on the entire deck of new Wear-Resistant Deck Tiles deck covering system, to include new underlayment material and new waterproof membrane, in accordance with the requirements of the statement of work.

Note: ELIN A001AB shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B004AA Wear-Resistant Deck Tiles 200 SF $0.00

B004 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B005REPAIR ONLY - WEAR-RESISTANT DECK TILES. Provide labor, services, equipment, and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of the new Wear-Resistant Deck Tiles deck covering system, new underlayment material, and new waterproof membrane on removed areas only, in accordance with the requirements of the statement of work.

B005AA Wear-Resistant Deck Tiles 200 SF $0.00

B005 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B006CHEMICAL-RESISTANT FLOORING. Provide labor, services, equipment, and materials for the installation on the entire deck of new Chemical-Resistant Flooring deck covering system, to include new underlayment material, new waterproof membrane, new color coat, and new seal coat with aggregate, in accordance with the requirements of the statement of work.

Note: ELIN A001AC shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B006AA Chemical-Resistant Flooring - Type I Class 1 1,000 SF $0.00

B006AB Chemical-Resistant Flooring - Type I Class 2 100 SF $0.00

B006AC Chemical-Resistant Flooring - Type IV Class 1 1,000 SF $0.00

B006AD Chemical-Resistant Flooring - Type IV Class 2 100 SF $0.00

B006AE Chemical-Resistant Flooring - Type V Class 1 1,000 SF $0.00

B006AF Chemical-Resistant Flooring - Type V Class 2 100 SF $0.00

B006AG LPD CLASS ONLY: Chemical-Resistant Flooring - Type IV Class 1 and Type V installed with 100 % colored flakes. 500 SF $0.00

B006 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B007REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. Provide labor, services, equipment and materials for the removal to substrate of only the damaged Chemical-Resistant Flooring deck covering, damaged underlayment material (not to exceed 35% of the entire deck), and damged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane and new Chemical-Resistant Flooring on removed areas only. Recoat or recolor and reseal (with aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work.

B007AA Chemical-Resistant Flooring - Type I Class 1 1,000 SF $0.00

B007AB Chemical-Resistant Flooring - Type I Class 2 100 SF $0.00

B007AC Chemical-Resistant Flooring - Type IV Class 1 1,000 SF $0.00

B007AD Chemical-Resistant Flooring - Type IV Class 2 100 SF $0.00

B007AE Chemical-Resistant Flooring - Type V Class 1 1,000 SF $0.00

B007AF Chemical-Resistant Flooring - Type V Class 2 100 SF $0.00

B007AG LPD CLASS SHIPS ONLY: Chemical-Resistant Flooring Type IV Class 1 and Type V installed with 100 % colored flakes. 500 SF $0.00

B007 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B008ELECTRICAL GRADE SHEETING AND MATTING. Provide labor, services, equipment and materials for the installation on the entire deck of new Electrical Grade Sheeting and Matting deck covering system, to include new underlayment, in accordance with the requirements of the statement of work.

Note: ELIN A00AE AND A001AF shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B008AA Electrical Grade Sheeting and Matting - NAVSEA SI 009-26 including Attachment D Paragraph 1. ELIN A001AD 1,500 SF $0.00

B008AB Electrical Grade Sheeting and Matting (Loose Lay) - NAVSEA SI 009-26 including Attachment D Paragraph 2. ELIN A001AE 500 SF $0.00

B008 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B009REPAIR ONLY: ELECTRICAL GRADE SHEETING AND MATTING. Provide labor, services, equipment and materials for the removal of the entire existing Electrical Grade Sheeting and Matting and removal to substrate of only the damaged underlayment material (not to exceed 35% of the entire deck), and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Electrical Grade Sheeting and Matting deck covering system on the entire deck, in accordance with the requirements of the statement of work.

B009AA Electrical Grade Sheeting and Matting - NAVSEA SI 009-26 including Attachment D Paragraph 1. 1,500 SF $0.00

B009AB Electrical Grade Sheeting and Matting (loose Lay) - NAVSEA SI 009-26 including Attachment D Paragraph 2. 500 SF $0.00

B009 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B010CARPETING. Provide labor, services, equipment and materials for the installation of the new Carpeting deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work.

Note: ELIN A001AF shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B010AA Carpeting 300 SY $0.00

B010 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B011REPAIR ONLY - CARPETING. Provide labor, services, equipment and materials for the removal of the entire existing Carpeting and removal to substrate of only the damaged underlayment (not to exceed 35% of the entire deck) and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material on removed areas only and installation of new Carpeting deck covering system on the entire deck, in accordance with the requirements of the statement of work.

B011AA Carpeting 300 SY $0.00

B011 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B012SOLID VINYL AND VINYL COMPOSITION TILE. Provide labor, services, equipment and materials for the installation of the new Solid Vinyl and Vinyl Composition Tile deck covering system, to include new underlayment material, in accordance with the requirements of the statement of work.

Note: ELIN A001AG shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B012AA Solid Vinyl Tile 400 SF $0.00

B012AB Vinyl Composition Tile 400 SF $0.00

B012 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B013REPAIR ONLY: SOLID VINYL AND VINYL COMPOSITION TILE. Provide labor, services, equipment and materials for the removal to substrate of only the damaged tiles, damaged underlayment material, and the subsequent surface preparation, cleaning, and coating application. Installation of the new underlayment material and new Solid Vinyl and Vinyl Composition Tile deck covering system on removed areas only, in accordance with the requirements of the statement of work.

B013AA Solid Vinyl Tile 200 SF $0.00

B013AA Vinyl Composition Tile 200 SF $0.00

B013 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B014COSMETIC POLYMERIC (PRC) . Provide labor, services, equipment, and materials for the installation on the entire deck of the new Cosmetic Polymeric (PRC) deck covering system, to include new underlayment material, new waterproof membrane, new color coat, new colored flakes, and new seal coat with aggregate, in accordance with the requirements of the statement of work.

Note: ELIN A001AH shall provide labor, services, equipment, and materials for the removal of existing deck covering system to substrate and the subsequent surface preparation, cleaning, and coating application in accordance with the requirements of the statement of work.

B014AA COSMETIC POLYMERIC (PRC) - Type I Class 1 200 SF $0.00

B014AB COSMETIC POLYMERIC (PRC) - Type I Class 2 400 SF $0.00

B014AC COSMETIC POLYMERIC (PRC) - Type II Class 1 500 SF $0.00

B014AD COSMETIC POLYMERIC (PRC) - Type II Class 2 5,000 SF $0.00

B014AE COSMETIC POLYMERIC (PRC) - Type III Class 1 200 SF $0.00

B014AF COSMETIC POLYMERIC (PRC) - Type III Class 2 200 SF $0.00

B014AG LPD CLASS ONLY: COSMETIC POLYMERIC (PRC) - Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, and Type III Class 2, installed with 100 % colored flakes. 1,000 SF $0.00

B014 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B015REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC). Provide labor, services, equipment and materials for the removal to substrate of damaged PRC deck covering, damaged underlayment material (not to exceed 35% of the entire deck), and damaged waterproof membrane and the subsequent surface preparation, cleaning, and coating application. Installation of new underlayment material, new waterproof membrane, and new Cosmetic Polymeric (PRC) on removed areas only. Recoat or recolor and reseal (with new colored flakes and new aggregate) the entire deck to provide an even color, appearance, and texture of the entire deck, in accordance with the requirements of the statement of work.

B015AA COSMETIC POLYMERIC (PRC) - Type I Class 1 200 SF $0.00

B015AB COSMETIC POLYMERIC (PRC) - Type I Class 2 400 SF $0.00

B015AC COSMETIC POLYMERIC (PRC) - Type II Class 1 200 SF $0.00

B015AD COSMETIC POLYMERIC (PRC) - Type II Class 2 5,000 SF $0.00

B015AE COSMETIC POLYMERIC (PRC) - Type III Class 1 200 SF $0.00

B015AF COSMETIC POLYMERIC (PRC) - Type III Class 2 200 SF $0.00

B015AG LPD CLASS SHIPS ONLY: COSMETIC POLYMERIC (PRC) - Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, and Type III Class 2, installed with 100 % colored flakes. 1,000 SF $0.00

B015 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B016LOGOS AND/OR DECALS . Provide labor, services, equipment and materials for the installation of Logos and/or decals in accordance with the requirements of the statement of work.

B016AA Logos and/or Decals - Size 1 - 2 SF 4 EA $0.00

B016AB Logos and/or Decals - Size 2 - 4 SF 4 EA $0.00

B016AC Logos and/or Decals - Size 4 - 6 SF 5 EA $0.00

B016AD Logos and/or Decals - Size 6 - 8 SF 5 EA $0.00

B016AE Logos and/or Decals - Size 8 - 10 SF 5 EA $0.00

B016AF Logos and/or Decals - Size 10 - 12 SF 5 SF $0.00

B016 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
REMOVAL OF EXISTING DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.

B017AA Removal of existing Chemical-Resistant Flooring, MIL-PRF-32584, deck covering with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

B017AB Removal of existing Cosmetic Polymeric (PRC), MIL-PRF-24613, deck covering with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

B017AC Removal of existing Electrical Grade Sheeting and Matting, MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

B017AD Removal of existing Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-15562, deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134. 200 SF $0.00

B017 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the installation of new deck covering system, to include new insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, and new waterproof membrane, in accordance with the requirements of the statement of work.
B018AAInstallation of new Chemical-Resistant Flooring, MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AA shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.100SF$0.00
B018ABInstallation of new Cosmetic Polymeric (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AB shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.100SF$0.00
B018ACLPD CLASS SHIPS ONLY: Instalation of new Chemical-Resistant Flooring, MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2), including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AA shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
B018ADLPD CLASS SHIPS ONLY: Installation of new Cosmetic Polymeric (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). , including new color coat, new colored flakes, and new seal coat with aggregate.
NOTE: ELIN A017AB shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
B018AEInstallation of new Electrical Grade Sheeting and Matting, MIL-DTL-15562
NOTE: ELIN A017AC shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00
B018AFInstallation of new Electrical Grade Sheeting and Matting (Loose Lay), MIL-DTL-15562
NOTE: ELIN A017AD shall provide labor, services, equipment and materials for the removal to substrate of the existing deck covering system with insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, subsequent surface preparation, cleaning, and coating application, in accordance with the requirements of the statement of work.200SF$0.00

B018 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B019REPAIR ONLY - DECK COVERING SYSTEMS WITH INSULATING DECK COVERING UNDERLAYMENT MATERIAL CONFORMING TO MIL-D-18873 OR MIL-D-23134. Provide labor, services, equipment and materials for the repair of the deck covering system over insulating underlayment material conforming to MIL-D-18873 or MIL-D-23134, in accordance with the requirements of the statement of work.

B019AA REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2). 100 SF $0.00

B019AB REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). 100 SF $0.00

B019AC LPD CLASS SHIPS ONLY: REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: CHEMICAL-RESISTANT FLOORING. MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type IV Class 1, Type IV Class2, Type V Class 1, Type V Class 2). 200 SF $0.00

B019AD LPD CLASS SHIPS ONLY: REPAIR, RECOAT OR RECOLOR AND RESEAL ONLY: COSMETIC POLYMERIC (PRC) MIL-PRF-32584 (Type I Class 1, Type I Class 2, Type II Class 1, Type II Class2, Type III Class 1, Type III Class 2). 200 SF $0.00

B019AE REPAIR ELECTRICAL GRADE SHEETING AND MATTING, MIL-DTL-15562: 200 SF $0.00

B019AF REPAIR ELECTRICAL GRADE SHEETING AND MATTING, MIL-DTL-15562 (Loose Lay): 200 SF $0.00

B019 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT
B020OVER AND ABOVE - LABOR AND MATERIALS: It is anticipated that additional work may become necessary during the contract performance. The total cost of the over and above materials and labor hours shall be negotiated and authorized by the Contracting Officer prior to the issuance of the modification(s) to an awarded Delivery Order.

B020AA Additional work -Labor. 100 HRS $0.00

B020AB Additional work - Material. "Offeror shall list $1.00 for the unit price to equal the ELIN amount of $15,000" 15,000 LOT $0.00

B020 ITEM NUMBER TOTAL $0.00

ITEM NOSUPPLIES/SERVICES% PROPOSEDUNITESTIMATED PRICE PER UNITAMOUNT
B021ACCELERATED DELIVERY: It is anticipated that 20 percent of the delivery orders will require accelerated delivery. When services are required in less than 4 hours of the receipt of the delivery order whether during or after normal working hours or less than the contract specified time of delivery. Line items B001 through B020AB may require accelerated delivery. Accelerated delivery will only be provided when authorized in advance by the Contracting Officer at a ______% percentage additional fee of the proposed ELIN price. (Zero % will be the additional charge if none is provided by the offeror). *** For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B020 = $_____________ (multiplied by) 20 percent = ____________ (multiplied by percentage proposed for this ELIN) of ________% = ___________ (total amount in the Item Number Total space provided for ELIN B020).

B001 - B020 ELIN TOTAL FOR ACCELERATED DELIVERY CALCULATION $0.00

ANTICIPATED ACCELERATED DELIVERY TOTAL (20%): $0.00

ADDITIONAL PERCENT FEE PROPOSED: Lot $0.00

B021 ITEM NUMBER TOTAL 1 Lot $0.00

ELIN SUMMARY

B001 TOTAL$0.00
B002 TOTAL$0.00FINAL TOTAL$0.00
B003 TOTAL$0.00
B004 TOTAL$0.00
B005 TOTAL$0.00
B006 TOTAL$0.00
B007 TOTAL$0.00
B008 TOTAL$0.00
B009 TOTAL$0.00
B010 TOTAL$0.00
B011 TOTAL$0.00
B012 TOTAL$0.00
B013 TOTAL$0.00
B014 TOTAL$0.00
B015 TOTAL$0.00
B016 TOTAL$0.00
B017 TOTAL$0.00
B018 TOTAL$0.00
B019 TOTAL$0.00
B020 TOTAL$0.00
B021 TOTAL$0.00

Exhibit C

SECTION B: CLIN 0001
EXHIBIT C (BASE - YEAR THREE)
ITEM NOSUPPLIES/SERVICESEST. QTY PER YEARUNITESTIMATED PRICE PER UNITAMOUNT

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.