N55236-17-R-0013-0001.pdf
PDF 46 KB Posted
- Attached to
- ARCO (ARDM-5); Keel and Bilge Block Repairs
- Solicitation number
- N55236-17-R-0013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N55236-17-R-0013_Final.pdf | ||
| Attachment_J-2_-_Request_for_Specification_Clarification_Form.doc | DOC document | |
| Attachment_J-1-_NAVSEA_Specification_Package_Work_Item_600-00-001.doc | DOC document | |
| Attachment_J-3_-_Reference_Information_Sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N5523617R0013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND RESPONSES
1. QUESTION: Is there a walk-thru set up for this project?
RESPONSE: Ship Check can be done at until 4/24/2017. Contact Victor Osti (Code 350 Project Manager) at (629)972-8115 or Mike Stout (Code 350 Shipbuilding Specialist) at (619)726-5753 to arrange time and date.
2. QUESTION: WORK ITEM 600-00-001, para. 2.2. Note 2 on Page 8 of Ref. 2.2 (DWG 4802216 Rev. G) states “Do not install keel or bilge block wedges on keel or bilge blocks.”
A. Are the wedges going to be provided as part of the original blocks when contractor picks them up?
B. If the wedges are not being provided as part of the original blocks, will contractor be required to manufacture new wedges?
RESPONSE: The hard block wedges will be provided with the blocks that require them and shall be repaired/replaced as required by the work item. The soft caps will not be provided and will not be manufactured under this contract.
3. QUESTION: WORK ITEM 600-00-001. Will Contractor be able to utilize the ARCO’s cranes to remove the original blocks from dry dock basin to the pire and to reinstall the new blocks or is Contractor to include cost for crane services?
RESPONSE: Original blocks will already be on the pire; however, in the event any of them are in the basin at the time they are to be worked, ARCO crane will be made available.
4. The Response Date listed on FBO.gov is listed as 17 April 2017 and the Response Date listed on the SF-33 is listed as 24 April 2017, please clarify.
RESPONSE: The date on the SF-33 is correct. The date listed on the FBO.gov website has been updated to reflect 24 April 2017 as well.
(End of Summary of Changes)