Exhibit_A-E_Rev_1.xls
XLS spreadsheet 159 KB Posted
- Solicitation number
- N55236-15-R-0025
About this file
Revised Exhibit A-E
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N55236-16-R-0005-0001.pdf | ||
| N55236-16-R-0005_Final.pdf | ||
| Exhibit_A-E.xls | XLS spreadsheet | |
| EXHIBIT_F_CDRL.pdf | ||
| J-2_-_Request_for_Specification_Clarification_Form.doc | DOC document | |
| J-1_-_Reference_Information_Sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit A
| SECTION B Supplies or Services and Prices | |||||
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0001 | Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein. | ||||
| A0001AA | Centrifugal Blast and power tool. | 1 | SF | $0.00 | |
| A0001AB | Hydro-Blast and power tool. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0002 | Apply Second Coat of Primer in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0003 | High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0004 | Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein. | ||||
| A0004AA | Apply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas). | 1 | SF | $0.00 | |
| 0004AB | Apply Color Topping to deck areas without nonskid (areas already primed). | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0005 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0006 | Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0007 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0008 | Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0009 | Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0010 | Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0011 | Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0012 | Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0013 | Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0014 | Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0015 | Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0016 | Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0017 | Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein. | ||||
| A0017AA | Mil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent. | 1 | SF | $0.00 | |
| A0017AB | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| A0017AC | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0018 | Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident. | ||||
| A0018AA | Ship/Vessel berthed at pier side. | 1 | EA | $0.00 | |
| A0018AB | Ship/Vessel berthed second vessel out from pier. | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0019 | Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control. | ||||
| A0019AA | 100' by up to 100' | 1 | EA | $0.00 | |
| A0019AB | 60' by up to 200' | 1 | EA | $0.00 | |
| A0019AC | 100' by up to 200' | 1 | EA | $0.00 | |
| A0019AD | 100' by up to 300' | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0020 | Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0021 | Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | ||||
| A0021AA | Centrifugal Blast | 1 | SF | $0.00 | |
| A0021AB | Hydro blast | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0022 | Additional Work | ||||
| A0022AA | Additional Work Labor | 1 | HR | $0.00 | |
| A0022AB | Additional Work Material. (NTE $5,000.00) | 1 | Lot | $5,000.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| A0023 | Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ___% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____ | 0% | EA | $0.00 | |
| TOTAL | $5,000.00 |
Exhibit B
| SECTION B Supplies or Services and Prices | |||||
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0001 | Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein. | ||||
| B0001AA | Centrifugal Blast and power tool. | 1 | SF | $0.00 | |
| B0001AB | Hydro-Blast and power tool. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0002 | Apply Second Coat of Primer in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0003 | High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0004 | Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein. | ||||
| B0004AA | Apply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas). | 1 | SF | $0.00 | |
| B0004AB | Apply Color Topping to deck areas without nonskid (areas already primed). | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0005 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0006 | Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0007 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0008 | Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0009 | Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0010 | Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0011 | Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0012 | Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0013 | Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0014 | Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0015 | Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0016 | Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0017 | Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein. | ||||
| B0017AA | Mil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent. | 1 | SF | $0.00 | |
| B0017AB | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| B0017AC | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0018 | Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident. | ||||
| B0018AA | Ship/Vessel berthed at pier side. | 1 | EA | $0.00 | |
| B0018AB | Ship/Vessel berthed second vessel out from pier. | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0019 | Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control. | ||||
| B0019AA | 100' by up to 100' | 1 | EA | $0.00 | |
| B0019AB | 60' by up to 200' | 1 | EA | $0.00 | |
| B0019AC | 100' by up to 200' | 1 | EA | $0.00 | |
| B0019AD | 100' by up to 300' | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0020 | Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0021 | Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | ||||
| B0021AA | Centrifugal Blast | 1 | SF | $0.00 | |
| B0021AB | Hydro blast | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0022 | Additional Work | ||||
| B0022AA | Additional Work Labor | 1 | HR | $0.00 | |
| B0022AB | Additional Work Material. (NTE $5,000.00) | 1 | Lot | $5,000.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| B0023 | Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____ | 0% | EA | $0.00 | |
| TOTAL | $5,000.00 |
Exhibit C
| SECTION B Supplies or Services and Prices | |||||
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0001 | Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein. | ||||
| C0001AA | Centrifugal Blast and power tool. | 1 | SF | $0.00 | |
| C0001AB | Hydro-Blast and power tool. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0002 | Apply Second Coat of Primer in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0003 | High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0004 | Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein. | ||||
| C0004AA | Apply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas). | 1 | SF | $0.00 | |
| C0004AB | Apply Color Topping to deck areas without nonskid (areas already primed). | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0005 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0006 | Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0007 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0008 | Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0009 | Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0010 | Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0011 | Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0012 | Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0013 | Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0014 | Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0015 | Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0016 | Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0017 | Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein. | ||||
| C0017AA | Mil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent. | 1 | SF | $0.00 | |
| C0017AB | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| C0017AC | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0018 | Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident. | ||||
| C0018AA | Ship/Vessel berthed at pier side. | 1 | EA | $0.00 | |
| C0018AB | Ship/Vessel berthed second vessel out from pier. | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0019 | Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control. | ||||
| C0019AA | 100' by up to 100' | 1 | EA | $0.00 | |
| C0019AB | 60' by up to 200' | 1 | EA | $0.00 | |
| C0019AC | 100' by up to 200' | 1 | EA | $0.00 | |
| C0019AD | 100' by up to 300' | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0020 | Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0021 | Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | ||||
| C0021AA | Centrifugal Blast | 1 | SF | $0.00 | |
| C0021AB | Hydro blast | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0022 | Additional Work | ||||
| C0022AA | Additional Work Labor | 1 | HR | $0.00 | |
| C0022AB | Additional Work Material. (NTE $5,000.00) | 1 | Lot | $5,000.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| C0023 | Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS C001 through C022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____ | 0% | EA | $0.00 | |
| TOTAL | $5,000.00 |
Exhibit D
| SECTION B Supplies or Services and Prices | |||||
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0001 | Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein. | ||||
| D0001AA | Centrifugal Blast and power tool. | 1 | SF | $0.00 | |
| D0001AB | Hydro-Blast and power tool. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0002 | Apply Second Coat of Primer in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0003 | High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0004 | Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein. | ||||
| D0004AA | Apply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas). | 1 | SF | $0.00 | |
| D0004AB | Apply Color Topping to deck areas without nonskid (areas already primed). | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0005 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0006 | Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0007 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0008 | Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0009 | Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0010 | Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0011 | Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0012 | Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0013 | Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0014 | Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0015 | Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0016 | Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0017 | Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein. | ||||
| D0017AA | Mil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent. | 1 | SF | $0.00 | |
| D0017AB | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| D0017AC | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0018 | Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident. | ||||
| D0018AA | Ship/Vessel berthed at pier side. | 1 | EA | $0.00 | |
| D0018AB | Ship/Vessel berthed second vessel out from pier. | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0019 | Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control. | ||||
| D0019AA | 100' by up to 100' | 1 | EA | $0.00 | |
| D0019AB | 60' by up to 200' | 1 | EA | $0.00 | |
| D0019AC | 100' by up to 200' | 1 | EA | $0.00 | |
| D0019AD | 100' by up to 300' | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0020 | Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0021 | Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | ||||
| D0021AA | Centrifugal Blast | 1 | SF | $0.00 | |
| D0021AB | Hydro blast | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0022 | Additional Work | ||||
| D0022AA | Additional Work Labor | 1 | HR | $0.00 | |
| D0022AB | Additional Work Material. (NTE $5,000.00) | 1 | Lot | $5,000.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| D0023 | Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS D001 through D022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____ | 0% | EA | $0.00 | |
| TOTAL | $5,000.00 |
Exhibit E
| SECTION B Supplies or Services and Prices | |||||
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0001 | Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein. | ||||
| E0001AA | Centrifugal Blast and power tool. | 1 | SF | $0.00 | |
| E0001AB | Hydro-Blast and power tool. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0002 | Apply Second Coat of Primer in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0003 | High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0004 | Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein. | ||||
| E0004AA | Apply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas). | 1 | SF | $0.00 | |
| E0004AB | Apply Color Topping to deck areas without nonskid (areas already primed). | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0005 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0006 | Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0007 | Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0008 | Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0009 | Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0010 | Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0011 | Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0012 | Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0013 | Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0014 | Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0015 | Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0016 | Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0017 | Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein. | ||||
| E0017AA | Mil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent. | 1 | SF | $0.00 | |
| E0017AB | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| E0017AC | Additional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0018 | Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident. | ||||
| E0018AA | Ship/Vessel berthed at pier side. | 1 | EA | $0.00 | |
| E0018AB | Ship/Vessel berthed second vessel out from pier. | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0019 | Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control. | ||||
| E0019AA | 100' by up to 100' | 1 | EA | $0.00 | |
| E0019AB | 60' by up to 200' | 1 | EA | $0.00 | |
| E0019AC | 100' by up to 200' | 1 | EA | $0.00 | |
| E0019AD | 100' by up to 300' | 1 | EA | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0020 | Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0021 | Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein. | ||||
| E0021AA | Centrifugal Blast | 1 | SF | $0.00 | |
| E0021AB | Hydro blast | 1 | SF | $0.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0022 | Additional Work | ||||
| E0022AA | Additional Work Labor | 1 | HR | $0.00 | |
| E0022AB | Additional Work Material. (NTE $5,000.00) | 1 | Lot | $5,000.00 | |
| ELIN | DESCRIPTION | EST QTY | UNIT | UNIT PRICE | AMOUNT |
| E0023 | Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS D001 through D022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____ | 0% | EA | $0.00 | |
| TOTAL | $5,000.00 |
TOTAL PROPOSED
| Department use only for administrative purposes. (Offerors do not fill in) | |||||
| ITEM NO | SUPPLIES/SERVICES | Qty | Unit | Unit Price | Amount |
| 0001 | BASE YEAR EFFORT | $5,000.00 | |||
| REFERENCE EXHIBIT "A" FOR BASE YEAR EFFORT | |||||
| 1001 | OPTION I - SECOND YEAR EFFORT | $5,000.00 | |||
| REFERENCE EXHIBIT "B" FOR OPTION 1 - SECOND YEAR EFFORT | |||||
| 2001 | OPTION II - THIRD YEAR EFFORT | $5,000.00 | |||
| REFERENCE EXHIBIT "C" FOR OPTION 2 - THIRD YEAR EFFORT | |||||
| 3001 | OPTION III - FOURTH YEAR EFFORT | $5,000.00 | |||
| REFERENCE EXHIBIT "D" FOR OPTION 3 - FOURTH YEAR EFFORT | |||||
| 4001 | OPTION IV - FIFTH YEAR EFFORT | $5,000.00 | |||
| REFERENCE EXHIBIT "E" FOR OPTION 4 - FIFTH YEAR EFFORT | |||||
| TOTAL FOR ALL 5 YEARS EFFORT | $25,000.00 |
File details come from the government source that posted it. Updated .