Commercial Industrial Services-- Non-Skid Deck Covering Removal and Installation
Solicitation number
N55236-15-R-0025
Issued by

About this file

Revised Exhibit A-E

View the file

Other files

File Type Posted
N55236-16-R-0005-0001.pdf PDF
N55236-16-R-0005_Final.pdf PDF
Exhibit_A-E.xls XLS spreadsheet
EXHIBIT_F_CDRL.pdf PDF
J-2_-_Request_for_Specification_Clarification_Form.doc DOC document
J-1_-_Reference_Information_Sheet.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A

SECTION B Supplies or Services and Prices
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0001Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein.
A0001AACentrifugal Blast and power tool.1SF$0.00
A0001ABHydro-Blast and power tool.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0002Apply Second Coat of Primer in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0003High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0004Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein.
A0004AAApply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas).1SF$0.00
0004ABApply Color Topping to deck areas without nonskid (areas already primed).1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0005Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0006Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0007Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0008Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0009Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0010Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0011Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0012Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0013Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0014Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0015Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0016Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0017Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein.
A0017AAMil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent.1SF$0.00
A0017ABAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
A0017ACAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0018Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident.
A0018AAShip/Vessel berthed at pier side.1EA$0.00
A0018ABShip/Vessel berthed second vessel out from pier.1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0019Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control.
A0019AA100' by up to 100'1EA$0.00
A0019AB60' by up to 200'1EA$0.00
A0019AC100' by up to 200'1EA$0.00
A0019AD100' by up to 300'1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0020Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0021Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.
A0021AACentrifugal Blast1SF$0.00
A0021ABHydro blast1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0022Additional Work
A0022AAAdditional Work Labor1HR$0.00
A0022ABAdditional Work Material. (NTE $5,000.00)1Lot$5,000.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
A0023Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ___% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS A001 through A022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____0%EA$0.00
TOTAL$5,000.00

Exhibit B

SECTION B Supplies or Services and Prices
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0001Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein.
B0001AACentrifugal Blast and power tool.1SF$0.00
B0001ABHydro-Blast and power tool.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0002Apply Second Coat of Primer in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0003High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0004Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein.
B0004AAApply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas).1SF$0.00
B0004ABApply Color Topping to deck areas without nonskid (areas already primed).1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0005Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0006Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0007Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0008Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0009Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0010Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0011Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0012Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0013Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0014Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0015Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0016Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0017Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein.
B0017AAMil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent.1SF$0.00
B0017ABAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
B0017ACAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0018Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident.
B0018AAShip/Vessel berthed at pier side.1EA$0.00
B0018ABShip/Vessel berthed second vessel out from pier.1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0019Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control.
B0019AA100' by up to 100'1EA$0.00
B0019AB60' by up to 200'1EA$0.00
B0019AC100' by up to 200'1EA$0.00
B0019AD100' by up to 300'1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0020Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0021Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.
B0021AACentrifugal Blast1SF$0.00
B0021ABHydro blast1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0022Additional Work
B0022AAAdditional Work Labor1HR$0.00
B0022ABAdditional Work Material. (NTE $5,000.00)1Lot$5,000.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
B0023Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS B001 through B022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____0%EA$0.00
TOTAL$5,000.00

Exhibit C

SECTION B Supplies or Services and Prices
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0001Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein.
C0001AACentrifugal Blast and power tool.1SF$0.00
C0001ABHydro-Blast and power tool.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0002Apply Second Coat of Primer in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0003High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0004Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein.
C0004AAApply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas).1SF$0.00
C0004ABApply Color Topping to deck areas without nonskid (areas already primed).1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0005Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0006Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0007Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0008Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0009Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0010Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0011Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0012Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0013Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0014Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0015Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0016Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0017Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein.
C0017AAMil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent.1SF$0.00
C0017ABAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
C0017ACAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0018Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident.
C0018AAShip/Vessel berthed at pier side.1EA$0.00
C0018ABShip/Vessel berthed second vessel out from pier.1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0019Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control.
C0019AA100' by up to 100'1EA$0.00
C0019AB60' by up to 200'1EA$0.00
C0019AC100' by up to 200'1EA$0.00
C0019AD100' by up to 300'1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0020Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0021Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.
C0021AACentrifugal Blast1SF$0.00
C0021ABHydro blast1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0022Additional Work
C0022AAAdditional Work Labor1HR$0.00
C0022ABAdditional Work Material. (NTE $5,000.00)1Lot$5,000.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
C0023Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS C001 through C022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____0%EA$0.00
TOTAL$5,000.00

Exhibit D

SECTION B Supplies or Services and Prices
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0001Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein.
D0001AACentrifugal Blast and power tool.1SF$0.00
D0001ABHydro-Blast and power tool.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0002Apply Second Coat of Primer in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0003High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0004Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein.
D0004AAApply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas).1SF$0.00
D0004ABApply Color Topping to deck areas without nonskid (areas already primed).1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0005Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0006Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0007Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0008Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0009Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0010Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0011Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0012Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0013Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0014Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0015Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0016Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0017Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein.
D0017AAMil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent.1SF$0.00
D0017ABAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
D0017ACAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0018Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident.
D0018AAShip/Vessel berthed at pier side.1EA$0.00
D0018ABShip/Vessel berthed second vessel out from pier.1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0019Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control.
D0019AA100' by up to 100'1EA$0.00
D0019AB60' by up to 200'1EA$0.00
D0019AC100' by up to 200'1EA$0.00
D0019AD100' by up to 300'1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0020Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0021Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.
D0021AACentrifugal Blast1SF$0.00
D0021ABHydro blast1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0022Additional Work
D0022AAAdditional Work Labor1HR$0.00
D0022ABAdditional Work Material. (NTE $5,000.00)1Lot$5,000.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
D0023Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS D001 through D022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____0%EA$0.00
TOTAL$5,000.00

Exhibit E

SECTION B Supplies or Services and Prices
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0001Remove existing deck covering, blast and power tool, prepare the surface and apply one coat of primer in accordance with Section "C" herein.
E0001AACentrifugal Blast and power tool.1SF$0.00
E0001ABHydro-Blast and power tool.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0002Apply Second Coat of Primer in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0003High Pressure Wash / Cleaning (Hydro-Blast) in accordance with Section “C” herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0004Install Mil Spec 24667, Color Topping, compatible to primer type, nonskid and top coat materials, on decks already primed and/or nonskidded in accordance with Section "C" herein.
E0004AAApply Color Topping of Nonskid Areas (this includes painting areas with out nonskid, slick deck areas).1SF$0.00
E0004ABApply Color Topping to deck areas without nonskid (areas already primed).1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0005Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid or equivalent on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0006Install Mil Spec 24667 Type VII, (Extended durability, fast cure), Comp G, non-skid (abrasive) on prepared surfaces, steel or aluminum decks and ramps (other than hangar bays and flight decks) in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0007Install Mil Spec 24667 Type I, Comp G, MS-440G non-skid (abrasive) or equivalent on prepared surfaces on all flight, hangar decks, helo landing, run-out areas and weapons systems blast pads in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0008Install Mil Spec 24667 Type I, Comp L, 400L non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0009Install Min Spec 24667 Type V, Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0010Install Mil Spec 24667 Type V, Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0011Install Mil Spec 24667 Type VI, (Extended durability, fast cure), Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0012Install Min Spec 24667 Type VIII, (Low Temperature) Comp G, non-skid (abrasive) or equivalent on prepared surfaces on all hangar decks, vertical replenishment deck areas, flight decks in accrodance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0013Install Mil Spec 24667 Type VIII, (Low Temperature) Comp L, non-skid (non-abrasive) or equivalent on prepared surfaces, CVN flight decks in the landing areas in accordance with section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0014Install Mil Spec 24667 Type III, Comp G, MS-660G U/V & LSA non-skid or equivalent on prepared surfaces on aluminum decks and ramps, in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0015Install Mil Spec 24667 Type III, Comp G, MS-880G non skid and MS-1600 membrane or equivalent on prepared decks on wooden/fiberglass/steel and aluminum decks in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0016Install Mil Spec 24667 Type XI, Comp PS (Peel and Stick Nonskid Strips), on prepared decks and paint slick deck areas after strips are applied in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0017Additional Material Cost, to apply low Solar absorbing UV resistant nonskid coating or equivalent in accordance with Section “C” herein.
E0017AAMil Spec 24667 Type I, Comp G, MS-400G LSA or equivalent.1SF$0.00
E0017ABAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
E0017ACAdditional material cost to supply Mil Spec 24667 Type I, Comp 400G non-skid coating in lieu of Mil Spec 24667 Type I, Comp 440G non-skid or equivalent.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0018Additional Crane and Rigging Services for off-loading or on-loading equipment and materials when required by unscheduled changes in ship's/vessel's operations (e.g., ship getting underway). The unit of issue "Each" equals one incident.
E0018AAShip/Vessel berthed at pier side.1EA$0.00
E0018ABShip/Vessel berthed second vessel out from pier.1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0019Provide enclosed relocatable structures to control environmental conditions (rain, high or low temperatures, etc). The structures will have ingress / egress routes and include, but not be limited to, lights, dehumidifiers, HVAC Units and other related / necessary equipment to provide climate control.
E0019AA100' by up to 100'1EA$0.00
E0019AB60' by up to 200'1EA$0.00
E0019AC100' by up to 200'1EA$0.00
E0019AD100' by up to 300'1EA$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0020Clean previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0021Blast and prime previously prepared areas which are contaminated through no fault of the contractor in accordance with Section "C" herein.
E0021AACentrifugal Blast1SF$0.00
E0021ABHydro blast1SF$0.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0022Additional Work
E0022AAAdditional Work Labor1HR$0.00
E0022ABAdditional Work Material. (NTE $5,000.00)1Lot$5,000.00
ELINDESCRIPTIONEST QTYUNITUNIT PRICEAMOUNT
E0023Accelerated Delivery. It is anticipated that 10 percent of the delivery orders will require accelerated delivery. Accelerated delivery is defined as work that must commence within four (4) hours after receipt of the delivery order (to include orders received after normal working hours) and/or work with a performance period of 12 calendar days or less (to include weekends and holidays). Contract Line Items 4001 through 4022AB may require accelerated delivery. Accelerated delivery shall only be invoked when authorized in advance by the Ordering Officer at a ____% additional fee of the proposed ELIN price. ***For evaluation purposes, complete the following formula to arrive at a total proposed price for this ELIN: Total amount of ELINS D001 through D022AB = $_____ (multiplied by) 10 percent estimated accelerated delivery = $_____ multiplied by percentage fee proposed for this ELIN of ____% = $_____0%EA$0.00
TOTAL$5,000.00

TOTAL PROPOSED

Department use only for administrative purposes. (Offerors do not fill in)
ITEM NOSUPPLIES/SERVICESQtyUnitUnit PriceAmount
0001BASE YEAR EFFORT$5,000.00
REFERENCE EXHIBIT "A" FOR BASE YEAR EFFORT
1001OPTION I - SECOND YEAR EFFORT$5,000.00
REFERENCE EXHIBIT "B" FOR OPTION 1 - SECOND YEAR EFFORT
2001OPTION II - THIRD YEAR EFFORT$5,000.00
REFERENCE EXHIBIT "C" FOR OPTION 2 - THIRD YEAR EFFORT
3001OPTION III - FOURTH YEAR EFFORT$5,000.00
REFERENCE EXHIBIT "D" FOR OPTION 3 - FOURTH YEAR EFFORT
4001OPTION IV - FIFTH YEAR EFFORT$5,000.00
REFERENCE EXHIBIT "E" FOR OPTION 4 - FIFTH YEAR EFFORT
TOTAL FOR ALL 5 YEARS EFFORT$25,000.00