LCU_1648_COVER_AND_INDEX.pdf

PDF 180 KB Posted

Attached to
Landing Craft Utility (LCU) -1648 Dryberthing Phased Maintenance Availability (DPMA)
Solicitation number
N55236-15-R-0012
Issued by

About this file

LCU 1648 Cover sheet and index

View the file

Other files

File Type Posted
LCU_1648_SPEC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SWRMC (NMD)

ACU ONE (ACU 53257)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSSD-003-15

INCLUDES ALL CHANGES THROUGH 1/7/2015

INDEX

SHIP: ACU ONE (ACU 53257) SSSD-003-15

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 11/07/2013

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/29/2011

009-03 Toxic and Hazardous Substances; control 01/17/2013

009-04 Quality Management System; provide 11/07/2013

009-05 Temporary Accesses; provide 01/17/2013

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

06/10/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 06/10/2014

009-08 Fire Protection at Contractor's Facility; accomplish 06/10/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/29/2011

009-18 Magnetic Material; control 01/17/2013

009-19 Provisioning Technical Documentation (PTD); provide 07/29/2011

009-20 Government Property; control 01/17/2013

009-21 Logistics and Technical Data; provide 07/29/2011

009-23 Interferences; remove and install 01/17/2013

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/17/2013

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

06/10/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for

Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling

Equipment at Naval Facilities; accomplish

07/29/2011

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

11/07/2013

009-61 Shipboard Use of Fluorocarbons; control 01/17/2013

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/29/2011

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 01/17/2013

009-69 Heavy Weather Plan; provide 11/07/2013

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for

Unmanned Vessels; accomplish

06/10/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 01/17/2013

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 11/07/2013

009-74 Occupational, Safety and Health Requirements; accomplish 06/10/2014

ITEM_NO. TITLE DATE

009-77 Cofferdam Requirements; accomplish 01/17/2013

009-79 Government Owned Material (GOM); status reporting 07/29/2011

009-80 Ship's Facilities; provide 07/29/2011

009-81 Compartment Closeout; accomplish 01/17/2013

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-83 Wire Rope Fitting Verification; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 01/17/2013

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H)

Materials; accomplish

08/01/2008

009-87 Chemical Disinfection Procedures; accomplish 01/17/2013

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/29/2011

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

01/17/2013

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/17/2013

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous

Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 01/17/2013

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/30/2010

009-101 Requirements for Mooring, Entry to and Departure from Contractor's Facility;

accomplish

01/17/2013

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/29/2011

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/29/2011

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/29/2011

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/29/2011

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

11/07/2013

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/29/2011

009-117 AEGIS Light Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA);

provide

01/06/2014

009-118 CG Deck Loading; accomplish 01/17/2013

009-120 Fact Finding and Critique of Unplanned Events; manage 01/06/2014

009-121 Ship Assessment/Inspection Requirements; provide 01/06/2014

ITEM NO. TITLE

LCU 1648-Hazardous Waste Produced on Naval Vessels; control077-01-001

LCU 1648 Hull Plating; repair110-11-001

LCU 1648 Hull Zincs; replace (DRYDOCK)110-11-002

LCU 1648-Boat Alt 135LCU/299C; accomplish111-11-001

LCU 1648-Pilot House Repair; accomplish120-11-001

LCU 1648-Voids; preservation121-11-001

LCU 1648 Berthing Spaces; preservation121-11-002

LCU 1648-Fuel Oil Tank; inspect123-11-001

LCU 1648-Potable Water Tank; inspect and preserve123-14-001

LCU 1648 Ballast Tank; repair and preserve123-16-001

LCU 1648-Bumper Socket; repair130-11-001

LCU 1648 Vehicle Lashing Socket; repair130-11-002

LCU 1632-Bumper Socket; repair130-11-004

LCU 1648 Battle/PortLight Window ; repair150-11-001

LCU 1648 Quick Water Tight Door and Frame; replace167-11-001

LCU 1648-Watertight Doors; replace167-11-002

LCU 1648-BOSN Storeroom Ventilation, installation (BOATALT 337A)167-11-003

LCU 1648 Access Hatch and Scuttle; replace167-11-004

LCU-1648- Main Propulsion and Ship Service Diesel Engine; disconnect and reconnect

233-00-001

LCU 1648 Diesel Engine Exhaust System Upgrades; accomplish233-11-001

LCU 1632 Port/ STBD Main Propulsion Diesel Engine; overhaul233-11-002

LCU 1648 Port/ STBD Main Propulsion Diesel Engine; overhaul233-11-003

LCU 1648-Engine Emergency Shutdown Cable Assembly; accomplish233-85-001

LCU 1648 Keel Cooler; refurbish256-00-001

LCU 1648-Jacket Water Piping; repair and test256-11-001

LCU-1648 Ship's Service Generator; repair311-22-001

LCU-1648 Bow Ramp Electrical System; repair320-11-001

LCU 1648 Shore Power System Receptacle Modification, B/A 00281C;

accomplish

320-80-001

LCU 1648-Main Mast, Antenna Mast Cables, Supports and Stuffing

Tubes; replace

321-11-001

LCU 1648 Ventilation System; repair512-80-001

LCU 1648 Vaneaxial Fan; repair513-11-001

LCU 1648-Air Conditioning Plant; replace514-01-001

LCU 1648- Hull Valves; replace521-11-001

LCU 1648-Fire Pump and Motor; repair521-21-001

LCU 1648 BOATALT 308C Magazine Sprinkler Valve; replace522-11-001

LCU 1648 Fuel Oil Reach Rod; replace529-00-001

LCU 1648 Engine Driven Drain Pump Removal; accomplish529-11-001

LCU 1648 Ballast Tank Reach Rods; removal529-11-002

LCU 1648-Water Heater; replace533-11-001

LCU 1648 Reverse Osmosis Desalination System; repair533-11-002

LCU 1648 Halon Pull Cable Assemblies; replace541-11-002

LCU-1648, Low Pressure (LP) Air System Receiver; replace551-11-001

LCU 1648 (BOATALT 335A) Fire Suppression System; install555-16-001

LCU 1648-Hydraulic Starting System Accumulator; repair558-11-001

LCU 1648 Steering Gear Hydraulic Ram Plunger Unit ; repair561-11-001

LCU 1648-Main and Flanking Rudders; repair562-11-001

LCU 1648-Stern Anchor Winch; repair581-11-001

LCU 1648 Kort Nozzle, repair and test583-66-001

LCU 1648 BOATALT No. 135CU/293C (Modify Electro-Hydraulic Engine

Starting System); accomplish

583-80-001

LCU 1648 Stern Gate; repair584-21-001

LCU 1648 Mast Elecro Hydraulic System; repair584-21-003

LCU 1648 Bow Ramp Alignment; inspect and repair (DRYDOCK)584-31-001

LCU 1648- Bow Ramp Chain, Cable and Sheave; repair584-31-003

LCU 1648 Crew's head, shower drains, CHT system; repair593-11-001

LCU 1648 Sewage holding Tank; clean and inspect593-11-002

LCU 1648 Gray Water Piping; replace593-11-003

LCU 1648-Relocation of Gun Mount612-11-001

LCU 1648 Metal Joiner Doors; replace624-11-001

LCU 1648-Bilge; preserve631-11-001

LCU 1648 Steel Craft Preservation; accomplish631-31-001

LCU 1648-Port and Starboard Wing Wall; repair631-31-002

LCU 1648-Cosmetic Polymeric Deck Covering System; install634-11-001

LCU 1648 Damage or Missing Insulation, Bulkhead, Overhead, and

Piping; replace or repair

635-11-001

LCU 1648 Pilothouse Chart Table; replace640-10-001

LCU 1648-Refrigerator / Freezer; replace651-11-001

LCU 1648-Refrigerator / Freezer; replace651-11-002

LCU 1648-Landing Craft Galley Range; replace651-11-003

LCU 1648-Dock Trial and Sea Trial; accomplish982-31-001

LCU 1648-Dryberthing, accomplish997-11-001

File details come from the government source that posted it. Updated .