DEPARTMENT OF THE NAVY
SWRMC (NMD)
ACU ONE (ACU 53257)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: SSSD-003-15
INCLUDES ALL CHANGES THROUGH 1/7/2015
INDEX
SHIP: ACU ONE (ACU 53257) SSSD-003-15
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 11/07/2013
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/29/2011
009-03 Toxic and Hazardous Substances; control 01/17/2013
009-04 Quality Management System; provide 11/07/2013
009-05 Temporary Accesses; provide 01/17/2013
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
06/10/2014
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 06/10/2014
009-08 Fire Protection at Contractor's Facility; accomplish 06/10/2014
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/29/2011
009-18 Magnetic Material; control 01/17/2013
009-19 Provisioning Technical Documentation (PTD); provide 07/29/2011
009-20 Government Property; control 01/17/2013
009-21 Logistics and Technical Data; provide 07/29/2011
009-23 Interferences; remove and install 01/17/2013
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/17/2013
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
06/10/2014
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for
Commercial Equipment/ Component; provide
07/19/2007
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling
Equipment at Naval Facilities; accomplish
07/29/2011
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
11/07/2013
009-61 Shipboard Use of Fluorocarbons; control 01/17/2013
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/29/2011
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 01/17/2013
009-69 Heavy Weather Plan; provide 11/07/2013
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for
Unmanned Vessels; accomplish
06/10/2014
009-72 Physical Security at Private Contractor's Facility; accomplish 01/17/2013
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 11/07/2013
009-74 Occupational, Safety and Health Requirements; accomplish 06/10/2014
ITEM_NO. TITLE DATE
009-77 Cofferdam Requirements; accomplish 01/17/2013
009-79 Government Owned Material (GOM); status reporting 07/29/2011
009-80 Ship's Facilities; provide 07/29/2011
009-81 Compartment Closeout; accomplish 01/17/2013
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
07/29/2011
009-83 Wire Rope Fitting Verification; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 01/17/2013
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H)
Materials; accomplish
08/01/2008
009-87 Chemical Disinfection Procedures; accomplish 01/17/2013
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
07/29/2011
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
07/29/2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
01/17/2013
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/17/2013
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous
Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 01/17/2013
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/30/2010
009-101 Requirements for Mooring, Entry to and Departure from Contractor's Facility;
accomplish
01/17/2013
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/29/2011
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish
07/29/2011
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
07/29/2011
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/29/2011
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
11/07/2013
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/29/2011
009-117 AEGIS Light Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA);
provide
01/06/2014
009-118 CG Deck Loading; accomplish 01/17/2013
009-120 Fact Finding and Critique of Unplanned Events; manage 01/06/2014
009-121 Ship Assessment/Inspection Requirements; provide 01/06/2014
ITEM NO. TITLE
LCU 1648-Hazardous Waste Produced on Naval Vessels; control077-01-001
LCU 1648 Hull Plating; repair110-11-001
LCU 1648 Hull Zincs; replace (DRYDOCK)110-11-002
LCU 1648-Boat Alt 135LCU/299C; accomplish111-11-001
LCU 1648-Pilot House Repair; accomplish120-11-001
LCU 1648-Voids; preservation121-11-001
LCU 1648 Berthing Spaces; preservation121-11-002
LCU 1648-Fuel Oil Tank; inspect123-11-001
LCU 1648-Potable Water Tank; inspect and preserve123-14-001
LCU 1648 Ballast Tank; repair and preserve123-16-001
LCU 1648-Bumper Socket; repair130-11-001
LCU 1648 Vehicle Lashing Socket; repair130-11-002
LCU 1632-Bumper Socket; repair130-11-004
LCU 1648 Battle/PortLight Window ; repair150-11-001
LCU 1648 Quick Water Tight Door and Frame; replace167-11-001
LCU 1648-Watertight Doors; replace167-11-002
LCU 1648-BOSN Storeroom Ventilation, installation (BOATALT 337A)167-11-003
LCU 1648 Access Hatch and Scuttle; replace167-11-004
LCU-1648- Main Propulsion and Ship Service Diesel Engine; disconnect and reconnect
233-00-001
LCU 1648 Diesel Engine Exhaust System Upgrades; accomplish233-11-001
LCU 1632 Port/ STBD Main Propulsion Diesel Engine; overhaul233-11-002
LCU 1648 Port/ STBD Main Propulsion Diesel Engine; overhaul233-11-003
LCU 1648-Engine Emergency Shutdown Cable Assembly; accomplish233-85-001
LCU 1648 Keel Cooler; refurbish256-00-001
LCU 1648-Jacket Water Piping; repair and test256-11-001
LCU-1648 Ship's Service Generator; repair311-22-001
LCU-1648 Bow Ramp Electrical System; repair320-11-001
LCU 1648 Shore Power System Receptacle Modification, B/A 00281C;
accomplish
320-80-001
LCU 1648-Main Mast, Antenna Mast Cables, Supports and Stuffing
Tubes; replace
321-11-001
LCU 1648 Ventilation System; repair512-80-001
LCU 1648 Vaneaxial Fan; repair513-11-001
LCU 1648-Air Conditioning Plant; replace514-01-001
LCU 1648- Hull Valves; replace521-11-001
LCU 1648-Fire Pump and Motor; repair521-21-001
LCU 1648 BOATALT 308C Magazine Sprinkler Valve; replace522-11-001
LCU 1648 Fuel Oil Reach Rod; replace529-00-001
LCU 1648 Engine Driven Drain Pump Removal; accomplish529-11-001
LCU 1648 Ballast Tank Reach Rods; removal529-11-002
LCU 1648-Water Heater; replace533-11-001
LCU 1648 Reverse Osmosis Desalination System; repair533-11-002
LCU 1648 Halon Pull Cable Assemblies; replace541-11-002
LCU-1648, Low Pressure (LP) Air System Receiver; replace551-11-001
LCU 1648 (BOATALT 335A) Fire Suppression System; install555-16-001
LCU 1648-Hydraulic Starting System Accumulator; repair558-11-001
LCU 1648 Steering Gear Hydraulic Ram Plunger Unit ; repair561-11-001
LCU 1648-Main and Flanking Rudders; repair562-11-001
LCU 1648-Stern Anchor Winch; repair581-11-001
LCU 1648 Kort Nozzle, repair and test583-66-001
LCU 1648 BOATALT No. 135CU/293C (Modify Electro-Hydraulic Engine
Starting System); accomplish
583-80-001
LCU 1648 Stern Gate; repair584-21-001
LCU 1648 Mast Elecro Hydraulic System; repair584-21-003
LCU 1648 Bow Ramp Alignment; inspect and repair (DRYDOCK)584-31-001
LCU 1648- Bow Ramp Chain, Cable and Sheave; repair584-31-003
LCU 1648 Crew's head, shower drains, CHT system; repair593-11-001
LCU 1648 Sewage holding Tank; clean and inspect593-11-002
LCU 1648 Gray Water Piping; replace593-11-003
LCU 1648-Relocation of Gun Mount612-11-001
LCU 1648 Metal Joiner Doors; replace624-11-001
LCU 1648-Bilge; preserve631-11-001
LCU 1648 Steel Craft Preservation; accomplish631-31-001
LCU 1648-Port and Starboard Wing Wall; repair631-31-002
LCU 1648-Cosmetic Polymeric Deck Covering System; install634-11-001
LCU 1648 Damage or Missing Insulation, Bulkhead, Overhead, and
Piping; replace or repair
635-11-001
LCU 1648 Pilothouse Chart Table; replace640-10-001
LCU 1648-Refrigerator / Freezer; replace651-11-001
LCU 1648-Refrigerator / Freezer; replace651-11-002
LCU 1648-Landing Craft Galley Range; replace651-11-003
LCU 1648-Dock Trial and Sea Trial; accomplish982-31-001
LCU 1648-Dryberthing, accomplish997-11-001