DEPARTMENT OF THE NAVY
SWRMC (NMD)
ACU ONE (ACU 53257)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: SSSD-506-14
INCLUDES ALL CHANGES THROUGH 10/29/2014
INDEX
SHIP: ACU ONE (ACU 53257) SSSD-506-14
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 11/07/2013
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/29/2011
009-03 Toxic and Hazardous Substances; control 01/17/2013
009-04 Quality Management System; provide 11/07/2013
009-05 Temporary Accesses; provide 01/17/2013
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
06/10/2014
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 06/10/2014
009-08 Fire Protection at Contractor's Facility; accomplish 06/10/2014
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/29/2011
009-18 Magnetic Material; control 01/17/2013
009-19 Provisioning Technical Documentation (PTD); provide 07/29/2011
009-20 Government Property; control 01/17/2013
009-21 Logistics and Technical Data; provide 07/29/2011
009-23 Interferences; remove and install 01/17/2013
009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/17/2013
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
06/10/2014
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for
Commercial Equipment/ Component; provide
07/19/2007
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling
Equipment at Naval Facilities; accomplish
07/29/2011
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
11/07/2013
009-61 Shipboard Use of Fluorocarbons; control 01/17/2013
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/29/2011
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 01/17/2013
009-69 Heavy Weather Plan; provide 11/07/2013
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for
Unmanned Vessels; accomplish
06/10/2014
009-72 Physical Security at Private Contractor's Facility; accomplish 01/17/2013
009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 11/07/2013
009-74 Occupational, Safety and Health Requirements; accomplish 06/10/2014
009-77 Cofferdam Requirements; accomplish 01/17/2013
009-79 Government Owned Material (GOM); status reporting 07/29/2011
009-80 Ship's Facilities; provide 07/29/2011
009-81 Compartment Closeout; accomplish 01/17/2013
009-82 Data Requirements When Installing an Equal Component Vice Specified Component;
provide
07/29/2011
009-83 Wire Rope Fitting Verification; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 01/17/2013
ITEM_NO. TITLE DATE
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H)
Materials; accomplish
08/01/2008
009-87 Chemical Disinfection Procedures; accomplish 01/17/2013
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
07/29/2011
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
07/29/2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
01/17/2013
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/17/2013
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous
Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 01/17/2013
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/30/2010
009-101 Requirements for Mooring, Entry to and Departure from Contractor's Facility;
accomplish
01/17/2013
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/29/2011
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish
07/29/2011
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
07/29/2011
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/29/2011
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
11/07/2013
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/29/2011
009-117 AEGIS Light Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA);
provide
01/06/2014
009-118 CG Deck Loading; accomplish 01/17/2013
009-120 Fact Finding and Critique of Unplanned Events; manage 01/06/2014
009-121 Ship Assessment/Inspection Requirements; provide 01/06/2014
ITEM_NO. TITLE DATE
077-01-001 UB 13 40WB0703 Hazardous Waste Produced on Naval Vessels; control
110-11-001 UB-13 40WB0703 Hull Plating; repair
120-11-001 UB-13 40WB0703 Canopy Stations; replace
123-12-001 UB-13 40WB0703-Fuel Oil Tank; inspect
130-11-001 UB 13 40WB0703 Hull Fittings inspection; accomplish and test
130-11-002 UB 13 40WB0703 Deck Hardware inspection; accomplish
233-00-001 UB-13 40WB0703- Engine; disconnect and reconnect
233-11-001 UB -13 40WBO703 Port/ STBD QSM11 Cummins Engine; overhaul
243-00-001 UB-13 40WB0703- Hamilton Waterjet Unit; repair
311-21-001 UB-13 40WB0703 Generator; repair
426-01-001 UB-13 40WB0703 Electrical and Electronic equipment inspect; test
514-01-001 UB-13 40WB0703 Air Conditioning Plant; replace
555-16-001 UB-13 40WB0703 Fire Suppression System; repair
561-11-001 UB-13 40WB0703 Steering System; repair
581-11-001 UB -13 40WB0703 Mooring and Towing Fitting, repair
584-31-001 UB-13 40WB0703 Bow Ramp; repair
611-16-001 UB- 13 Inflatable Rubber Fendering; repair
612-11-001 UB-13 40WB0703 Lifeline and Stanchions; repair
631-01-001 UB-13 40WB0703 Aluminum Craft Preservation; accomplish
631-11-001 UB- 13 40WB0703 Bilge Cleaning; accomplish
982-31-001 UB-13 40WB0703-Dock Trial and Sea Trial; accomplish