UB_13_COVER_AND_INDEX.pdf

PDF 178 KB Posted

Attached to
Dryberthing Phase Maintenance Availability (DPMA) on UB-11 & UB-13
Solicitation number
N55236-15-R-0004
Issued by

View the file

Other files

File Type Posted
UB_11_SPEC.pdf PDF
UB_13_SPEC.pdf PDF
UB_11_COVER_AND_INDEX.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

SWRMC (NMD)

ACU ONE (ACU 53257)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER: SSSD-506-14

INCLUDES ALL CHANGES THROUGH 10/29/2014

INDEX

SHIP: ACU ONE (ACU 53257) SSSD-506-14

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-15 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE DATE

009-01 General Criteria; accomplish 11/07/2013

009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/29/2011

009-03 Toxic and Hazardous Substances; control 01/17/2013

009-04 Quality Management System; provide 11/07/2013

009-05 Temporary Accesses; provide 01/17/2013

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

06/10/2014

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 06/10/2014

009-08 Fire Protection at Contractor's Facility; accomplish 06/10/2014

009-10 Shipboard Asbestos-Containing Material (ACM); control 07/29/2011

009-18 Magnetic Material; control 01/17/2013

009-19 Provisioning Technical Documentation (PTD); provide 07/29/2011

009-20 Government Property; control 01/17/2013

009-21 Logistics and Technical Data; provide 07/29/2011

009-23 Interferences; remove and install 01/17/2013

009-24 Authorization, Control, Isolation, Blanking, and Tagging Requirements; accomplish 01/17/2013

009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004

009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013

009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish

06/10/2014

009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for

Commercial Equipment/ Component; provide

07/19/2007

009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling

Equipment at Naval Facilities; accomplish

07/29/2011

009-59 Organotin Antifouling Material; control 07/29/2011

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

11/07/2013

009-61 Shipboard Use of Fluorocarbons; control 01/17/2013

009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/29/2011

009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011

009-67 Integrated Total Ship Testing; manage 01/17/2013

009-69 Heavy Weather Plan; provide 11/07/2013

009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for

Unmanned Vessels; accomplish

06/10/2014

009-72 Physical Security at Private Contractor's Facility; accomplish 01/17/2013

009-73 Shipboard Electrical/Electronic/Fiber Optic Cable; remove, relocate, repair, and install 11/07/2013

009-74 Occupational, Safety and Health Requirements; accomplish 06/10/2014

009-77 Cofferdam Requirements; accomplish 01/17/2013

009-79 Government Owned Material (GOM); status reporting 07/29/2011

009-80 Ship's Facilities; provide 07/29/2011

009-81 Compartment Closeout; accomplish 01/17/2013

009-82 Data Requirements When Installing an Equal Component Vice Specified Component;

provide

07/29/2011

009-83 Wire Rope Fitting Verification; provide 01/17/2013

009-84 Accountability of Temporary Fasteners; provide 01/17/2013

ITEM_NO. TITLE DATE

009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H)

Materials; accomplish

08/01/2008

009-87 Chemical Disinfection Procedures; accomplish 01/17/2013

009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify

07/29/2011

009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;

accomplish

07/29/2011

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution

Prevention Act (PPA) Information; provide

01/17/2013

009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013

009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 01/17/2013

009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous

Air Pollutants (NESHAPS) for Surface Coating Information; provide

01/17/2013

009-99 Ship Departure Report; provide 01/17/2013

009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/30/2010

009-101 Requirements for Mooring, Entry to and Departure from Contractor's Facility;

accomplish

01/17/2013

009-102 Alteration Verification; provide 07/29/2011

009-103 Weight and Moment Change Data; provide 07/29/2011

009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014

009-108 Aircraft Carrier Requirements for Mooring, Entry to, Movement within, and Departure from Contractor's Facility; accomplish

07/29/2011

009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;

accomplish

07/29/2011

009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/29/2011

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;

provide and manage

11/07/2013

009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/29/2011

009-117 AEGIS Light Off (ALO) Support for AEGIS Weapons Systems Assessments (AWSA);

provide

01/06/2014

009-118 CG Deck Loading; accomplish 01/17/2013

009-120 Fact Finding and Critique of Unplanned Events; manage 01/06/2014

009-121 Ship Assessment/Inspection Requirements; provide 01/06/2014

ITEM_NO. TITLE DATE

077-01-001 UB 13 40WB0703 Hazardous Waste Produced on Naval Vessels; control

110-11-001 UB-13 40WB0703 Hull Plating; repair

120-11-001 UB-13 40WB0703 Canopy Stations; replace

123-12-001 UB-13 40WB0703-Fuel Oil Tank; inspect

130-11-001 UB 13 40WB0703 Hull Fittings inspection; accomplish and test

130-11-002 UB 13 40WB0703 Deck Hardware inspection; accomplish

233-00-001 UB-13 40WB0703- Engine; disconnect and reconnect

233-11-001 UB -13 40WBO703 Port/ STBD QSM11 Cummins Engine; overhaul

243-00-001 UB-13 40WB0703- Hamilton Waterjet Unit; repair

311-21-001 UB-13 40WB0703 Generator; repair

426-01-001 UB-13 40WB0703 Electrical and Electronic equipment inspect; test

514-01-001 UB-13 40WB0703 Air Conditioning Plant; replace

555-16-001 UB-13 40WB0703 Fire Suppression System; repair

561-11-001 UB-13 40WB0703 Steering System; repair

581-11-001 UB -13 40WB0703 Mooring and Towing Fitting, repair

584-31-001 UB-13 40WB0703 Bow Ramp; repair

611-16-001 UB- 13 Inflatable Rubber Fendering; repair

612-11-001 UB-13 40WB0703 Lifeline and Stanchions; repair

631-01-001 UB-13 40WB0703 Aluminum Craft Preservation; accomplish

631-11-001 UB- 13 40WB0703 Bilge Cleaning; accomplish

982-31-001 UB-13 40WB0703-Dock Trial and Sea Trial; accomplish

File details come from the government source that posted it. Updated .