Attachment I Statement of Work.pdf

PDF 144 KB Posted

Attached to
Multi-Temperature Water Chiller
Solicitation number
N5005426Q0140
Issued by

About this file

This is a Statement of Work for the supply and delivery of an Air Condition Unit Twenty-Four Equivalent Unit (TEU) for the USS Hershel Woody Williams (ESB 4). The contractor shall supply and deliver one (1) Budzar Industries MTWC-50/50-SP refrigerated storage container measuring 8' x 9'6" x 20' with model number MTWC-50/50-SP to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, Norfolk, VA 23511. The required date of delivery is August 15, 2026, or the best available date.

The unit includes a comprehensive sub-component breakdown encompassing a fully integrated chiller system with two semi-hermetic compact screw compressors rated for 50 tons each, two carbon steel shell & tube heat exchangers, a 520-gallon stainless steel sealed tank, two 7.5 HP pumps, an Allen Bradley Compact Logix PLC with touchscreen controls, refrigerant and detection systems, insulation, stainless steel piping and fasteners, marine-duty water regulating valves, documentation, and factory acceptance testing. Shipping terms are FOB Destination with shipping costs to be included in the contractor's quote. Upon shipment, the contractor shall provide notification of date and tracking information to Allison Harding and Gary B. Seibel at the specified contact information.

View the file

Other files

File Type Posted
Combined Synopsis Solicitation.docx DOCX document
Attachment II DD 2345.pdf PDF
Attachment III Instructions for the DD2345 (1).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 | P a g e

Statement of Work

USS HERSHEL WOODY WILLIAMS (ESB 4)

SSP: MARMC-003-26

Title: AIR CONDITION UNIT TWENTY-FOOR TEQUIVALENT UNIT (TEU)

Work Spec Item(s): 516-11-001

1.0. INTRODUCTION

1.1. Background and Objective. This Statement of Work (SOW) defines the requirements for the supply and delivery of the parts listed in 2.1 be delivered to DLA Distribution Norfolk RMC PROJ, Bunker Hill Towaway Bldg. X136, and Norfolk, VA 23511.

2.0. GENERAL REQUIREMENTS

2.1. The Contractor shall supply and deliver the material listed in 2.1.1 complying with the following specifications:

SOW

Para no.

QTY NAME OF PART Part # / NSN DRAWING #

TECH MANUAL

PIECE #

2.1.1 1 EA 8’ X 9’6” X 20’

REFRIGERATED STORAGE

CONTAINER, CARRIER

MODEL NO: MTWC-50/50-SP

MTWC-50/50-SP PM MARMC 310.3 26-0007,

ESB –4 AC UNIT TEU

REPLACE

N/A

2.1.2. Sub-Component Breakdown

The above unit shall include the following standard features and sub-components:

Nomenclature Quantity

Fully Integrated Chiller System (Budzar Industries MTWC-50/50-SP) 1

8' x 9'6" x 20' ISO Container (outfitted with SS diamond plate flooring, exhaust fan, 10kW electric heater)

Semi-hermetic Compact Screw Compressors (Each rated for 50 tons) 2

Carbon Steel Shell & Tube Evaporator Heat Exchanger (Epoxy coated) 2

Carbon Steel Shell & Copper-Nickel Tubes Condenser Heat Exchanger (Epoxy coated) 2

520 Gallon S.S. Sealed Tank (Non-ASME with level gauge & switch interlock) 1

125 GPM @ 95 PSI 7.5 HP Pumps 2

Allen Bradley Compact Logix PLC with 10" touchscreen controls (NEMA 4 enclosure) 1

300# Cylinder of R134 Refrigerant (Estimated 240 Lbs system charge) 1

Empty 300# Cylinder 1

2 | P a g e

50' of 3/4" Hose with Rack 1

Factory Acceptance Testing (FAT) 1

Hard-Copy Installation & Maintenance Manuals 2

CD-ROM containing electronic copy of installation & maintenance manuals with drawings 1

3D Drawings 1 Set

Integrated Refrigerant and Smoke Detection System with Alarms 1 Set

Internal Water-to-Air Heat Exchanger (for box conditioning above 95°F ambient) 1

Condenser pressure self-contained marine-duty water regulating valve (Copper-nickel) 1

Dual Basket Strainers 1 Set

All piping and fasteners constructed from 304 Stainless Steel 1 Set

Armaflex rubber insulation on all cold surfaces 1 Set

2.2 All material to be in accordance with Reference 2.3 of work spec item 516-11-001.

2.3 Required Date of Delivery: 08/15/2026 or best available

3.0. DELIVERY / ACCEPTANCE

3.1. Delivery shall be made to the following address:

DLA Distribution Norfolk RMC PROJ Bunker Hill Towaway Bldg. X136 Norfolk, VA 23511

Primary: Mr. Cunningham Phone: (757) 278-8148 RIC 17H

3.2. Shipping terms shall be FOB Destination. The product shall be accepted and inspected at FOB Destination. Shipping cost shall be included in the quote.

4.0 MATERIAL SHIPMENT NOTIFICATION

4.1 Notification of date and tracking information to be provided to the following upon shipment of material:

4.1.1 Allison Harding; allison.k.harding.civ@us.navy.mil 757-967-6077

4.1.2 Gary B. Seibel; gary.b.seibel2.civ@us.navy.mil 757-967-6076

File details come from the government source that posted it. Updated .