DRAFT_NARRAGANSETT_INDEX.pdf
PDF 42 KB Posted
- Attached to
- USNS Narragansett multi-level overhaul
- Solicitation number
- N50054-17-R-0003
About this file
USNS Narragansett Draft Index
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DRAFT_NARRAGANSETT_PACKAGE.pdf | ||
| USNS_Narragansett_RFI.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX
SHIP: CARRIER STRIKE GROUP 4 (CNRMC 9577) MARMCN-801-17
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-17 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM_NO. TITLE DATE
009-01 General Criteria; accomplish 07/30/2015
009-02 Environmental Compliance Reports for Material Usage at Naval Facilities; provide 07/18/2014
009-03 Toxic and Hazardous Substances; control 07/18/2014
009-04 Quality Management System; provide 05/12/2016
009-05 Temporary Accesses; provide 07/30/2015
009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;
accomplish
07/30/2015
009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping; accomplish 07/30/2015
009-08 Fire Protection at Contractor's Facility; accomplish 07/30/2015
009-10 Shipboard Asbestos-Containing Material (ACM); control 07/18/2014
009-18 Magnetic Material; control 07/18/2014
009-19 Provisioning Technical Documentation (PTD); provide 07/30/2015
009-20 Government Property; control 07/18/2014
009-21 Logistics and Technical Data; provide 07/18/2014
009-23 Interferences; remove and install 07/30/2015
009-24 Shipboard Authorization, Control, Isolation, Blanking,Tagging, and Cleanliness Requirements; accomplish
07/30/2015
009-28 Fire Prevention Requirements; accomplish 07/30/2015
009-29 Asbestos-Free Pipe Hanger Liner Material; install 07/29/2004
009-34 Fire Protection of Unmanned Vessels at Contractor's Facility; provide 01/17/2013
009-35 Confined Space Entry, Certification, Fire Prevention Utilizing Military Fire Watches, and Housekeeping; accomplish
07/30/2015
009-39 Technical Manual Contract Requirement (TMCR) for New Technical Manuals for Commercial Equipment/ Component; provide
07/30/2015
009-40 Requirements for Contractor Cranes, Multi-Purpose Machines and Material Handling Equipment at Naval Facilities; accomplish
07/18/2014
009-59 Organotin Antifouling Material; control 07/29/2011
009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;
provide and manage
09/01/2015
009-61 Shipboard Use of Fluorocarbons; control 07/18/2014
009-64 Synthetic Fire-Resistant Hydraulic Fluid; control 07/18/2014
009-65 Polychlorinated Biphenyls (PCBs); control 07/29/2011
009-67 Integrated Total Ship Testing; manage 07/18/2014
009-69 Heavy Weather/Mooring Plan; provide 07/30/2015
009-70 Confined Space Entry, Certification, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish
07/30/2015
009-72 Physical Security at Private Contractor's Facility; accomplish 07/18/2014
009-73 Shipboard Electrical/Electronic Cable; remove, relocate, repair, and install 07/30/2015
009-74 Occupational, Safety and Health Requirements; accomplish 07/30/2015
009-77 Cofferdam Requirements; accomplish 07/18/2014 joseph.l.estrella Draft joseph.l.estrella Draft
ITEM_NO. TITLE DATE
009-79 Government Owned Material (GOM); status reporting 07/18/2014
009-80 Ship's Facilities; provide 07/18/2014
009-81 Compartment Closeout; accomplish 07/30/2015
009-82 Data Requirements When Installing an Equal Component Vice Specified Component; provide
07/29/2011
009-83 Wire Rope Fitting Verfication; provide 01/17/2013
009-84 Accountability of Temporary Fasteners; provide 07/18/2014
009-86 Recovery of Chlorofluorocarbon (CFC) Refrigerants and Fire Suppressant Halon (H) Materials; accomplish
08/01/2008
009-87 Chemical disinfection Procedures; accomplish 07/18/2014
009-88 Collection, Holding and Transfer (CHT) and Mogas Tanks, Spaces, and Piping, including Sewage or Mogas-Contaminated Tanks, Spaces, and Piping; certify
07/18/2014
009-89 Purchase and Inspection Requirements for Contractor Furnished Anodes;
accomplish
07/29/2011
009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide
07/18/2014
009-94 General Environmental Requirements for Work at Contractor's Facility; accomplish 01/17/2013
009-95 Mechanically Attached Fittings (MAF's) for Piping Systems; install 07/18/2014
009-97 Shipbuilding and Ship Repair Operations National Emission Standard for Hazardous Air Pollutants (NESHAPS) for Surface Coating Information; provide
01/17/2013
009-99 Ship Departure Report; provide 07/18/2014
009-100 Ship's Stability Process Control Procedure (PCP); maintain 07/18/2014
009-101 Requirements for Entry to and Departure from Contractor's Facility; accomplish 07/18/2014
009-102 Alteration Verification; provide 07/29/2011
009-103 Weight and Moment Change Data; provide 07/18/2014
009-106 Work Authorization Form Coordinator (WAFCOR); provide 01/06/2014
009-108 Aircraft Carrier Requirements for Entry to, Movement within, and Departure from Contractor's Facility; accomplish
07/18/2014
009-109 Special Requirements for Non-SUBSAFE Work on SUBSAFE-Certified Vessels;
accomplish
07/18/2014
009-110 Special Requirements for Non-Nuclear Work on Nuclear Vessels; accomplish 07/18/2014
009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration;
provide and manage
07/30/2015
009-112 Prevention of Radiographic-Inspection Ionizing-Radiation Hazards; accomplish 07/18/2014
009-118 CG Deck Loading; accomplish 07/18/2014
009-120 Fact Finding and Critique of Unplanned Events; manage 07/30/2015
009-121 Ship Assessment/Inspection Requirements; provide 07/18/2014
009-122 Temporary Padeye; install and remove 07/30/2015 joseph.l.estrella Draft
ITEM NO. TITLE
Accountability of Manhour and Material Reservation; accomplish042-13-001
Work Completion Certification Data; provide042-66-001
Hazardous Waste Produced on Naval Vessels; control077-00-001
Underwater Hull and Freeboard; repair110-11-001
American Bureau of Shipping (ABS) 5 Year Hull Gauging Inspection (Exterior); provide
110-21-001
American Bureau of Shipping (ABS) 5 Year Hull Gauging Inspection (Interior); provide
110-21-002
American Bureau of Shipping (ABS) 5 Year Main Deck Gauging Exterior Inspection; accomplish
110-21-003
Training Operations Center and Berthing Installation, Boat Alt 226NS/3C ; accomplish
111-80-001
Tank Inspection; accomplish123-11-001
Ballast Tank Inspection; accomplish123-11-002
Main Engine Room Soft Patch; repair150-11-001
Air Escape Piping; replace163-11-001
Sea Chest and Waster Sleeves; inspect and repair163-11-002
Pilot House Watertight Doors; Replace167-11-001
Weathertight Door; replace167-11-002
Mast; inspect, repair and preserve171-11-001
Propulsion Shafting; repair243-11-001
Stern Tube Seal (Port and Starboard) replace (DRYDOCK)243-11-002
Propeller; repair245-11-001
Main Propulsion Engine Silencer; replace259-11-001
Diesel Exhaust Piping; repair259-11-002
Main Engine Vent Trunk; repair259-11-003
Main Engine Jacket Water Coolers; clean and test262-11-001
Shore Power System Receptacle Modification, B/A 00281C; accomplish321-80-001
Stuffing Tubes; replace330-11-001
Navigation Sidelight Assembly/Shadow Box; replace422-11-001
Ensign-Staff and Aft Anchor Light Foundation; replace422-11-002
Speed Log Replacement, B/A 226NS/6C: accomplish426-80-001
Magnetic Compass Removal B/A ?????; accomplish426-80-002 joseph.l.estrella Draft
Tank Level Indicating (TLI) System; repair437-21-001
Pilot House Forward Antenna Sponson; replace441-51-001
Seatel Antenna Relocate B/A 226NS/7C; accomplish441-80-001
Ship's Whistle; inspect and preserve443-11-001
Lagging and Insulation, Inside Machinery Space; replace508-11-001
Lagging and Insulation, Outside Machinery Space; replace508-11-002
Air Conditioning (AC) Overboard Discharge Piping514-11-001
Saltwater and sewage Hull Penetration Valve; repair/replace
(DRYDOCK)
520-11-001
Sea Valve; repair520-11-002
Off Ship Firefighting System Removal B/A 226NS/1C; accomplish521-11-001
Reverse Osmosis Unit Sea Suction Piping; replace521-11-002
Seawater Cooling Discharge Piping; replace521-11-003
Auxiliary Seawater Piping System Chemical and Mechanical Cleaning and repair; accomplish
524-11-002
Auxiliary Sea Water Pump; replace524-21-003
Deck Drain Assembly; replace526-11-001
Reverse Osmosis Plant Replacement, B/A 226NS/5C: Accomplish530-80-001
Rudders and Skeg; clean, inspect and repair (DRYDOCK)562-11-001
Bow Thruster; repair568-11-001
Bow Thruster; Inspect (DRYDOCK)568-11-002
Stern Roller; replace575-11-001
Anchor, Anchor Chain and Chain Locker; preserve and repair581-11-001
Anchor and Anchor Handling Assembly; inspect and preserve581-11-002
Allied Marine Crane (Boat Davit); repair and test583-11-001
Towing Machinery Removal, B/A 226NS/2C; accomplish583-80-001
Allied Marine Crane; repair and test589-11-001
Collecting, Holding and Transfer (CHT) Piping; replace593-11-001
CHT Lift Station Tank Preservation; accomplish and repair593-11-002
Collection, Holding and Transfer (CHT) Tank; repair593-11-003
Vertical Ladder; replace623-12-001
Pilot House Window; repair625-11-001
Bilge; Preserve631-11-001 joseph.l.estrella Draft
Main Deck and Mission Deck Preservation and repair; accomplish631-11-002
Stack: Preserve631-13-001
Superstructure Preservation: accomplish631-21-001
Main Deck Preservation; accomplish631-21-002
Underwater Hull Preservation; accomplish631-31-001
Freeboard Preservation; accomplish631-41-001
Impressed Current Cathodic Protection (ICCP) System; inspect and repair
633-21-001
American Bureau of Shipping (ABS) Loadline Certificate Renewal;
accomplish
830-52-001
Light Off Assistance (LOA); provide980-11-001
Office Space Without Computer for In-Plant Availability; provide980-31-001
Engineering Production Completion Date (PCD)(Machinery Space Turnover) milestone/key event; provide
982-11-001
Dock Trial, Fast Cruise, and Sea Trial; accomplish982-31-001
Fuel Assistance and Towboat Service for Fuel Barge; provide992-11-001
Parking for Ship's Personnel; provide992-11-002
TEMP SERVICE PROVIDE992-11-003
Cleaning and Pumping: accomplish992-31-001
Regional Maintenance Center (RMC) Office Space Without Computer;
provide
992-35-001
Temporary Deck Covering; install993-31-001
Drydocking and Undocking; accomplish997-11-001 joseph.l.estrella Draft