J-1_CDRLs.xlsx

XLSX spreadsheet 65 KB Posted

Attached to
Interior Decking Support
Solicitation number
N50054-16-R-0007
Issued by

About this file

J-1 DD Form 1423, Contract Data Requirements List (CDRL)

View the file

Other files

File Type Posted
Bidder's_Questions_and_Answers_(001_-_002).xlsx XLSX spreadsheet
J-1_-_CDRLs.pdf PDF
N50054-16-R-0007-0001.pdf PDF
J-4_-_LWT_042-007.pdf PDF
J-13_-_Past_Performance_Reference_List.docx DOCX document
J-15__-_Request_for_Specification_Clarification.docx DOCX document
J-14_-_Past_Performance_Assessment_Questionnaire.docx DOCX document
J-11_-_DD-254.pdf PDF
J-6_-_LWT_042-011.pdf PDF
J-7_-_LWT_042-022.pdf PDF
J-12_-_Capacity_Evaluation_Form.xlsx XLSX spreadsheet
J-10_-_SWT_077-001.pdf PDF
J-2_-_LWT_042-002.pdf PDF
J-9_-_LWT_042-037.pdf PDF
J-5_-_LWT_042-008.pdf PDF
RPF_N50054-16-R-0007.docx DOCX document
Exhibit_A-E.xlsx XLSX spreadsheet
J-8_-_LWT_042-026.pdf PDF
J-3_-_LWT_042-005.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Contractor Name
Supplies/ServicesEstimated QuantityUnitUnit
PriceAmount
A101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00
A102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)5,000LF$0.00
A103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)15,000SQ FT$0.00
A104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)1,000LF$0.00
A105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)500SQ FT$0.00
A106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00
A107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)10,000LF$0.00
A108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)1,000SQ FT$0.00
A109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)1,000SQ FT$0.00
A110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00
A111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)2,500SQ FT$0.00
A112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)12,500SQ FT$0.00
A113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)2,500SQ FT$0.00
A114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)7,500SQ FT$0.00
A115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)2,500SQ FT$0.00
A116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)4,000LF$0.00
A117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)5,000SQ FT$0.00
A118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)5,000SQ FT$0.00
A119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)5,000SQ FT$0.00
A120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)5,000SQ FT$0.00
A121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)5,000SQ FT$0.00
A122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)5,000SQ FT$0.00
A123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)1,000LF$0.00
A124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)1,000LF$0.00
A125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)1,000LF$0.00
A126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)1,000LF$0.00
A127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)1,000LF$0.00
A128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)1,000LF$0.00
A129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)15,000SQ FT$0.00
A130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)5,000LF$0.00
A131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00
A132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00
A133LABOR and materials to install Carpet. (009-26 and 009-32)3,000SQ FT$0.00
A134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00
A135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)500SQ FT$0.00
A136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)2,000SQ FT$0.00
A137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)2,000SQ FT$0.00
A138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)2,000SQ FT$0.00
A139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)2,000SQ FT$0.00
A140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)2,000SQ FT$0.00
A141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)2,000SQ FT$0.00
A142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)500SQ FT$0.00
A143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500SQ FT$0.00
A144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500LF$0.00
A145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)500SQ FT$0.00
A146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)500SQ FT$0.00
A147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)2,500SQ FT$0.00
A148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)500LF$0.00
A149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)9,000SQ FT$0.00
A150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)9,000LF$0.00
A151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)9,000SQ FT$0.00
A152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
A153Undisclosed Work Straight Time1HR$0.00
A154Undisclosed Work - Overtime1HR$0.00
A155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00
A156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
A157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00
A158Travel/Per Diem (for bidding purposes only).1X$0.00
A159Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00
A160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

&"Arial,Bold"SOLICITATION N50054-16-R-0007 EXHIBIT A &"Arial,Regular"

&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES

BASE YEAR EFFORT

Second Yr ( Option 1)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
B101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00$0.00
B102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)5,000LF$0.00$0.00
B103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)15,000SQ FT$0.00$0.00
B104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)1,000LF$0.00$0.00
B105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)500SQ FT$0.00$0.00
B106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00$0.00
B107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)10,000LF$0.00$0.00
B108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)1,000SQ FT$0.00$0.00
B109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)1,000SQ FT$0.00$0.00
B110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00$0.00
B111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)2,500SQ FT$0.00$0.00
B112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)12,500SQ FT$0.00$0.00
B113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)2,500SQ FT$0.00$0.00
B114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)7,500SQ FT$0.00$0.00
B115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)2,500SQ FT$0.00$0.00
B116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)4,000LF$0.00$0.00
B117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)5,000SQ FT$0.00$0.00
B118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)1,000LF$0.00$0.00
B129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)15,000SQ FT$0.00$0.00
B130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)5,000LF$0.00$0.00
B131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
B133LABOR and materials to install Carpet. (009-26 and 009-32)3,000SQ FT$0.00$0.00
B134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00$0.00
B135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)500SQ FT$0.00$0.00
B136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)2,000SQ FT$0.00$0.00
B137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)2,000SQ FT$0.00$0.00
B138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)2,000SQ FT$0.00$0.00
B139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)2,000SQ FT$0.00$0.00
B140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)2,000SQ FT$0.00$0.00
B141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)2,000SQ FT$0.00$0.00
B142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
B143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500SQ FT$0.00$0.00
B144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500LF$0.00$0.00
B145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
B146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)500SQ FT$0.00$0.00
B147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)2,500SQ FT$0.00$0.00
B148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)500LF$0.00$0.00
B149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)9,000SQ FT$0.00$0.00
B150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)9,000LF$0.00$0.00
B151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)9,000SQ FT$0.00$0.00
B152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
B153Undisclosed Work Straight Time1HR$0.00$0.00
B154Undisclosed Work - Overtime1HR$0.00$0.00
B155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00$0.00
B156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
B157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00$0.00
B158Travel/Per Diem (for bidding purposes only).1X0.00%$0.00
B159Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS0.00%$0.00
B160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT B &"Arial,Regular" &"Arial,Bold"

SUPPLIES OR SERVICES AND PRICES

SECOND YEAR EFFORT (OPTION I)

Third Yr (Option 2)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
C101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00$0.00
C102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)5,000LF$0.00$0.00
C103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)15,000SQ FT$0.00$0.00
C104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)1,000LF$0.00$0.00
C105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)500SQ FT$0.00$0.00
C106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00$0.00
C107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)10,000LF$0.00$0.00
C108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)1,000SQ FT$0.00$0.00
C109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)1,000SQ FT$0.00$0.00
C110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00$0.00
C111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)2,500SQ FT$0.00$0.00
C112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)12,500SQ FT$0.00$0.00
C113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)2,500SQ FT$0.00$0.00
C114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)7,500SQ FT$0.00$0.00
C115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)2,500SQ FT$0.00$0.00
C116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)4,000LF$0.00$0.00
C117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)5,000SQ FT$0.00$0.00
C118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)1,000LF$0.00$0.00
C129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)15,000SQ FT$0.00$0.00
C130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)5,000LF$0.00$0.00
C131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
C133LABOR and materials to install Carpet. (009-26 and 009-32)3,000SQ FT$0.00$0.00
C134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00$0.00
C135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)500SQ FT$0.00$0.00
C136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)2,000SQ FT$0.00$0.00
C137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)2,000SQ FT$0.00$0.00
C138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)2,000SQ FT$0.00$0.00
C139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)2,000SQ FT$0.00$0.00
C140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)2,000SQ FT$0.00$0.00
C141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)2,000SQ FT$0.00$0.00
C142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
C143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500SQ FT$0.00$0.00
C144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500LF$0.00$0.00
C145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
C146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)500SQ FT$0.00$0.00
C147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)2,500SQ FT$0.00$0.00
C148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)500LF$0.00$0.00
C149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)9,000SQ FT$0.00$0.00
C150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)9,000LF$0.00$0.00
C151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)9,000SQ FT$0.00$0.00
C152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
C153Undisclosed Work Straight Time1HR$0.00$0.00
C154Undisclosed Work - Overtime1HR$0.00$0.00
C155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00$0.00
C156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
C157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00$0.00
C158Travel/Per Diem (for bidding purposes only).1X0.00%$0.00
C159Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00$0.00
C160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT C&"Arial,Regular"

THIRD YEAR EFFORT (OPTION II)

Fourth Yr (Option 3)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
D101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00$0.00
D102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)5,000LF$0.00$0.00
D103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)15,000SQ FT$0.00$0.00
D104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)1,000LF$0.00$0.00
D105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)500SQ FT$0.00$0.00
D106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00$0.00
D107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)10,000LF$0.00$0.00
D108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)1,000SQ FT$0.00$0.00
D109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)1,000SQ FT$0.00$0.00
D110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00$0.00
D111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)2,500SQ FT$0.00$0.00
D112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)12,500SQ FT$0.00$0.00
D113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)2,500SQ FT$0.00$0.00
D114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)7,500SQ FT$0.00$0.00
D115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)2,500SQ FT$0.00$0.00
D116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)4,000LF$0.00$0.00
D117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)5,000SQ FT$0.00$0.00
D118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)1,000LF$0.00$0.00
D129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)15,000SQ FT$0.00$0.00
D130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)5,000LF$0.00$0.00
D131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
D133LABOR and materials to install Carpet. (009-26 and 009-32)3,000SQ FT$0.00$0.00
D134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00$0.00
D135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)500SQ FT$0.00$0.00
D136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)2,000SQ FT$0.00$0.00
D137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)2,000SQ FT$0.00$0.00
D138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)2,000SQ FT$0.00$0.00
D139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)2,000SQ FT$0.00$0.00
D140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)2,000SQ FT$0.00$0.00
D141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)2,000SQ FT$0.00$0.00
D142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
D143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500SQ FT$0.00$0.00
D144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500LF$0.00$0.00
D145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
D146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)500SQ FT$0.00$0.00
D147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)2,500SQ FT$0.00$0.00
D148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)500LF$0.00$0.00
D149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)9,000SQ FT$0.00$0.00
D150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)9,000LF$0.00$0.00
D151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)9,000SQ FT$0.00$0.00
D152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00$0.00
DThe Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
D153Undisclosed Work Straight Time1HR$0.00$0.00
D154Undisclosed Work - Overtime1HR$0.00$0.00
D155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00$0.00
D156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
D157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00$0.00
D158Travel/Per Diem (for bidding purposes only).1X0.00%$0.00
D159Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00$0.00
D160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.

NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.

NOTE 4: ELINS are to be fully burdened to include any required rental equipment.

EXHIBIT D &"Arial,Regular"

FOURTH YEAR EFFORT (OPTION III)

Fifth Yr (Option 4)

Contractor Name
Supplies/ServicesEst QtyUnitUnit
PriceAmount
E101LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32)100,000SQ FT$0.00$0.00
E102LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32)5,000LF$0.00$0.00
E103LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32)15,000SQ FT$0.00$0.00
E104LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32)1,000LF$0.00$0.00
E105LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32)500SQ FT$0.00$0.00
E106LABOR and materials to Clean and Prime Decks.(009-26 and 009-32)100,000SQ FT$0.00$0.00
E107LABOR and materials to Clean and Prime Cove. (009-26 and 009-32)10,000LF$0.00$0.00
E108LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32)1,000SQ FT$0.00$0.00
E109LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32)1,000SQ FT$0.00$0.00
E110LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32)100,000SQ FT$0.00$0.00
E111LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32)2,500SQ FT$0.00$0.00
E112LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)12,500SQ FT$0.00$0.00
E113LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32)2,500SQ FT$0.00$0.00
E114LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32)7,500SQ FT$0.00$0.00
E115LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32)2,500SQ FT$0.00$0.00
E116LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32)4,000LF$0.00$0.00
E117LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32)5,000SQ FT$0.00$0.00
E118LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E119LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E120LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E121LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E122LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E123LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E124LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E125LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E126LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E127LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E128LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32)1,000LF$0.00$0.00
E129LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32)15,000SQ FT$0.00$0.00
E130LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32)5,000LF$0.00$0.00
E131LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E132LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32)5,000SQ FT$0.00$0.00
E133LABOR and materials to install Carpet. (009-26 and 009-32)3,000SQ FT$0.00$0.00
E134LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32)200LF$0.00$0.00
E135LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32)500SQ FT$0.00$0.00
E136LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32)2,000SQ FT$0.00$0.00
E137LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32)2,000SQ FT$0.00$0.00
E138LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32)2,000SQ FT$0.00$0.00
E139LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32)2,000SQ FT$0.00$0.00
E140LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32)2,000SQ FT$0.00$0.00
E141LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32)2,000SQ FT$0.00$0.00
E142LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
E143LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500SQ FT$0.00$0.00
E144LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)500LF$0.00$0.00
E145LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32)500SQ FT$0.00$0.00
E146LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32)500SQ FT$0.00$0.00
E147LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32)2,500SQ FT$0.00$0.00
E148LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32)500LF$0.00$0.00
E149LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32)9,000SQ FT$0.00$0.00
E150LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32)9,000LF$0.00$0.00
E151LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32)9,000SQ FT$0.00$0.00
E152LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32)5,000SQ FT$0.00$0.00
The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work."
E153Undisclosed Work Straight Time1HR$0.00$0.00
E154Undisclosed Work - Overtime1HR$0.00$0.00
E155Undisclosed Work - Material (Covers only material required for Undisclosed Work)1U.S. DOLLARS$0.00$0.00
E156Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.)1X0.00%$0.00
In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN.
E157Travel/Per Diem (for bidding purposes only)1US DOLLARS$0.00$0.00
E158Travel/Per Diem (for bidding purposes only).1X0.00%$0.00
E159Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.)1US DOLLARS$0.00$0.00
E160Contract Data Requirements (DD Form 1423)NSP

Total Estimate for Base Year No Bid

NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.

NOTE 2: ELINS are to be fully burdened to include any required subcontractors.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .