Exhibit_A-E.xlsx
XLSX spreadsheet 65 KB Posted
- Attached to
- Interior Decking Support
- Solicitation number
- N50054-16-R-0007
About this file
Exhibit A-E
View the file
Other files
| File | Type | Posted |
|---|---|---|
| J-1_-_CDRLs.pdf | ||
| N50054-16-R-0007-0001.pdf | ||
| Bidder's_Questions_and_Answers_(001_-_002).xlsx | XLSX spreadsheet | |
| J-1_CDRLs.xlsx | XLSX spreadsheet | |
| J-6_-_LWT_042-011.pdf | ||
| J-9_-_LWT_042-037.pdf | ||
| J-5_-_LWT_042-008.pdf | ||
| RPF_N50054-16-R-0007.docx | DOCX document | |
| J-8_-_LWT_042-026.pdf | ||
| J-3_-_LWT_042-005.pdf | ||
| J-7_-_LWT_042-022.pdf | ||
| J-12_-_Capacity_Evaluation_Form.xlsx | XLSX spreadsheet | |
| J-10_-_SWT_077-001.pdf | ||
| J-2_-_LWT_042-002.pdf | ||
| J-4_-_LWT_042-007.pdf | ||
| J-13_-_Past_Performance_Reference_List.docx | DOCX document | |
| J-15__-_Request_for_Specification_Clarification.docx | DOCX document | |
| J-14_-_Past_Performance_Assessment_Questionnaire.docx | DOCX document | |
| J-11_-_DD-254.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| Contractor Name | |||||||
| Supplies/Services | Estimated Quantity | Unit | Unit | ||||
| Price | Amount | ||||||
| A | 101 | LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | ||
| A | 102 | LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32) | 5,000 | LF | $0.00 | ||
| A | 103 | LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32) | 15,000 | SQ FT | $0.00 | ||
| A | 104 | LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 105 | LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 106 | LABOR and materials to Clean and Prime Decks.(009-26 and 009-32) | 100,000 | SQ FT | $0.00 | ||
| A | 107 | LABOR and materials to Clean and Prime Cove. (009-26 and 009-32) | 10,000 | LF | $0.00 | ||
| A | 108 | LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | ||
| A | 109 | LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | ||
| A | 110 | LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | ||
| A | 111 | LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | ||
| A | 112 | LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 12,500 | SQ FT | $0.00 | ||
| A | 113 | LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32) | 2,500 | SQ FT | $0.00 | ||
| A | 114 | LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32) | 7,500 | SQ FT | $0.00 | ||
| A | 115 | LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | ||
| A | 116 | LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32) | 4,000 | LF | $0.00 | ||
| A | 117 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 118 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 119 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 120 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 121 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 122 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 123 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 124 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 125 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 126 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 127 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 128 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | ||
| A | 129 | LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32) | 15,000 | SQ FT | $0.00 | ||
| A | 130 | LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32) | 5,000 | LF | $0.00 | ||
| A | 131 | LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 132 | LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| A | 133 | LABOR and materials to install Carpet. (009-26 and 009-32) | 3,000 | SQ FT | $0.00 | ||
| A | 134 | LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32) | 200 | LF | $0.00 | ||
| A | 135 | LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 136 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 137 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 138 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 139 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 140 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 141 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | ||
| A | 142 | LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 143 | LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 144 | LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | LF | $0.00 | ||
| A | 145 | LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 146 | LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32) | 500 | SQ FT | $0.00 | ||
| A | 147 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | ||
| A | 148 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32) | 500 | LF | $0.00 | ||
| A | 149 | LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | ||
| A | 150 | LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32) | 9,000 | LF | $0.00 | ||
| A | 151 | LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | ||
| A | 152 | LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | ||
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | |||||||
| A | 153 | Undisclosed Work Straight Time | 1 | HR | $0.00 | ||
| A | 154 | Undisclosed Work - Overtime | 1 | HR | $0.00 | ||
| A | 155 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 1 | U.S. DOLLARS | $0.00 | ||
| A | 156 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 1 | X | $0.00 | ||
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | |||||||
| A | 157 | Travel/Per Diem (for bidding purposes only) | 1 | US DOLLARS | $0.00 | ||
| A | 158 | Travel/Per Diem (for bidding purposes only). | 1 | X | $0.00 | ||
| A | 159 | Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.) | 1 | US DOLLARS | $0.00 | ||
| A | 160 | Contract Data Requirements (DD Form 1423) | NSP |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
&"Arial,Bold"SOLICITATION N50054-16-R-0007 EXHIBIT A &"Arial,Regular"
&"Arial,Bold"SUPPLIES OR SERVICES AND PRICES
BASE YEAR EFFORT
Second Yr ( Option 1)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| B | 101 | LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| B | 102 | LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| B | 103 | LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| B | 104 | LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 105 | LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 106 | LABOR and materials to Clean and Prime Decks.(009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| B | 107 | LABOR and materials to Clean and Prime Cove. (009-26 and 009-32) | 10,000 | LF | $0.00 | $0.00 |
| B | 108 | LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| B | 109 | LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| B | 110 | LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| B | 111 | LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| B | 112 | LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 12,500 | SQ FT | $0.00 | $0.00 |
| B | 113 | LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| B | 114 | LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32) | 7,500 | SQ FT | $0.00 | $0.00 |
| B | 115 | LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| B | 116 | LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32) | 4,000 | LF | $0.00 | $0.00 |
| B | 117 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 118 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 119 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 120 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 121 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 122 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 123 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 124 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 125 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 126 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 127 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 128 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| B | 129 | LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| B | 130 | LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| B | 131 | LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 132 | LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| B | 133 | LABOR and materials to install Carpet. (009-26 and 009-32) | 3,000 | SQ FT | $0.00 | $0.00 |
| B | 134 | LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32) | 200 | LF | $0.00 | $0.00 |
| B | 135 | LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 136 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 137 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 138 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 139 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 140 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 141 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| B | 142 | LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 143 | LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 144 | LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| B | 145 | LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 146 | LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| B | 147 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| B | 148 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| B | 149 | LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| B | 150 | LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32) | 9,000 | LF | $0.00 | $0.00 |
| B | 151 | LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| B | 152 | LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | ||||||
| B | 153 | Undisclosed Work Straight Time | 1 | HR | $0.00 | $0.00 |
| B | 154 | Undisclosed Work - Overtime | 1 | HR | $0.00 | $0.00 |
| B | 155 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 1 | U.S. DOLLARS | $0.00 | $0.00 |
| B | 156 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 1 | X | 0.00% | $0.00 |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| B | 157 | Travel/Per Diem (for bidding purposes only) | 1 | US DOLLARS | $0.00 | $0.00 |
| B | 158 | Travel/Per Diem (for bidding purposes only). | 1 | X | 0.00% | $0.00 |
| B | 159 | Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.) | 1 | US DOLLARS | 0.00% | $0.00 |
| B | 160 | Contract Data Requirements (DD Form 1423) | NSP |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
EXHIBIT B &"Arial,Regular" &"Arial,Bold"
SUPPLIES OR SERVICES AND PRICES
SECOND YEAR EFFORT (OPTION I)
Third Yr (Option 2)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| C | 101 | LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| C | 102 | LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| C | 103 | LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| C | 104 | LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 105 | LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 106 | LABOR and materials to Clean and Prime Decks.(009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| C | 107 | LABOR and materials to Clean and Prime Cove. (009-26 and 009-32) | 10,000 | LF | $0.00 | $0.00 |
| C | 108 | LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| C | 109 | LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| C | 110 | LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| C | 111 | LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| C | 112 | LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 12,500 | SQ FT | $0.00 | $0.00 |
| C | 113 | LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| C | 114 | LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32) | 7,500 | SQ FT | $0.00 | $0.00 |
| C | 115 | LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| C | 116 | LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32) | 4,000 | LF | $0.00 | $0.00 |
| C | 117 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 118 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 119 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 120 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 121 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 122 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 123 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 124 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 125 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 126 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 127 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 128 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| C | 129 | LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| C | 130 | LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| C | 131 | LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 132 | LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| C | 133 | LABOR and materials to install Carpet. (009-26 and 009-32) | 3,000 | SQ FT | $0.00 | $0.00 |
| C | 134 | LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32) | 200 | LF | $0.00 | $0.00 |
| C | 135 | LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 136 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 137 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 138 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 139 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 140 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 141 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| C | 142 | LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 143 | LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 144 | LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| C | 145 | LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 146 | LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| C | 147 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| C | 148 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| C | 149 | LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| C | 150 | LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32) | 9,000 | LF | $0.00 | $0.00 |
| C | 151 | LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| C | 152 | LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | ||||||
| C | 153 | Undisclosed Work Straight Time | 1 | HR | $0.00 | $0.00 |
| C | 154 | Undisclosed Work - Overtime | 1 | HR | $0.00 | $0.00 |
| C | 155 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 1 | U.S. DOLLARS | $0.00 | $0.00 |
| C | 156 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 1 | X | 0.00% | $0.00 |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| C | 157 | Travel/Per Diem (for bidding purposes only) | 1 | US DOLLARS | $0.00 | $0.00 |
| C | 158 | Travel/Per Diem (for bidding purposes only). | 1 | X | 0.00% | $0.00 |
| C | 159 | Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.) | 1 | US DOLLARS | $0.00 | $0.00 |
| C | 160 | Contract Data Requirements (DD Form 1423) | NSP |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
EXHIBIT C&"Arial,Regular"
THIRD YEAR EFFORT (OPTION II)
Fourth Yr (Option 3)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| D | 101 | LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| D | 102 | LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| D | 103 | LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| D | 104 | LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 105 | LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 106 | LABOR and materials to Clean and Prime Decks.(009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| D | 107 | LABOR and materials to Clean and Prime Cove. (009-26 and 009-32) | 10,000 | LF | $0.00 | $0.00 |
| D | 108 | LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| D | 109 | LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| D | 110 | LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| D | 111 | LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| D | 112 | LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 12,500 | SQ FT | $0.00 | $0.00 |
| D | 113 | LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| D | 114 | LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32) | 7,500 | SQ FT | $0.00 | $0.00 |
| D | 115 | LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| D | 116 | LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32) | 4,000 | LF | $0.00 | $0.00 |
| D | 117 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 118 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 119 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 120 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 121 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 122 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 123 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 124 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 125 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 126 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 127 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 128 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| D | 129 | LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| D | 130 | LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| D | 131 | LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 132 | LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | 133 | LABOR and materials to install Carpet. (009-26 and 009-32) | 3,000 | SQ FT | $0.00 | $0.00 |
| D | 134 | LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32) | 200 | LF | $0.00 | $0.00 |
| D | 135 | LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 136 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 137 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 138 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 139 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 140 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 141 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| D | 142 | LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 143 | LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 144 | LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| D | 145 | LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 146 | LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| D | 147 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| D | 148 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| D | 149 | LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| D | 150 | LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32) | 9,000 | LF | $0.00 | $0.00 |
| D | 151 | LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| D | 152 | LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| D | The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | |||||
| D | 153 | Undisclosed Work Straight Time | 1 | HR | $0.00 | $0.00 |
| D | 154 | Undisclosed Work - Overtime | 1 | HR | $0.00 | $0.00 |
| D | 155 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 1 | U.S. DOLLARS | $0.00 | $0.00 |
| D | 156 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 1 | X | 0.00% | $0.00 |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| D | 157 | Travel/Per Diem (for bidding purposes only) | 1 | US DOLLARS | $0.00 | $0.00 |
| D | 158 | Travel/Per Diem (for bidding purposes only). | 1 | X | 0.00% | $0.00 |
| D | 159 | Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.) | 1 | US DOLLARS | $0.00 | $0.00 |
| D | 160 | Contract Data Requirements (DD Form 1423) | NSP |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors. Subcontract effort shall not be priced as material or considered as part of the material pools.
NOTE 3: Overtime is not authorized under the terms and conditions of this contract (with the exception of Undisclosed Work - Overtime) and thus will not be paid as a reimbursable expense or cost related to travel or any other category of incurred cost or expense.
NOTE 4: ELINS are to be fully burdened to include any required rental equipment.
EXHIBIT D &"Arial,Regular"
FOURTH YEAR EFFORT (OPTION III)
Fifth Yr (Option 4)
| Contractor Name | |||||
| Supplies/Services | Est Qty | Unit | Unit | ||
| Price | Amount |
| E | 101 | LABOR and materials to remove Deck Covering, including Cosmetic Polymeric, Mastic, Polyurethane, Porcelain, Quarry, Vinyl Deck Tile, Wear Resistant and Ceramic Tile, Light-weight Concrete, Deck Rings, Collars and Magnesite. To include underlay and waterproof membrane. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| E | 102 | LABOR and materials to remove all Cove Case (Wet Decks). To include underlay and waterproof membrane. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| E | 103 | LABOR and materials to remove Electrical Deck Matting and Carpet.(009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| E | 104 | LABOR and materials to remove all Cove Base (Dry Decks, ie. plastic, vinyl, or rubber). (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 105 | LABOR and materials to remove Deck Covering, including Ammunition Magnesite and Magnesium Oxychloride Magnesite; to include underlay.(009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 106 | LABOR and materials to Clean and Prime Decks.(009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| E | 107 | LABOR and materials to Clean and Prime Cove. (009-26 and 009-32) | 10,000 | LF | $0.00 | $0.00 |
| E | 108 | LABOR and materials to apply High Durability Deck Paint; MIL-PRF-32171, Type I or Type III.MIL-PRF-32171 Type II shall be utilized on submarines. MIL-PRF-32171 Type IV shall be utilized on AFFF Stations. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| E | 109 | LABOR and materials to install new light-weight concrete deck covering system. (009-26 and 009-32) | 1,000 | SQ FT | $0.00 | $0.00 |
| E | 110 | LABOR and materials to install Epoxy Underlay; MIL-PRF-3135 Type I, Class 2 or Type II Class 2. (009-26 and 009-32) | 100,000 | SQ FT | $0.00 | $0.00 |
| E | 111 | LABOR and materials to install Magnesia Insulation Underlay; MIL-D-23134. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| E | 112 | LABOR and materials to install 3 X 3 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 12,500 | SQ FT | $0.00 | $0.00 |
| E | 113 | LABOR and materials to install 4 X 4 Porcelain Tile, including waterproof membrane.(009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| E | 114 | LABOR and materials to install 6 X 6 Porcelain Tile or Quarry Tile including waterproof membrane. (009-26 and 009-32) | 7,500 | SQ FT | $0.00 | $0.00 |
| E | 115 | LABOR and materials to install 8 X 8 Porcelain Tile, including waterproof membrane. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| E | 116 | LABOR and materials to install Porcelain Tile Cove, including waterproof membrane. (009-26 and 009-32) | 4,000 | LF | $0.00 | $0.00 |
| E | 117 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I . (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 118 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 119 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 120 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 121 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 122 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 123 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 124 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II to Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 125 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 126 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 127 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 TypeV Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 128 | LABOR and materials to install Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI Cove. (009-26 and 009-32) | 1,000 | LF | $0.00 | $0.00 |
| E | 129 | LABOR and materials to install Electrical Grade Sheets and Matting MIL-DTL-15562, Type I, Type II or Type III . (009-26 and 009-32) | 15,000 | SQ FT | $0.00 | $0.00 |
| E | 130 | LABOR and materials for Chemical Fusion or Heat Weld. (009-26 and 009-32) | 5,000 | LF | $0.00 | $0.00 |
| E | 131 | LABOR and materials to install Vinyl Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 132 | LABOR and materials to install Wear Resistant Deck Tile. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| E | 133 | LABOR and materials to install Carpet. (009-26 and 009-32) | 3,000 | SQ FT | $0.00 | $0.00 |
| E | 134 | LABOR and materials to install Cove Case (plastic, vinyl, or rubber). (009-26 and 009-32) | 200 | LF | $0.00 | $0.00 |
| E | 135 | LABOR and materials to install Ammunition Magnesite or Magnesium Oxychloride. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 136 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 137 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type II . (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 138 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type III. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 139 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type IV. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 140 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type V. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 141 | LABOR and materials to repair Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type VI. (009-26 and 009-32) | 2,000 | SQ FT | $0.00 | $0.00 |
| E | 142 | LABOR and materials to repair Vinyl Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 143 | LABOR and materials to repair Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 144 | LABOR and materials to repair Base Cove for Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| E | 145 | LABOR and materials to repair Wear Resistant Deck Tile. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 146 | LABOR and materials to repair Ammunition Magnesite and Magnesium Oxychloride Magnesite. (009-26 and 009-32) | 500 | SQ FT | $0.00 | $0.00 |
| E | 147 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles. (009-26 and 009-32) | 2,500 | SQ FT | $0.00 | $0.00 |
| E | 148 | LABOR and materials to regrout Porcelain, Quarry, and Ceramic Tiles Base Cove. (009-26 and 009-32) | 500 | LF | $0.00 | $0.00 |
| E | 149 | LABOR and materials to reseal Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| E | 150 | LABOR and materials to reseal Case Cove Cosmetic Polymeric Deck Covering; MIL-PRF-24613 Type I,II,III,IV,V and Type VI Cove. (009-26 and 009-32) | 9,000 | LF | $0.00 | $0.00 |
| E | 151 | LABOR and materials to install additional Seal Coat Cosmetic Polymeric Deck Covering; MIL-PRF-24613. (009-26 and 009-32) | 9,000 | SQ FT | $0.00 | $0.00 |
| E | 152 | LABOR and materials to change of Color of Cosmetic Polymeric Deck covering. (009-26 and 009-32) | 5,000 | SQ FT | $0.00 | $0.00 |
| The Undisclosed Work ELINS are intended to be used to accomplish tasks that are required, but which are not covered by ELINS A101 through A138. Undisclosed Work will not be used to reimburse overtime used in accomplishing tasks under ELINS A101 through A138. Undisclosed work tasks will be reimbursed based on the hourly rate bid, times the actual number of hours agreed to and fixed, plus the actual costs of material, both as defined in Clause RMC C-2-0050, entitled "Ordering Work." | ||||||
| E | 153 | Undisclosed Work Straight Time | 1 | HR | $0.00 | $0.00 |
| E | 154 | Undisclosed Work - Overtime | 1 | HR | $0.00 | $0.00 |
| E | 155 | Undisclosed Work - Material (Covers only material required for Undisclosed Work) | 1 | U.S. DOLLARS | $0.00 | $0.00 |
| E | 156 | Undisclosed Work - Material G&A/Handling (Contractor to submit a percentage.) | 1 | X | 0.00% | $0.00 |
| In negotiating the fixed price for materials, the contractor shall submit quotes or invoices for the materials required. The negotiated price for materials shall be the quote or invoice price submitted by the contractor for actual materials plus transportation charges, both subject to verification by the Government as to reasonableness. The Government will not pay any material handling charges under the material ELIN. All material handling charges are included in the Material G&A/Handling ELIN. | ||||||
| E | 157 | Travel/Per Diem (for bidding purposes only) | 1 | US DOLLARS | $0.00 | $0.00 |
| E | 158 | Travel/Per Diem (for bidding purposes only). | 1 | X | 0.00% | $0.00 |
| E | 159 | Adjustment/Percentage for ELINS A 101 through A 152 to accomplish tasks on submarines versus surface vessels. ELIN A 160 represents the amount of adjustment to be received for doing work on submarines (Contractor to submit a percentage.) | 1 | US DOLLARS | $0.00 | $0.00 |
| E | 160 | Contract Data Requirements (DD Form 1423) | NSP |
Total Estimate for Base Year No Bid
NOTE 1: Proposed prices for each line item are to be fully burdened to include the potential of escalating fuel costs, all direct and indirect costs, LABOR, material (with the exception of the provision for material in Undisclosed Work), equipment rental, services, overhead, profit and to include work and costs to implement Cat I and II NAVSEA Standard Items (NSIs), Local Work Templates (LWTs), Standard Work Templates (SWTs), and CDRLs. Additionally, any overtime cost required to complete these tasks must be included in the ELIN prices.
NOTE 2: ELINS are to be fully burdened to include any required subcontractors.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .