A5 PWS - Fire Suppression System_Redacted.pdf

PDF 443 KB Posted

Attached to
Service – Fire Suppression System Testing and Certification
Solicitation number
N4523A63066390
Issued by

About this file

Performance Work Statement Summary

This Performance Work Statement (PWS) is for non-personnel services to provide confidence testing and certification for an ANSUL Automatic CO2 Fire Suppression System protecting industrial equipment at Puget Sound Naval Shipyard & IMF in Bremerton, Washington. The contract period runs semi-annually from June 2027 to June 2032, with a minimum of one year and maximum of five years of performance. The contractor must provide two semi-annual maintenance visits (at six-month intervals) and respond to two trouble calls per year within twenty-four hours of notification. Work shall be performed between 0720-1602 hours, Monday through Friday, except federal holidays or government facility closures.

The contractor must employ a NICET-certified special hazard technician (Level 2 or above) trained by ANSUL to design, install, test, and maintain CO2 fire suppression systems in compliance with NFPA 12 standards. The contractor shall be an authorized ANSUL stocking distributor with immediate access to replacement parts, maintain a CO2 recharging station within 50 miles of the shipyard with 24-hour recharging capability, and provide 24/7 emergency service availability. Scheduled maintenance includes complete inspection and testing of system components (detectors, agent release stations, audible/visual devices, CO2 storage container), signal verification to monitoring companies, protected area inspections, battery checks, and system operations training. Emergency trouble calls are defined as eight-hour service visits with up to $200 in minor materials and repair parts included. All task orders for unscheduled repairs shall not exceed $20,000 over the contract ordering period. Service reports must be submitted within forty-eight hours of visit completion on contractor letterhead, signed by a company official, addressing all applicable NFPA 12 requirements in Microsoft Word or PDF format. Contractor personnel must maintain a NAVSEA green badge and security clearance for the contract duration.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Service – Fire Suppression System Testing and Certification

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide confidence testing and certification for an ANSUL Automatic CO2 Fire Suppression System at Puget Sound Naval Shipyard & IMF, Bremerton WA. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform inspection and confidence testing on an ANSUL Automatic CO2 Fire Suppression System as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: The ANSUL Automatic CO2 Fire Suppression System protects industrial plant equipment (varnish dip tank system) which supports dipping and coating of electric motor components. Scheduled and potential emergent work requires the system to be in a state of continuous operation

1.3 Objectives:

• Scheduled maintenance test

• Trouble calls

• Service reports

1.4 Scope: The contract shall provide onsite maintenance service for a minimum of one (1) year, and a maximum of five (5) years. The service shall include a maximum of two (2) maintenance visits, each to be accomplished at six (6) month intervals. Additionally, the service shall include two (2) trouble calls per year. Work shall be performed in compliance with references listed in Part 6.

1.4.1 Scheduled maintenance: Work shall include complete inspection and confidence testing of the ANSUL Automatic CO2 Fire Suppression System (refer to Part 5).

1.4.2 Trouble Calls: The Contractor shall respond to trouble calls within twenty-four (24) hours after notification (refer to Part 5).

1.4.3 Service Reports: Upon completion of each visit, the Contractor shall draft and submit a service report (see Technical Exhibit 2).

1.5 Period of Performance: Semi-Annual from June 2027 to June 2032. Date of award, TBD.

1.6 General Information

1.6.1 Recognized Holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.6.2 Hours of Operation: The Contractor is responsible for conducting business, between the hours of 0720 - 1602 HRS, MON - FRI except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.3 Place of Performance: The work to be performed under this contract will be at Puget Sound Naval Shipyard & IMF, , Bremerton WA

1.6.4 Security Requirements: Contractor personnel performing work under this contract must have a NAVSEA green badge at time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached DD254.

1.6.5 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.6.6 Special Qualifications: The Contractor shall employ a National Institute of Certification in Engineering Technologies (NICET) certified special hazard technician (Level 2 or above). The technician shall be responsible for inspecting and testing the ANSUL Automatic CO2 Fire Suppression System, per National Fire Protection Association, NFPA 12. The contractor shall be trained by ANSUL to design, install, test, and maintain carbon dioxide fire suppression systems.

The Contractor shall be an authorized ANSUL stocking distributor of the clean agent system equipment such that immediate replacement parts are available from inventory. The Contractor shall maintain or have access to a carbon dioxide recharging station within 50 miles of Puget Sound Naval Shipyard. The Contractor shall be capable of recharging the carbon dioxide system within 24 hours after a discharge. The Contractor shall be capable of providing emergency service 24 hours a day, 7 days a week.

1.6.7 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, the Government Technical Representative (TPOC) and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. During these meetings, the Contracting Officer will review the Contractor's performance, and the Contractor will share any current challenges. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.8 Contracting Officer Representative (COR):

1.6.9 Government Technical Points of Contact (TPOC): The TPOC monitors all technical aspects of the contract and assists in contract administration. The TPOC is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel.

The TPOC(s) are NOT authorized to change any of the terms and conditions of this contract. If the Contractor believes any Government personnel have effectively issued a change resulting in a change in effort and price/cost of the contract, the Contractor shall immediately notify the Contracting Officer.

Technical Point of Contract (TPOC):

1.6.10 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed. The Contractor shall be required to always wear a NAVSEA green badge.

1.6.11 Organizational Conflict of Interest: Contractor and sub-contractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note:

The only individual who can legally bind the Government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor if that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the people that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE SURVALLIANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of Contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of a product or service shall meet contract requirements.

2.1.11. SUB-CONTRACTOR. One that enters into a contract with a prime Contractor. The Government does not have privity of a contract with the Sub-Contractor.

2.1.12. WORK-DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.13. WORK-WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 IAW In Accordance With KO Contracting Officer NICET National Institute of Certification in Engineering Technologies NFPA National Fire Protection Association OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance

QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES: N/A

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: N/A

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Scheduled Maintenance: The Contractor shall schedule semi-annual, onsite maintenance with the Government representative (TPOC). The Contractor shall provide a lead time of 20 business days to request a system outage accordingly. While onsite, the Contractor shall provide complete inspection and confidence testing of the ANSUL Automatic CO2 Fire Suppression System, which comprises the following sub-components:

1. Detectors

2. Agent release/manual pull stations

3. Audible/visual devices in protected areas

4. CO2 agent storage container and actuator functionality

Tasking includes:

5. Signal verification to monitoring company

6. Inspection of protected areas to determine if any changes occurred

7. Check battery voltage/transfer to standby power, replace battery as required

8. Provide system operations training (as requested for new mechanics) to include CO2 safety issues

5.2 Emergency Trouble Calls: Emergency trouble calls, to include minor material, parts and labor to restore the systems to normal operations IAW the PWS. An emergency trouble call is defined as eight (8) hour service visit, up to 200 dollars of minor materials and repair parts, and associated travel and mobilization costs. Emergency trouble calls shall be coordinated through the Government representative (TPOC). If repairs are completed, Contractor shall provide a service report of repairs completed (see section 5.3 below). If repairs cannot be completed in the eight (8) hour onsite call, Contractor shall provide an Inspection/ Repair Report and Quote

(see Exhibit A below) that includes recommended follow-on repairs and a priced quote that includes labor, material, travel, and all other associated costs.

5.3 Unscheduled Inspection/Repair: Unscheduled inspection and associated repair for faults discovered between service calls. The Government shall request priced quotes during the ordering period for non-emergency repair actions prior to issuing a repair task order. All task orders under this contract for unscheduled repair shall not exceed $20,000 over the ordering period of the contract.

5.4 Service Reports: Service reports shall be submitted to the Government representative (TPOC) within forty-eight (48) hours of visit completion. Service reports shall be submitted manually and/or electronically. Electronic versions may be sent via email. The format shall be Microsoft Word or PDF. The service report shall identify all tests and maintenance performed (if applicable). The service report shall identify/address all applicable NFPA 12 requirements. The service report shall document test results, and the operational status of the system. The service report shall be presented on the Contractor’s letterhead and signed by a company official.

PART 6

APPLICABLE PUBLICATIONS

6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS):

6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

References:

• NFPA 12: Standard on Carbon Dioxide Extinguishing Systems

• NFPA 72: National Fire Alarm and Signaling Code

• 29 CFR 1910: Occupational Safety and Health Standards

• 29 CFR 1915: Occupational Safety and Health Standards for Shipyard Employment

• 29 CFR 1917: Marine Terminals

• 29 CFR 1926: Safety and Health Regulations for Construction

• OSH-II-9: PSNS&IMF Occupational Safety and Health Manual, Volume II. Occupational Safety, Chapter 9: Hazardous Energy Control, Lock Out/Tags Plus (available upon request)

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7. ATTACHMENT/TECHNICAL EXHIBIT LIST:

• Operations & Maintenance Manual, ANSUL Automatic CO2 Fire Suppression System (electronic format available upon request)

TECHNICAL EXHIBIT 1

Performance Requirements Summary

File details come from the government source that posted it. Updated .