A5 PWS - FORKLIFT AND AWP.pdf
PDF 327 KB Posted
- Solicitation number
- N4523A26Q1304
About this file
This Performance Work Statement (PWS) is for an Indefinite Delivery/Indefinite Quantity (IDIQ) contract to provide equipment rental services for forklifts, zoom booms, aerial work platforms (AWPs), and scissor lifts to the Puget Sound Naval Shipyard San Diego Detachment at Naval Air Station North Island. The contract will run from January 5, 2026, to January 4, 2031, with specific requirements for various types of equipment including 60' and 80' telescopic forklifts, 3-ton to 17-ton industrial forklifts, 39-foot scissor lifts, and multiple sizes of aerial work platforms.
The contractor must provide equipment that meets detailed specifications, including specific lifting capacities, fuel types, tire configurations, and safety features. Key responsibilities include delivering equipment in top condition, performing pre-delivery checks, providing maintenance and repair services within 8 hours of notification, replacing units if repairs cannot be completed quickly, and maintaining close communication with the government representative. The contract emphasizes equipment reliability, safety compliance with OSHA and industrial truck standards, and comprehensive documentation of equipment condition and delivery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1 N4523A26Q1403 Solicitation Q and A.pdf | ||
| E17 Attachement B ELIN Pricing Schedule.xlsx | XLSX spreadsheet | |
| Combined Synopsis-Solicitation N4523A26Q1304 Forklift and AWP Rentals.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ PERFORMANCE WORK STATEMENT (PWS)
Forklifts, Zoom Booms, Aerial Work Platforms, and Scissor Lifts Puget Sound Naval Shipyard San Diego Detachment NASNI
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide forklifts, zoom booms and aerial work platforms (AWP). The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the contractor who, in turn, is responsible to the Government.
1.1. Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform use of forklifts, zoom booms and aerial work platforms as defined in this PWS except for those items specified as Government furnished items and support, if any. The contractor shall perform to the standards in this contract.
1.2. Background: In support of material handling operations, as well as supporting work that requires the use of Aerial Work Platforms, Puget Sound Naval Shipyard Detachment San Diego (PSNS Det. S.D.) requires forklifts, Telescopic forklifts and Aerial Work Platforms (herein referred to as AWP) for the movement of materials and to perform work outside of inaccessible areas. Puget Sound Naval Shipyard (PSNS) requires the rental of heavy equipment not normally available at Naval Air Station North Island (NASNI) for PSNS use.
1.3. Scope: The vendor shall provide rental services for the following equipment listed below when requested by the government:
1.3.1. 60' TELESCOPIC FORKLIFT (HIGH REACH) OR EQUIVELENT (i.e. ZOOM BOOM, FORK
LIFT REACH, TELESCOPIC HANDLER, FORKLIFT SHOOTING BOOM, ETC.), DEISEL,
AND SEATBELTS AND 6 FOOT LIFTING ATTACHMENTS (FORKS), RUNNING LIGHTS,
SEATBELTS, BACKUP ALARM, AND PNEUMATIC TIRES.
1.3.2. 60' AWP/JLG W/FOAM FILLED TIRES, WITH (4) LIFTING PADS OR (2) LIFTING PADS AND LUGS (INCLUDING THE LUGS, 2 ea), DIESEL, RUNNING LIGHTS, FOAM FILLED TIRES, TILT SENSOR DISABLED (TO BE ABLE TO PUT ON A BARGE).
1.3.3. 80' AWP/JLG W/FOAM FILLED TIRES, WITH (4) LIFTING PADS OR (2) LIFTING PADS AND
LUGS (INCLUDING THE LUGS, 2 ea), DIESEL, RUNNING LIGHTS, FOAM FILLED TIRES, TILT SENSOR DISABLED (TO BE ABLE TO PUT ON A BARGE).
1.3.4. 125' AWP/JLG W/FOAM FILLED TIRES, WITH (4) LIFTING PADS OR (2) LIFTING PADS AND LUGS (INCLUDING THE LUGS, 2 ea), DIESEL, RUNNING LIGHTS, FOAM FILLED
TIRES, TILT SENSOR DISABLED (TO BE ABLE TO PUT ON A BARGE).
1.3.5. 3-TON (6,000 LB) NET CAPACITY INDUSTRIAL FORKLIFT DEISEL, GAS OR PROPANE
POWERED, RATING CAPACITY: 5,500 LB (MINIMUM) TO 6,500 LB (MAXIMUM); 24 INCH
LOAD CENTER; AUTOMATIC TRANSMISSION, SOLID FOAM FILLED TIRES, MAST
TYPE: 2 OR 3 STAGE, NESTED CHANNEL; MAST EXTENDED HEIGHT: 170” (MINIMUM);
OVERALL WIDTH: 60” (MAXIMUM); FORK LENGTH: 48” (MINIMUM) TO 72”
(MAXIMUM); FORKS SHALL HAVE SIDE SHIFT CAPABILITIES, FUEL TYPE SPECIFIED
BY GOVERNMENT EITHER DEISEL, GAS, PROPANE OR DUAL FUEL GAS/PROPANE;
LIFTING RINGS, PARKING BRAKE: HAND/FOOT OPERATED; LIGHTS: BRAKE, FRONT
AND REAR DRIVE LIGHTS, WORK-LIGHTS; DASH INSTRUMENTS: OIL LEVEL
WARNING, WRENCH WARNING LAMP, THERMOMETER WARNING LAMP, SEAT
WARNING LAMP, SEAT BELT WARNING LAMP, PARKING BRAKE WARNING LAMP,
HOUR METER, TRUCK SPEED, POWER MODE, WHEEL POSITION.
1.3.6. ELECTRIC POWERED: 3-TON (6,000 LB) NET CAPACITY INDUSTRIAL FORKLIFT
INCLUDING CHARGER, RATING CAPACITY: 5,500 LB (MINIMUM) TO 6,500 LB
(MAXIMUM); 25 INCH LOAD CENTER; AUTOMATIC TRANSMISSION, SOLID FOAM
FILLED TIRES, MAST TYPE: 2 OR 3 STAGE, NESTED CHANNEL; MAST EXTENDED
HEIGHT: 170” (MINIMUM); OVERALL WIDTH: 60” (MAXIMUM); FORK LENGTH: 48”
(MINIMUM) TO 72” (MAXIMUM); FORKS SHALL HAVE SIDE SHIFT CAPABILITIES;
POWER: SHALL PROVIDE CHARGING STATION FOR FORKLIFT; PARKING BRAKE:
HAND/FOOT OPERATED; LIGHTS: BRAKE, FRONT AND REAR DRIVE LIGHTS, WORK-
LIGHTS; DASH INSTRUMENTS: OIL LEVEL WARNING, WRENCH WARNING LAMP,
THERMOMETER WARNING LAMP, SEAT WARNING LAMP, SEAT BELT WARNING
LAMP, PARKING BRAKE WARNING LAMP, HOUR METER, TURTLE MODE, TRUCK
SPEED, POWER MODE, WHEEL POSITION AND RUNNING DIRECTION, BDI (BATTERY
DISCHARGE INDICATOR).
1.3.7. 7-TON (14,000 LB) NET CAPACITY INDUSTRIAL FORKLIFT, RATING CAPACITY: 13,000
LB (MINIMUM) TO 16,000 LB (MAXIMUM) ; LOAD CENTER: 24 INCHES; AUTOMATIC
TRANSMISSION, SOLID FOAM FILLED TIRES, MAST TYPE: 2 OR 3 STAGE, NESTED
CHANNEL; LOWERED MAST HEIGHT: 148” (MAXIMUM) MAST EXTENDED HEIGHT:
260” (MINIMUM); FORK LENGTH: 72” PALLET TYPE (VARIATION: 96” PALLET TYPE
WHEN REQUESTED); FORKS SHALL HAVE SIDE-SHIFT CAPABILITY; FORK WIDTH: 6”
(MAXIMUM) FORK THICKNESS: 3” (MAXIMUM); FORK SPREAD: 7” OR LESS FOR
MINIMUM FORK SPREAD (INSIDE EDGE TO EDGE), 72” OR GREATER FOR MAXIMUM
FORK SPREAD (OUTSIDE EDGE TO EDGE); DIESEL FUEL TYPE, PARKING BRAKE:
HAND/FOOT OPERATED; LIGHTS: BRAKE, FRONT AND REAR DRIVE LIGHTS, WORK-
LIGHTS; DASH INSTRUMENTS: OIL LEVEL WARNING, WRENCH WARNING LAMP,
THERMOMETER WARNING LAMP, SEAT WARNING LAMP, SEAT BELT WARNING
LAMP, PARKING BRAKE WARNING LAMP, HOUR METER, TRUCK SPEED, POWER
MODE, WHEEL POSITION.
1.3.8. 10-TON (20,000 LB) NET CAPACITY INDUSTRIAL FORKLIFT, RATING CAPACITY: 19,000
LBS (MINIMUM) TO 25,000 LBS (MAXIMUM); LOAD CENTER: 24 INCHES; AUTOMATIC
TRANSMISSION, SOLID FOAM FILLED TIRES, MAST TYPE: NESTED CHANNELS TO
PROVIDE MAXIMUM VISIBILITY OF THE ATTCHEMENT AND LOAD WITH MINIMAL
OBSTRUCTIONS (I.E. CHANS OR FLEX HOSE); MAST LOWERED HEIGHT: 190”
(MAXIMUM); MAST EXTENDED HEIGHT: 218” (MINIMUM); FORK LENGTH: 96” PALLET
TYPE (VARIATION: 120” PALLET TYPE WHEN REQUESTED); FORKS SHALL HAVE SIDE-
SHIFT CAPABILITY; FORK SPACING: 7” OR LESS MINIMUM FORK SPREAD (INSIDE
EDGE TO INSIDE EDGE), 88” OR GREATER MAXIMUM FORK SPREAD (OUTSIDE EDGE
TO OUTSIDE EDGE); DIESEL FUEL TYPE, PARKING BRAKE: HAND/FOOT OPERATED;
LIGHTS: BRAKE, FRONT AND REAR DRIVE LIGHTS, WORK-LIGHTS; DASH
INSTRUMENTS: OIL LEVEL WARNING, WRENCH WARNING LAMP, THERMOMETER
WARNING LAMP, SEAT WARNING LAMP, SEAT BELT WARNING LAMP, PARKING
BRAKE WARNING LAMP, HOUR METER, TRUCK SPEED, POWER MODE, WHEEL
POSITION.
1.3.9. 17-TON (34,000 LB) NET CAPACITY INDUSTRIAL FORKLIFT, RATING CAPACITY: 33,000
LBS (MINIMUM) TO 36,000 LBS (MAXIMUM), LOAD CENTER: 24 INCHES; AUTOMATIC
TRANSMISSION, SOLID FOAM FILLED TIRES, MAST TYPE: NESTED CHANNELS TO
PROVIDE MAXIMUM VISIBILITY OF THE ATTCHEMENT AND LOAD WITH MINIMAL
OBSTRUCTIONS (I.E. CHANS OR FLEX HOSE); MAST LOWERED HEIGHT: 190”
(MAXIMUM); MAST EXTENDED HEIGHT: 200” (MINIMUM); FORK LENGTH: 96” PALLET
TYPE; FORKS SHALL HAVE SIDE-SHIFT CAPABILITY; FORK SPACING: 10” OR LESS
MINIMUM FORK SPREAD (INSIDE EDGE TO INSIDE EDGE), 94” OR GREATER
MAXIMUM FORK SPREAD (OUTSIDE EDGE TO OUTSIDE EDGE); DIESEL FUEL,
PARKING BRAKE: HAND/FOOT OPERATED; LIGHTS: BRAKE, FRONT AND REAR DRIVE
LIGHTS, WORK-LIGHTS; DASH INSTRUMENTS: OIL LEVEL WARNING, WRENCH
WARNING LAMP, THERMOMETER WARNING LAMP, SEAT WARNING LAMP, SEAT
BELT WARNING LAMP, PARKING BRAKE WARNING LAMP, HOUR METER, TRUCK
SPEED, POWER MODE, WHEEL POSITION.
1.3.10. 39-FOOT INDUSTRIAL SCISSOR LIFTS, RATED PLATFORM HEIGHT: 33 FEET
(MAXIMUM), PLATFORM LENGTH: 13 FEET (MINIMUM), OUTSIDE EXTENSION
CAPABILITY: 17 FEET (MINIMUM), SLIDE-OUT PLATFORM EXTENSION DECK – FRONT:
5 FEET (MINIMUM), SLIDE-OUT PLATFORM EXTENSION DECK – REAR: 4 FEET
(MINIMUM), PLATFORM OCCUPANCY: 7 (MAXIMUM), LIFT CAPACITY: 2,500 LBS.
(MINIMUM), LIFT CAPACITY-EXTENSION DECK: 500 LBS. (MINIMUM), DRIVE HEIGHT:
FULL HEIGHT, TRANSMISSION: AUTOMATIC, TIRES: SOLID (FOAM FILLED) ROUGH
TERRAIN, FUEL: DIESEL, PARKING BRAKE: HAND/FOOT OPERATED; LIGHTS: BRAKE,
FRONT AND REAR DRIVE LIGHTS, WORK-LIGHTS; DASH INSTRUMENTS: OIL LEVEL
WARNING, WRENCH WARNING LAMP, THERMOMETER WARNING LAMP, SEAT
WARNING LAMP, SEAT BELT WARNING LAMP, PARKING BRAKE WARNING LAMP,
HOUR METER, TRUCK SPEED, POWER MODE, WHEEL POSITION.
1.4. Objectives:
The Government objective is to rent forklifts, aerial work platforms, and scissor lifts to support continuing operations performed @ PSNS Detachment San Diego. The vendor shall deliver the equipment listed in paragraph 1.3 when requested by authorized government representative by a task order, accomplish pre-delivery checks, accomplish delivery inspection, provide technical documents listed in paragraph 1.3, and accomplish repairs to equipment. See part 3 (contractor furnished items and services) and part 4 (specific tasks) for additional details.
1.5. Period of Performance: 05 JANRUARY 2026 THRU 04 JANRUARY 2031
1.6. General Information
1.6.1. Quality Assurance: The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.2. Place of Performance: The work to be performed under this contract will be performed at North Island Naval Air Station, San Diego, CA.
1.7. Security
1.7.1. Security Requirements: Contractor personnel performing work under this contract must have base access to Puget Sound Detachment (N35620), Naval Air Station, North Island, Coronado, CA within 15 day after time of contract acceptance and must maintain the level of security required for the life of the contract. The security requirements are in accordance with DD254 – Department of Defense Contract Security Classification Specification. Contractor representative(s) will require base access to Naval Air Station North Island (NASNI) and the Puget Sound Naval Shipyard Controlled Industrial Area (PSNS CIA). Vendor shall notify the COR, fifteen days prior to arriving at site of requested forklifts. To gain access to NASNI contractor needs to complete a SECNAV 5512/1 (APR 2014) form and email to monique.m.mciver@us.navy.mil . For questions about completing the form contact the COR/Sponsor Awstin Saurer @ 360-340-3804 or email as stated above. For access to PSNS CIA contractor representative(s) must show a government issued ID (ex. Valid Driver’s License) and proof of citizenship. Accepted documents for proof of citizenship are listed below.
mailto:monique.m.mciver@us.navy.mil
1.7.2. Contractor shall provide a list of personnel and require all personnel under the contract to maintain current DBID’s access to NASNI and required green contractor badge for access to controlled area of PSNS DET San Diego. Contractor shall have 2 maintenance personnel maintain full access to be able to accomplish any emergent repairs or scheduled maintenance for duration of contract.
1.7.3. Proof of Citizenship accepted documentation
• Birth Certificate (Original or Certified copy with raised seal)
• Valid Passport Booklet or Passport ID
• US State Dept./consular Office Forms FS-545 or DS-1350
• Original US Naturalization Form N-550 or N-561
1.7.3.1. VISITOR CONTROL CENTER LOCATION AND CONTACT INFORMATION
Supervisor Phone: (619) 545-7404
Contractor/Special Events: (619) 545-8871
Access Cards/Fingerprints: (619) 545-7413
Email: nbc_access@navy.mil
Services: Access Control, Visitor Pass, BAVR/NCACS badge issuance. Location:
Building 680, on 4th Avenue (just to the left of the main gate (Gate 1) at Naval Base Coronado)
Hours: Monday through Friday, 0630-1600, closed holidays
1.7.3.2. POINT OF CONTACT. Lawrence Rosenblatt, PSNS & IMF Site Security Officer (Security/EM), lawrence.e.rosenblatt@us.navy.mil (619) 545-1600.
1.7.4. Contracting Officer Representative (COR): The COR will be identified by separate letter. The
COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of Government furnished property, if any; and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.
1.7.5. Key Personnel: The following personnel are considered key personnel by the Government:
Subject Matter Expert (SME)
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 0720-1602, Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. The contractor shall maintain close liaison and good communication with the COR addressing any problems or questions within 24 hours or written or verbal communication.
mailto:nbc_access@navy.mil
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.
When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AWP Aerial Work Platform CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTS Commercial-Off-the-Shelf DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DOD Department of Defense DON Department of the Navy FAR Federal Acquisition Regulation GSO Government Surveillance Officer HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer NASNI Naval Air Station North Island NMCARS Navy Marine Corps Acquisition Regulation Supplement OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase-In/Phase-Out POC Point of Contact PRS Performance Requirements Summary PSNS Puget Sound Naval Shipyard PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program SME Subject Matter Expert TE Technical Exhibit
PART 3
CONTRACTOR FURNISHED ITEMS AND SERVICES
3. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES
3.1. Equipment Furnished. The vendor shall provide rental equipment for the requested items as described in paragraph 1.3. All equipment shall be marked with contractor identification numbers and Equipment Identification Numbers (EIN) per California EPA Air Compliance.
3.2. Equipment Weight. Prior to delivery, equipment shall be weighed and clearly marked with the weight in pounds. OEM (original equipment manufacturer) marked weights are acceptable.
3.3. Lift Points. Equipment shall come with lift attachments points on the front and rear of the machine. Lifting attachment points shall be clearly identified on the equipment or within OEM operating manuals. All lifting attachment points must accommodate standard rigging gear (e.g. shackles, wire rope pendants, etc.).
If the lift requires use of specialized lifting gear or an involved lifting gear arrangement, the special gear and/or a lift arrangement sketch shall be provided to the PSNS & IMF Lifting and Handling Department (Department 700, Code 740) prior to delivery of the equipment for evaluation, approval, and lift planning.
3.4. Location of the lift points shall be symmetrical with respect to the equipment center of gravity and shall be in a common horizontal plane above the center of gravity.
3.5. Attachment points shall be sized based on either pair of diagonally opposed legs of a four-point lifting assembly carrying the entire load for worse case of load distribution with respect to center of gravity.
3.6. The zoom boom draw bar shall not be used as a lift point.
3.7. The working load limit of each lift point shall take into consideration sling angular tension applied to each lift fitting die to minimum allowed sling angle incorporated into the lift design. Optimum sling angle is 60 degrees with respect to horizontal. Sling angles for lift attachments shall not be less than 45 degrees with respect to horizontal.
3.8. Orientation of lift points shall be such that hen loaded the direction of force applied to each sling shall be
+/- 5 degrees within the plane of the lift point (i.e. such as pad-eye or lug).
3.9. Retrofitted, repaired, or modified lifting accessories on these types of machines must comply with section 1926.251(a)(4) of OSHA 29 CFR Part 1926 Subpart H, “Materials Handling, Storage, Use, and Disposal”.
3.10. Condition. Each unit shall be furnished in a safe and operation condition and shall be free of rust, other cosmetic defects, or damage.
3.11. Standards Compliance. The AWP shall meet all Industrial Truck Standard Development Foundation B56 Standards Committee (ITSDF B56 standards) as they establish the safety requirements relating to the elements of design, operation, and maintenance, the standardization relating to principle dimensions to facilitate interchangeability, and establishment of test methods and test procedures, for powered and non-powered industrial trucks.
3.12. Pre-delivery checks. The contractor shall ensure the following prior to delivery:
3.12.1. Provide reliable maintenance free battery (new condition or equivalent performance).
3.12.2. Inspect all hose and belts for cracks, wear, etc. and replace items that are expected to fail within a year.
3.12.3. Change the engine oil or perform an engine oil analysis per 40 CFR 63.6625(i) or (j).
3.12.4. Operationally test the equipment listed in paragraph 1.3.
3.12.5. Ensure the equipment listed in paragraph 1.3 is crane lift ready per the requirements of paragraph 1.4.3.
3.12.6. Ensure the equipment listed in paragraph 1.3 fuel level is full.
3.12.7. Delivery Inspection. At the time of delivery and before acceptance of the equipment listed in paragraph 1.3 or before any maintenance, repair, or replacement of the equipment listed in paragraph 1.3, the contractor and Contracting Officer’s Representative (COR) or other authorized government representative shall jointly inspect and document in writing the condition of the equipment listed in paragraph 1.3 to ensure it meets contract requirements. A signed copy by both parties relating to the inspection and condition of the equipment listed in paragraph 1.3 delivered and accepted by the government shall be retained by both the contractor and the government. Upon completion of the period of performance and at the time of pick-up, or prior to the return of the equipment listed in paragraph 1.3 to the contractor for maintenance, repair, or replacement during the period of performance, the contractor and an authorized government representative shall jointly re-inspect the condition of the equipment and shall note any new conditions or damage on an additional written inspection document signed and retained by both parties. The contractor shall provide the report form to be used to inspect the condition of the equipment listed in paragraph 1.3 at delivery, for maintenance, repair or replacement of the equipment listed in paragraph 1.3, and for return of the equipment listed in paragraph 1.3 at the completion of the task order.
3.13. Technical Documentation. The equipment listed in paragraph 1.3 shall have Operation and Maintenance manual(s), with detailed operating instructions specific for the equipment model provided.
3.14. Scheduled Maintenance. The contractor shall be responsible for scheduled maintenance in accordance with the manufacturer’s maintenance standards that may be required during the period of performance.
The contractor shall describe any required or expected maintenance for the equipment listed in paragraph
1.3 in their proposal and shall also notify the Contracting Officer two days in advance of performing maintenance on the equipment listed in paragraph 1.3. The contractor shall provide a replacement of equipment listed in paragraph 1.3 within 24 hours for any repairs required during the use of the equipment listed in paragraph 1.3. If it is necessary to perform emergent repairs on a government facility, the contractor shall utilize a tag out and/or lockout procedure in order to disable the equipment if an unsafe condition exists. The Contractor shall notify the Contracting Officer or other authorized government representative when equipment is placed in a lockout or tag-out status and when it is removed from a lockout tag-out status.
3.15. Repairs. Provide 24 hours a day, seven days a week on-call repair service during the rental period. The vendor will be responsible for initiating repairs within 8 hours of verbal or written notification that the equipment has malfunctioned. If repairs cannot be done, the vendor shall replace the unit within 24 hours with no additional cost to the government. Location of repairs to be arranged with identified COR.
3.16. Invoicing: Contractor shall maintain up to date billing and submit via WAWF per specific task order.
Contractor shall provide a POC to the COR within 15 days of awarded contract for invoice and billing concerns. Contractor shall utilize WAWF for billing and send notifications to the COR and Contracting Specialist via WAWF or company when new invoices are submitted.
PART 4
SPECIFIC TASKS
4. SPECIFIC TASKS
4.1. Equipment Furnished. The vendor shall provide rental equipment for the requested items as described in paragraph 1.3.
4.2. Equipment Weight. Prior to delivery, equipment shall be weighed and clearly marked with the weight in pounds. OEM (original equipment manufacturer) marked weights are acceptable.
4.3. Lift Points. Equipment shall come with lift attachments points on the front and rear of the machine. Lifting attachment points shall be clearly identified on the equipment or within OEM operating manuals. All lifting attachment points must accommodate standard rigging gear (e.g. shackles, wire rope pendants, etc.).
If the lift requires use of specialized lifting gear or an involved lifting gear arrangement, the special gear and/or a lift arrangement sketch shall be provided to the PSNS & IMF Lifting and Handling Department (Department 700, Code 740) prior to delivery of the equipment for evaluation, approval, and lift planning.
4.4. Location of the lift points shall be symmetrical with respect to the equipment center of gravity and shall be in a common horizontal plane above the center of gravity.
4.5. Attachment points shall be sized based on either pair of diagonally opposed legs of a four-point lifting assembly carrying the entire load for worse case of load distribution with respect to center of gravity.
4.6. The zoom boom draw bar shall not be used as a lift point.
4.7. The working load limit of each lift point shall take into consideration sling angular tension applied to each lift fitting die to minimum allowed sling angle incorporated into the lift design. Optimum sling angle is 60 degrees with respect to horizontal. Sling angles for lift attachments shall not be less than 45 degrees with respect to horizontal.
4.8. Orientation of lift points shall be such that hen loaded the direction of force applied to each sling shall be
+/- 5 degrees within the plane of the lift point (i.e. such as pad-eye or lug).
4.9. Retrofitted, repaired, or modified lifting accessories on these types of machines must comply with section 1926.251(a)(4) of OSHA 29 CFR Part 1926 Subpart H, “Materials Handling, Storage, Use, and Disposal”.
4.10. Condition. Each unit shall be furnished in a safe and operation condition and shall be free of rust, other cosmetic defects, or damage.
4.11. Standards Compliance. The AWP shall meet all Industrial Truck Standard Development Foundation B56 Standards Committee (ITSDF B56 standards) as they establish the safety requirements relating to the elements of design, operation, and maintenance, the standardization relating to principle dimensions to facilitate interchangeability, and establishment of test methods and test procedures, for powered and non-powered industrial trucks.
4.12. Pre-delivery checks. The contractor shall ensure the following prior to delivery:
4.13. Provide reliable maintenance free battery (new condition or equivalent performance).
4.14. Inspect all hose and belts for cracks, wear, etc. and replace items that are expected to fail within a year.
4.15. Change the engine oil or perform an engine oil analysis per 40 CFR 63.6625(i) or (j).
4.16. Operationally test the equipment listed in paragraph 1.3.
4.17. Ensure the equipment listed in paragraph 1.3 is crane lift ready per the requirements of paragraph 1.4.3.
4.18. Ensure the equipment listed in paragraph 1.3 fuel level is full.
4.19. Delivery Inspection. At the time of delivery and before acceptance of the equipment listed in paragraph
1.3 or before any maintenance, repair, or replacement of the equipment listed in paragraph 1.3, the contractor and Contracting Officer’s Representative (COR) or other authorized government representative shall jointly inspect and document in writing the condition of the equipment listed in paragraph 1.3 to ensure it meets contract requirements. A signed copy by both parties relating to the inspection and condition of the equipment listed in paragraph 1.3 delivered and accepted by the government shall be retained by both the contractor and the government. Upon completion of the period of performance and at the time of pick-up, or prior to the return of the equipment listed in paragraph 1.3 to the contractor for maintenance, repair, or replacement during the period of performance, the contractor and an authorized government representative shall jointly re-inspect the condition of the equipment and shall note any new conditions or damage on an additional written inspection document signed and retained by both parties.
The contractor shall provide the report form to be used to inspect the condition of the equipment listed in paragraph 1.3 at delivery, for maintenance, repair or replacement of the equipment listed in paragraph 1.3, and for return of the equipment listed in paragraph 1.3 at the completion of the task order.
4.20. Technical Documentation. The equipment listed in paragraph 1.3 shall have Operation and Maintenance manual(s), with detailed operating instructions specific for the equipment model provided.
4.21. Scheduled Maintenance. The contractor shall be responsible for scheduled maintenance in accordance with the manufacturer’s maintenance standards that may be required during the period of performance.
The contractor shall describe any required or expected maintenance for the equipment listed in paragraph
1.3 in their proposal and shall also notify the Contracting Officer two days in advance of performing maintenance on the equipment listed in paragraph 1.3. The contractor shall provide a replacement of equipment listed in paragraph 1.3 within 24 hours for any repairs required during the use of the equipment listed in paragraph 1.3. If it is necessary to perform emergent repairs on a government facility, the contractor shall utilize a tag out and/or lockout procedure in order to disable the equipment if an unsafe condition exists. The Contractor shall notify the Contracting Officer or other authorized government representative when equipment is placed in a lockout or tag-out status and when it is removed from a lockout tag-out status.
4.22. Repairs. Provide 24 hours a day, seven days a week on-call repair service during the rental period. The vendor will be responsible for initiating repairs within 8 hours of verbal or written notification that the equipment has malfunctioned. If repairs cannot be done, the vendor shall replace the unit within 24 hours with no additional cost to the government. Location of repairs to be arranged with identified COR.
PART 5
APPLICABLE PUBLICATIONS
5. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
5.1. OSHA 29 CFR Part 1926 Subpart H, Section 1926.251(a)(4) – Materials Handling, Storage, Use and
Disposal
5.2. 40 CFR 63.6625(i) or (j) – Code of Federal Regulations: Protection of Environment; Environmental
Protection Agency; What are my monitoring, installation, collection, operation, and maintenance requirements?
PART 6
TECHNICAL EXHIBIT LISTING
6. Technical Exhibit List:
6.1. Technical Exhibit 1 – Performance Requirements Summary
6.2. Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The service required—usually a “shall” statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard,” though this is not typical.)
Method of Surveillance
PRS # 1.
The contractor shall provide services provided such that repaired equipment functions as intended (paragraph 3.1.16).
The contractor provided 100% compliance.
Zero deviation from standard
Contractor shall provide assessment report to the
GSO.
PRS # 2
The contractor shall maintain close liaison and good communication with government (paragraph 1.6.4, 1.6.5).
Any problems or questions encountered by either party are addressed within 24 hours (1 business day)
Provide GSO with written report of discrepancies.
PRS # 3
The contractor shall provide copies of all paperwork, stating the items listed in paragraph 1.3.1 were delivered.
The contractor provided 100% compliance.
Provide GSO all paperwork stating item delivered.
PRS # 4
Contractor shall deliver and pick-up Forklifts and AWPs and provide inspection documents in a timely manner
100% of the services performed and documents submitted
Timely delivery will be tracked by Contracting Officer
PRS # 5
Contractor shall provide Forklift and/or AWP repairs within 8 hours of notification by Government or provide replacement unit in a timely manner
100% of repairs/replacements completed in a timely manner
Contracting Officer will assess compliance with reviews completed monthly
PRS # 6
Contractor shall perform scheduled maintenance of Forklift in a timely manner
100% of scheduled maintenance completed in a timely manner
Contracting Officer will assess compliance with reviews completed monthly
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Paperwork stating item was delivered after requested by authorized government representative.
Once, upon delivery.
1 original and 1 copy
Paper copy or digital copy (i.e. email)
GSO or COR
TECHNICAL EXHIBIT 1
File details come from the government source that posted it. Updated .