C04.0 N4523A23R1055 60DS1602 Attachment J-2 Price Proposal Worksheet.xls

XLS spreadsheet 187 KB Posted

Attached to
Maintenance, Repair, and Preservation of 60DS1602
Solicitation number
N4523A23R1055
Issued by

About this file

This solicitation seeks proposals for maintenance, repair, and preservation services for a 60DS1602 Dive Boat owned by the Department of the Navy. Offerors must have facilities capable of accommodating a 64.5 foot aluminum vessel located in the Puget Sound region of Washington state. Services include haul out and undocking, cleaning and blasting of hull and surfaces, tank and void inspection and preservation, main deck non-skid application, repairs to swim steps, bulkheads and windows, piping and decking replacements, shaft, rudder and propeller inspections, and sea trials upon completion of work. The vessel availability period is April 5, 2023 through June 22, 2023. This is a 100% small business set-aside solicitation under NAICS code 336611 issued by the Naval Supply Systems Command regional maintenance center located at Puget Sound Naval Shipyard. Proposals are due by the date specified in the solicitation, which is available at the provided link.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instruction Sheet

Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet
All yellow fields are to be filled out by the Contractor prior to submittal to The Government.
DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW.
Labor Mix & Rates Sheet
1Enter Company Name and Date
2Fill in each rate in its applicable yellow cell
3Fill in each labor category and ensure all yellow boxes are filled in
a.Example Labor Categories
Shipfitter
Sheetmetal
Welder/Burer
Electrician
Inside Machinist
Outside Machinist
Boilermaker
Pipefitter
Insulator/Lagger
Shipwright/Carpenter
EX/Ord
Painter/Blaster
Rigger/Laborer
QA/NDT
4Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours
5Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate.
Price Proposal Worksheet
1All company and contract information and rates will be autopopulated from previous sheet.
2Fill in each yellow cell with its applicable information
3Anything that is not in yellow is locked, these cells will auto-calculate.
4Before submitting, ensure there are no more bright yellow cells.
IF USING FCCOM
Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission.
Labor Hour Breakdown
1Enter each labor categoy will autofill from the "labor Mix & Rates" sheet
2Fill in each Regular and Overtime hour for each labor category and line item.

Labor Mix & Rates

Contractor/Company Name:
Project/Vessel Name:60DS1602 Dive BoatDate:
Base Rates:Regular Labor$0.00FringeOverheadG&AProfitFCCOM
Labor Mix and Rates
Labor CategoryRegular HoursOvertime HoursTotal Category HoursTotal Regular $/hourTotal Overtime $/hourTotal Category Dollars
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
0$0.00
Column Totals000$0.00$0.00$0.00
Direct Labor Rate Per Hour0

Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT

Price Proposal Worksheet

Contractor/Company Name:0
Project/Vessel Name:60DS1602 Dive BoatDate:12/31/99
Base Rates:Labor$0.00Fringe0.00%Overhead0.00%G&A0.00%Profit0.00%FCCOM0.00
Base Work Package Proposal
PARAGRAPH No.TITLEPRIMESUBCONTRACTOROther Direct Cost (ODC)*PRIMELine Item Total
M/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOM
1.4Arrival ConferenceArrival Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.5Required DocumentsRequired Documents$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.6Progress MeetingsProgress Meetings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.7Availability RequirementsAvailability Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.8Care of VesselCare of Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.11Condition Found ReportsCFR Reports$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.13Safety RequirementsSafety Requirements$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQEPreservation OQE$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.17Environmental/Hazwaste ManagementEnvironmental/Hazwaste Management$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.22Gas FreeGas Free$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
1.23General Requirements for TestingDevelop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & EquipmentPersonnel & Equipment$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.2Docking ProcedureDocking Procedures$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking PlanBlocking Plan$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.4Crib & Brace Blocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning BlocksSetting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.7Docking ConferenceDocking Conference$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.8Docking the VesselDocking the Vessel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.9Post DockingPost Docking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.10Undocking the VesselUndocking$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.1.12Final Docking ReportFinal Docking Report$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and MarkingsIdentify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber FendersRubber Fenders$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting and PreservationHull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.5Hull & FB Visual InspectionHull & FB Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.2.6Hull & FB U/T InspectionHull & FB U/T Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.1Forward Push Bar$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.2Swim Step Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.3.3Repair D-Fender Corrosion$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanksOpen, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/ Void Visual InspectionTank/ Void Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.3Preliminary Air TestIdentify Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.4Clean/Flush/Disinfect Potable Water SystemTank/Gusset Weld Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.7Certification of Potable Water Piping/TanksTank/Void Blast & Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.9Tank/Void Closeout Insp.$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.4.10On-Load Fuel$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.5.3Repair Port Forward Chalk$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.1Main Cabin/Pilot House Exterior Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.2Main Deck Cabin Window Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.3Pilot House Port/Starboard/Aft Gasket Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.4Pilot House Visual Inspection$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.5False Bulkhead Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.6.6Main Cabin Expansion Joint Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.1Waterborne Shaft Position$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.2Shaft Removals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.3Inspections for Wear & Defects$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.4Propulsion Shaft Assembly Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.5Shaft Reassembly$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.7.6System Operation Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.1Bow Thruster Swing Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.2Steering Removals$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.3Steering Repair$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.4Steering Reassembly$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.5Rudder Swing Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.8.6System Operational Test$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.9.1Galley Deck Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.9.4Diver Prep Room Deck Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.9.5Water Closet and Shower Area Deck Preservation$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.11Piping Repairs$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
3.13Dock and Sea Trials$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Option Item Proposal Package
PARAGRAPH No.TITLEM/HLabor CostMATERIAL PRICETOTALLabor CostMaterial CostTOTALODCTravel ODCTOTALFringeOverheadG&AProfitFCCOMLine Item Total
0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Column Totals00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Option Items (O):$0.00
TOTAL PROPOSED PRICE:$0.00

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

Labor Hour Breakdown

Contractor/Company Name:0
Project/Vessel Name:60DS1602 Dive BoatDate:12/31/99
Base Rates:Regular Labor Rate$0.00
NameRateTotal CostNameRateTotal Cost
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Regular HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
1.4Arrival Conference00$0.00
1.5Required Documents00$0.00
1.6Progress Meetings00$0.00
1.7Availability Requirements00$0.00
0000$0.00
1.8Care of Vessel00$0.00
1.11Condition Found Reports00$0.00
1.13Safety Requirements00$0.00
1.16.1Preservation OQE00$0.00
1.17Environmental/Hazwaste Management00$0.00
1.22Gas Free00$0.00
1.23General Requirements for Testing00$0.00
3.1.1Personnel & Equipment00$0.00
3.1.2Docking Procedure00$0.00
3.1.3Blocking Plan00$0.00
3.1.5Setting and Aligning Blocks00$0.00
3.1.7Docking Conference00$0.00
3.1.8Docking the Vessel00$0.00
3.1.9Post Docking00$0.00
3.1.10Undocking the Vessel00$0.00
3.1.12Final Docking Report00$0.00
3.2.1Identify Distinguishing Figures and Markings00$0.00
3.2.2Rubber Fenders00$0.00
0000$0.00
3.2.4Hull Blasting and Preservation00$0.00
3.2.5Hull & FB Visual Inspection00$0.00
3.2.6Hull & FB U/T Inspection00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks00$0.00
3.4.2Tank/ Void Visual Inspection00$0.00
3.4.3Preliminary Air Test00$0.00
3.4.4Clean/Flush/Disinfect Potable Water System00$0.00
3.4.7Certification of Potable Water Piping/Tanks00$0.00
3.4.8Final Air Test00$0.00
0000$0.00
0000$0.00
3.4.9Tank/Void Closeout Insp.00$0.00
3.5.1Main Deck Non-Skid Repair00$0.00
3.5.2Main Deck Visual Inspection00$0.00
3.5.3Repair Port Forward Chalk00$0.00
3.6.1Main Cabin/Pilot House Exterior Preservation00$0.00
3.6.2Main Deck Cabin Window Repair00$0.00
3.6.3Pilot House Port/Starboard/Aft Gasket Repairs00$0.00
3.6.4Pilot House Visual Inspection00$0.00
3.6.5False Bulkhead Repair00$0.00
3.6.6Main Cabin Expansion Joint Repair00$0.00
3.7.1Waterborne Shaft Position00$0.00
3.7.2Shaft Removals00$0.00
3.7.3Inspections for Wear & Defects00$0.00
3.7.4Propulsion Shaft Assembly Repairs00$0.00
3.7.5Shaft Reassembly00$0.00
3.7.6System Operation Test00$0.00
3.8.1Bow Thruster Swing Test00$0.00
3.8.2Steering Removals00$0.00
3.8.3Steering Repair00$0.00
3.8.4Steering Reassembly00$0.00
3.8.5Rudder Swing Test00$0.00
3.8.6System Operational Test00$0.00
3.9.1Galley Deck Preservation00$0.00
3.9.4Diver Prep Room Deck Preservation00$0.00
3.9.5Water Closet and Shower Area Deck Preservation00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
$0.00$0.000$0.00$0.00
Column Totals00000000000000000000000000000000000000$0.00
Base Work Package$0.00
OPTION YEAR TABLE IF NEEDED:
Labor Hour Breakdown
PARAGRAPH No.TITLELabor CategoriesTotal Overall Labor Cost
000000000000000000Total Direct HoursTotal Overtime Hours
REGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOTREGOT
0000$0.00
0000$0.00
0000$0.00
0000$0.00
Column Totals00000000000000000000000000000000000000$0.00
Total Option Items (O):$0.00
TOTAL DIRECT LABOR COSTS BY WORK ITEM$0.00

File details come from the government source that posted it. Updated .