C04.0 N4523A23R1055 60DS1602 Attachment J-2 Price Proposal Worksheet.xls
XLS spreadsheet 187 KB Posted
- Solicitation number
- N4523A23R1055
About this file
This solicitation seeks proposals for maintenance, repair, and preservation services for a 60DS1602 Dive Boat owned by the Department of the Navy. Offerors must have facilities capable of accommodating a 64.5 foot aluminum vessel located in the Puget Sound region of Washington state. Services include haul out and undocking, cleaning and blasting of hull and surfaces, tank and void inspection and preservation, main deck non-skid application, repairs to swim steps, bulkheads and windows, piping and decking replacements, shaft, rudder and propeller inspections, and sea trials upon completion of work. The vessel availability period is April 5, 2023 through June 22, 2023. This is a 100% small business set-aside solicitation under NAICS code 336611 issued by the Naval Supply Systems Command regional maintenance center located at Puget Sound Naval Shipyard. Proposals are due by the date specified in the solicitation, which is available at the provided link.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instruction Sheet
| Instructions for Contractors for Filling-out J-2 Price Proposal Worksheet | ||
| All yellow fields are to be filled out by the Contractor prior to submittal to The Government. | ||
| DO NOT FILL IN ANY CELL THAT IS NOT BRIGHT YELLOW. | ||
| Labor Mix & Rates Sheet | ||
| 1 | Enter Company Name and Date | |
| 2 | Fill in each rate in its applicable yellow cell | |
| 3 | Fill in each labor category and ensure all yellow boxes are filled in | |
| a. | Example Labor Categories | |
| Shipfitter | ||
| Sheetmetal | ||
| Welder/Burer | ||
| Electrician | ||
| Inside Machinist | ||
| Outside Machinist | ||
| Boilermaker | ||
| Pipefitter | ||
| Insulator/Lagger | ||
| Shipwright/Carpenter | ||
| EX/Ord | ||
| Painter/Blaster | ||
| Rigger/Laborer | ||
| QA/NDT | ||
| 4 | Next, fill in each yellow cell for Regular Labor Hours and Overtime Labor Hours | |
| 5 | Your Total Direct Labor Rate Per Hour will autopopulate in each sheet. All other rates entered will also auto populate. | |
| Price Proposal Worksheet | ||
| 1 | All company and contract information and rates will be autopopulated from previous sheet. | |
| 2 | Fill in each yellow cell with its applicable information | |
| 3 | Anything that is not in yellow is locked, these cells will auto-calculate. | |
| 4 | Before submitting, ensure there are no more bright yellow cells. | |
| IF USING FCCOM | ||
| Facilities Capital Cost of Money (FCCOM) is not required. If you are not inputting FCCOM please enter N/A in all cells. However, if your company is inputting FCCOM, it needs to be calculated based on the proper CASB-CMF form. Please include the CASB-CMF form with your submission. | ||
| Labor Hour Breakdown | ||
| 1 | Enter each labor categoy will autofill from the "labor Mix & Rates" sheet | |
| 2 | Fill in each Regular and Overtime hour for each labor category and line item. |
Labor Mix & Rates
| Contractor/Company Name: | |||||||||
| Project/Vessel Name: | 60DS1602 Dive Boat | Date: | |||||||
| Base Rates: | Regular Labor | $0.00 | Fringe | Overhead | G&A | Profit | FCCOM | ||
| Labor Mix and Rates | |||||||||
| Labor Category | Regular Hours | Overtime Hours | Total Category Hours | Total Regular $/hour | Total Overtime $/hour | Total Category Dollars | |||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| 0 | $0.00 | ||||||||
| Column Totals | 0 | 0 | 0 | $0.00 | $0.00 | $0.00 | |||
| Direct Labor Rate Per Hour | 0 |
Example Labor Categories Shipfitter Sheetmetal Welder/Burer Electrician Inside Machinist Outside Machinist Boilermaker Pipefitter Insulator/Lagger Shipwright/Carpenter EX/Ord Painter/Blaster Rigger/Laborer QA/NDT
Price Proposal Worksheet
| Contractor/Company Name: | 0 | |||||||||||||||||
| Project/Vessel Name: | 60DS1602 Dive Boat | Date: | 12/31/99 | |||||||||||||||
| Base Rates: | Labor | $0.00 | Fringe | 0.00% | Overhead | 0.00% | G&A | 0.00% | Profit | 0.00% | FCCOM | 0.00 | ||||||
| Base Work Package Proposal | ||||||||||||||||||
| PARAGRAPH No. | TITLE | PRIME | SUBCONTRACTOR | Other Direct Cost (ODC)* | PRIME | Line Item Total | ||||||||||||
| M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | ||||
| 1.4 | Arrival Conference | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.5 | Required Documents | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.6 | Progress Meetings | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.7 | Availability Requirements | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.8 | Care of Vessel | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.11 | Condition Found Reports | CFR Reports | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.13 | Safety Requirements | Safety Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.16.1 | Preservation OQE | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.17 | Environmental/Hazwaste Management | Environmental/Hazwaste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.22 | Gas Free | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.23 | General Requirements for Testing | Develop & Maintain Test Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.1 | Personnel & Equipment | Personnel & Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.2 | Docking Procedure | Docking Procedures | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.3 | Blocking Plan | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.4 | Crib & Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.1.5 | Setting and Aligning Blocks | Setting and Aligning Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.7 | Docking Conference | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.8 | Docking the Vessel | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.9 | Post Docking | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.10 | Undocking the Vessel | Undocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.12 | Final Docking Report | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.1 | Identify Distinguishing Figures and Markings | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.2 | Rubber Fenders | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.3 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.2.4 | Hull Blasting and Preservation | Hull Blasting and Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.5 | Hull & FB Visual Inspection | Hull & FB Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.6 | Hull & FB U/T Inspection | Hull & FB U/T Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.1 | Forward Push Bar | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.2 | Swim Step Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.3.3 | Repair D-Fender Corrosion | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas Free, Close all tanks | Open, Pump, Clean, Vent, Gas Free, Close all tanks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.2 | Tank/ Void Visual Inspection | Tank/ Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.3 | Preliminary Air Test | Identify Color Schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.4 | Clean/Flush/Disinfect Potable Water System | Tank/Gusset Weld Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.7 | Certification of Potable Water Piping/Tanks | Tank/Void Blast & Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.8 | Final Air Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.9 | Tank/Void Closeout Insp. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.4.10 | On-Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.1 | Main Deck Non-Skid Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.2 | Main Deck Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.5.3 | Repair Port Forward Chalk | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.1 | Main Cabin/Pilot House Exterior Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.2 | Main Deck Cabin Window Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.3 | Pilot House Port/Starboard/Aft Gasket Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.4 | Pilot House Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.5 | False Bulkhead Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.6.6 | Main Cabin Expansion Joint Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.1 | Waterborne Shaft Position | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.2 | Shaft Removals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.3 | Inspections for Wear & Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.4 | Propulsion Shaft Assembly Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.5 | Shaft Reassembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.7.6 | System Operation Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.1 | Bow Thruster Swing Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.2 | Steering Removals | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.3 | Steering Repair | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.4 | Steering Reassembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.5 | Rudder Swing Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.8.6 | System Operational Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.9.1 | Galley Deck Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.9.4 | Diver Prep Room Deck Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.9.5 | Water Closet and Shower Area Deck Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.11 | Piping Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| 3.13 | Dock and Sea Trials | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Base Work Package | $0.00 | |||||||||||||||||
| OPTION YEAR TABLE IF NEEDED: | ||||||||||||||||||
| Option Item Proposal Package | ||||||||||||||||||
| PARAGRAPH No. | TITLE | M/H | Labor Cost | MATERIAL PRICE | TOTAL | Labor Cost | Material Cost | TOTAL | ODC | Travel ODC | TOTAL | Fringe | Overhead | G&A | Profit | FCCOM | Line Item Total | |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||||
| Column Totals | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||
| Total Option Items (O): | $0.00 | |||||||||||||||||
| TOTAL PROPOSED PRICE: | $0.00 |
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
Labor Hour Breakdown
| Contractor/Company Name: | 0 | |||||||||||||||||||||||||||||||||||||||
| Project/Vessel Name: | 60DS1602 Dive Boat | Date: | 12/31/99 | |||||||||||||||||||||||||||||||||||||
| Base Rates: | Regular Labor Rate | $0.00 | ||||||||||||||||||||||||||||||||||||||
| Name | Rate | Total Cost | Name | Rate | Total Cost | |||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Regular Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 1.4 | Arrival Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.5 | Required Documents | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.6 | Progress Meetings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.7 | Availability Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.8 | Care of Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.11 | Condition Found Reports | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.13 | Safety Requirements | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.16.1 | Preservation OQE | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.17 | Environmental/Hazwaste Management | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.22 | Gas Free | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 1.23 | General Requirements for Testing | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.1 | Personnel & Equipment | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.2 | Docking Procedure | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.3 | Blocking Plan | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.5 | Setting and Aligning Blocks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.7 | Docking Conference | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.8 | Docking the Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.9 | Post Docking | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.10 | Undocking the Vessel | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.1.12 | Final Docking Report | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.1 | Identify Distinguishing Figures and Markings | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.2 | Rubber Fenders | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.4 | Hull Blasting and Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.5 | Hull & FB Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.2.6 | Hull & FB U/T Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas Free, Close all tanks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.2 | Tank/ Void Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.3 | Preliminary Air Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.4 | Clean/Flush/Disinfect Potable Water System | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.7 | Certification of Potable Water Piping/Tanks | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.8 | Final Air Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.4.9 | Tank/Void Closeout Insp. | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.5.1 | Main Deck Non-Skid Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.5.2 | Main Deck Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.5.3 | Repair Port Forward Chalk | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.1 | Main Cabin/Pilot House Exterior Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.2 | Main Deck Cabin Window Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.3 | Pilot House Port/Starboard/Aft Gasket Repairs | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.4 | Pilot House Visual Inspection | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.5 | False Bulkhead Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.6.6 | Main Cabin Expansion Joint Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.1 | Waterborne Shaft Position | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.2 | Shaft Removals | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.3 | Inspections for Wear & Defects | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.4 | Propulsion Shaft Assembly Repairs | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.5 | Shaft Reassembly | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.7.6 | System Operation Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.1 | Bow Thruster Swing Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.2 | Steering Removals | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.3 | Steering Repair | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.4 | Steering Reassembly | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.5 | Rudder Swing Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.8.6 | System Operational Test | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.9.1 | Galley Deck Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.9.4 | Diver Prep Room Deck Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 3.9.5 | Water Closet and Shower Area Deck Preservation | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Base Work Package | $0.00 | |||||||||||||||||||||||||||||||||||||||
| OPTION YEAR TABLE IF NEEDED: | ||||||||||||||||||||||||||||||||||||||||
| Labor Hour Breakdown | ||||||||||||||||||||||||||||||||||||||||
| PARAGRAPH No. | TITLE | Labor Categories | Total Overall Labor Cost | |||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | Total Direct Hours | Total Overtime Hours | |||||||||||||||||||||
| REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | REG | OT | |||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | $0.00 | ||||||||||||||||||||||||||||||||||||
| Column Totals | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0.00 | |
| Total Option Items (O): | $0.00 | |||||||||||||||||||||||||||||||||||||||
| TOTAL DIRECT LABOR COSTS BY WORK ITEM | $0.00 |
File details come from the government source that posted it. Updated .