C09.0 N4523A23R1054 UFDD-132 & UFDD-133 Solicitation Amendment 0001.pdf

PDF 445 KB Posted

Attached to
UFDD-132 and UFDD-133
Solicitation number
N4523A23R1054
Issued by

About this file

This amendment to a solicitation modifies the request for proposal for maintenance, repair, and preservation of two Deep Draft Utility Floats. The amendment removes an instruction attachment and adds a reference attachment. The proposal due date remains unchanged at 12:00 PM PT on January 19, 2023. The amendment also removes a ship check requirement due to scheduling conflicts. Photos of the vessels will be provided electronically instead upon request. The solicitation seeks a stand-alone firm-fixed-price contract with the Naval Supply Systems Command and Regional Maintenance Center at Puget Sound Naval Shipyard to accomplish preservation work on the two 56-foot steel floats, located in the Puget Sound, Washington region. The period of performance is from April 3 to June 30, 2023. Offerors must be small businesses and registered in the System for Award Management.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PURPOSE: The purpose of this amendment is to update Section J to remove Attachment J-7 BAVR Instructions and to add Attachment J-8 References. It is also to update Section L to remove Ship Check due to scheduling conflict.

SCHEDULE: The proposal due date and time remains unchanged at 12:00 PM PT, 19 January 2022.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Jan-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N4523A23R1054

X 9B. DATED (SEE ITEM 11)

08-Dec-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Jan-2023

CODE

PUGET SOUND NAVAL SHIPYARD CODE 400

1400 FARRAGUT AVE, MAIL STOP 2026

BREMERTON WA 98314-2026

N4523A 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4523A23R1054

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The below Table of Contents has been added

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

The following have been modified:

LIST OF ATTACHMENTS

Any contract awarded as a result of this solicitation shall consist of the following sections of this solicitation, and the documents, exhibits, and attachments described below:

Part I The Schedule (Sections A through H) Part II Contract Clauses (Section I) Part III List of Documents, Exhibits and other Attachments (Section J) Part IV Representations and Instructions (Sections K through M)

Part IV of the solicitation will not be physically incorporated into the resulting contract. However, Section K, “Representations, Certifications and Other Statements of Offerors” will be retained in the contract file and acceptance of a proposal under this solicitation incorporates Section K by reference into the resultant contract (FAR 15.204-1(b)).

The following is a list of attachments to the Request for Proposal (RFP). Attachments J-1, J-2 and Exhibits A and B will be incorporated into the contract along with all references listed in section two (2) of the Statement of Work (SOW), digital copies of which are available upon contractor request. Attachments J-3 through J-7 are included for the purposes of the solicitation, but will not be incorporated into the resulting contract. Additionally, the contractor shall be responsible for the latest revisions of all references, specifications and standards in effect at time of proposal closing.

Number Title Number of Pages

Dated

Attachment J-1 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-1 Statement of Work

45 20 Oct 2022

Attachment J-2 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-2 Price Proposal Worksheet

1 File N/A

Attachment J-3 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-3 RFC Form

1 N/A

Attachment J-4 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-4 Past Performance

2 N/A

Attachment J-5 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-5 Corporate Experience

6 N/A

Attachment J-6 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-6 Drawings and References

N/A N/A

Attachment J-7 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-7 BAVR Instructions

1 N/A

Attachment J-8 N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Attachment J-8 References

3 N/A

Exhibit A N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Exhibit A CDRLs and DIDs

N/A Various

Exhibit B N4523A23R1054 UFDD-132 & UFDD-133 C04.0 Exhibit B GFP Attachment

1 13 Dec 2022

NOTE 1:

"Attachment” means any documentation, appended to a contract or incorporated by reference, which does not establish a requirement for deliverables.

"Exhibit” means a document, referred to in a contract, which is attached and establishes requirements for variables.

SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

A. General:

1. Offerors shall submit their proposals in accordance with the following instructions:

2. Offerors’ proposals must comply with requirements set forth in Section L and Section M of this solicitation. Offerors shall assume that the Government has no prior knowledge of their facilities and experience and will base its evaluation on the information presented in the offeror’s proposal.

3. If an offeror believes that the requirements in these instructions contain an error, omission or are otherwise unsound, the offeror should notify the Government as soon as possible.

4. Relationship between Instructions and Evaluation: Your attention is directed to the functional relationship between Section L, Instructions to Offerors and Section M, Evaluation Criteria of this solicitation. Section L provides the proposal submission instructions and detailed proposal content requirements. Section M provides the evaluation factors for award.

5. ALL INQUIRIES shall be made via email and directed to Jeff Jaeckel, Contract Specialist, and Brittany

Chartier, Contracting Officer, at jeff.a.jaeckel.civ@us.navy.mil brittany.n.chartier.civ@us.navy.mil . To ensure the Government is able to adequately address and respond to offeror requests for clarification (RFCs) via amendment if applicable, it is requested questions be submitted no later than 11 January 2023 at 12:00 PM Pacific Time (PT). The government reserves the right to not answer any questions received after 11 January 2023 at 12:00 PM PST. Furthermore, offerors should note that the proposal due date will not be extended solely on the basis of questions received. RFCs shall reference the solicitation and specification page and paragraph number and be submitted on a request for clarification form (Attachment J-3) provided with this solicitation. A request for clarification form (Attachment J-3) shall be submitted for each separate question.

B. Proposal Submission Instructions:

1. Time of Submission: Proposals are DUE NO LATER THAN 12:00 PM PT, 19 January 2023. Late proposals will not be considered. Late submissions shall be handled in accordance with FAR 52.215-1, INSTRUCTIONS TO OFFERS –COMPETITIVE ACQUISITION (JAN 2004) reference subparagraphs (c)(3)(ii)(A) and (1), and FAR 15.208. It is the Offeror's responsibility to ensure their proposal is received by the Contracting Officer on or before the specified closing date and time.

2. Electronic Delivery of Proposals: Delivery submissions shall only be accepted electronically. Offeror’s must submit electronic copy of their proposal in accordance with Table 1 below. Proposals shall be submitted via https://piee.eb.mil

Table 1- Required Submission Process

Transmission Process Complete action by Point of Contact Email POC’s request clarifications or questions.

Questions and Clarifications must be submitted no later than 11 January 2023 at 12:00 PM Pacific Time (PT).

Include both POC’s in ALL Electronic communications.

Jeff Jaeckel jeff.a.jaeckel.civ@us.navy.mil Brittany Chartier brittany.n.chartier.civ@us.navy.mil POC will post responses. No later than 16 January

2023 at 12:00 PM Pacific Time (PT).

Upload Proposals No later than 19 January 2023 at 12:00 PM Pacific Time (PT).

3. For an Electronic copies of each volume shall be submitted through the Solicitation Module of the Procurement Integrated Enterprise Environment (PIEE) suite at https://piee.eb.mil/. Proposals submitted by mail or hand-carried will not be evaluated. Proposals sent through proprietary or third party File Transfer Protocol (FTP) sites or DoD SAFE will not be retrieved. It is the responsibility of the Offeror to confirm receipt of proposals. All proposals received after the exact time specified for receipt shall be treated as late submissions and will not be considered except under facts and circumstances allowed by the Federal Acquisition Regulation (FAR). For instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf.

It is the Offeror’s responsibility to obtain written confirmation of receipt of all electronic files of the full proposal by the Contracting office. In the event that the Solicitation Module is down, the alternate method for proposal submission is via email to: jeff.a.jaeckel.civ@us.navy.mil and brittany.n.chartier.civ@us.navy.mil ONLY. The Offeror must obtain prior approval from the Contracting Officer to use the alternate submission method. Offeror’s are responsible for ensuring electronic copies are virus-free and shall run an anti-virus scan before submission.

For an electronic document to be considered as part of the proposal, it must be uploaded prior to the closing deadline. Electronic files not uploaded prior to the closing deadline will not be considered as part of the proposal. If any portion of the uploaded proposal is unreadable or contains corrupted files, re-submission of such portions shall be handled IAW FAR 15.207(c). IAW FAR 15.208(b)(1)(i), it is highly recommended that Offeror’s upload their proposal to https://piee.eb.mil/ at least twenty-four (24) hours prior to the solicitation deadline as well as read and become familiar with the PIEE solicitation module located at https://pieetraining.eb.mil/wbt/sol/Posting Offer.pdf

Proposals submitted via to https://piee.eb.mil/ tool may be downloaded by the Government for evaluation once the solicitation closes.

4. Electronic File Format: Proposals shall only be submitted in the following formats:

.docx for Microsoft® Word files .xlsx for Microsoft® Excel files .pdf for Adobe® Acrobat™ files

Offerors shall not embed sound or video files into submittals. Graphics, tables, photographs, and other data beyond the capability of Microsoft® Word ™, Microsoft® Excel ™, or not in currently NMCI- supported applications may be submitted in Adobe Acrobat format. Any submission document that requires a “wet signatures” or other data input by hand shall be scanned and formatted in Adobe Acrobat (PDF).

All spreadsheets shall be in Microsoft Excel format such that each mathematical equation is obvious. No fields shall be password protected.

5. Proposal Layout and Page Limitations: Proposals shall be organized into the following layout. At a minimum, each section as outlined below shall constitute a separate file.

Table 2- Page Layout

Volume

Section Title E-file

Page Limitations

I Factor 1:

Technical

Capabilities

I Technical Proposal, Sub-factor 1.1 Corporate Experience

1 file: Sections I, II & III

No Page Limitation

II

Technical Proposal, Sub-factor 1.2 Certifications

No Page Limitation

III

Technical Proposal, Sub-factor 1.3 Facilities

II

Factor 2:

Past Performance

I Past Performance

1 file

III

Factor 3:

Price Offer

I Cover Letter 1 file 4

II

Completed Solicitation and Applicable Amendments 1 file

No Page Limitation

III Price Proposal Worksheet Attachment J-2 1 file (.xlsx)

Completed J-2

Attachment

a. Text size shall be no smaller than what is equivalent to Microsoft Word, Times New Roman, 10 point, uncompressed font.

b. Pages shall be single sided, one and one half inch spaced, with a minimum of one inch margins on all sides. Pages shall be dated and numbered sequentially by volume. A header should be present in each volume submission stating the volume number, title, solicitation identification, and the offeror's name.

c. Each volume shall contain a glossary of all abbreviations and acronyms used with an explanation for each.

d. Elaborate format and/or color representations are not desirable. Any pages that are changed (as the result of negotiations) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page and/or circling if changing data in a chart.

The offeror shall indicate the new date on revised pages.

e. Legible tables, charts, graphs and figures shall be used when necessary to depict organizations, systems and layout, implementation schedules, plans, etc. These displays shall be uncomplicated, legible, and shall not exceed 11 by 17 inches in size. For tables, charts, graphs, and figures, the text shall be no smaller than 8 point, Times New Roman.

6. Ship Check Requirements: There will not be a ship check for this requirement. Photos will be provided upon request in Attachment J-8 References.

To request the photos, send email with subject line “N4523A23R1054 UFDD-132 & UFDD-133 J-8 References ” to Jeff Jaeckel jeff.a.jaeckel.civ@us.navy.mil , or Brittany Chartier brittany.n.chartier.civ@us.navy.mil .

Photos will be sent back to requester via DoD SAFE.

7. Subcontract Information: In requesting proposals from prospective subcontractors, offerors should provide all necessary information for the contemplated purchase. The Government will not advise prospective subcontractors as to the requirements of their transactions with offerors, nor will the Government respond to direct inquiries from prospective subcontractors concerning clarifications of specification or solicitation requirements. ALL SUCH REQUESTS FOR CLARIFICATION MUST BE SUBMITTED TO THE

GOVERNMENT THROUGH THE PRIME CONTRACTOR (OFFEROR).

8. Subcontract Information: Offerors may request SOW reference file (Attachment J-6) access and/or picture file access electronically via an email request to jeff.a.jaeckel.civ@us.navy.mil and brittany.n.chartier.civ@us.navy.mil.

9. Government Property Management Plan: The awardee is required to have an adequate Property

Management System in place that demonstrates protective internal controls when Government Furnished Property is in its possession. The offeror shall submit an explanation of their property management system to the Government with its proposal. The property management system submittal must demonstrate an adequate property management system that meets the ten (10) elements in FAR clause 52.245-1(f). The Government will evaluate the property management plan submitted to determine whether it is compliant with FAR clause 52.245-1(f). Offerors are cautioned that submission of this information is required to be responsive to this solicitation.

If the Government determines there are inadequate property management internal controls in place to meet the ten elements of FAR clause 52.245-1(f), the awardee of the contract will be notified by the Contracting Officer that it will have 45 days from award to submit a corrective action plan to meet the ten (10) elements of FAR clause 52.245-1(f). The corrective action plan must include a timeline for implementation of the plan.

C. Detailed Proposal Content Requirements:

1. VOLUME I – FACTOR 1: Technical Capabilities

a. Organization: Volume I shall be organized conforming to the requirements of Table 2 above.

Volume I shall be clearly labeled. At a minimum, each section as outlined below shall constitute a separate file. Volume I shall not include pricing information.

Table 3- Technical Submission Requirements Submission Requirements Section I: Subfactor 1.1, Corporate Experience:

Offerors are required to provide Corporate Experience Data Sheets (Attachment J-5) on three (3) recently completed projects (not to exceed) five (5) years older than date of solicitation that demonstrate relevant work as outlined in subfactor 1.1 of Section M of the solicitation.

Narratives provided on the data sheet must be clear, coherent, and prepared in sufficient detail for effective evaluation of the offeror’s proposal against sub-factor 1.1.

Offeror’s shall include complete contract numbers, to include specific delivery/task order numbers as applicable, within the narrative provided on the data sheet to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing non-government corporate experience, offeror’s shall include an associated point of contact with the customer company which includes: name, company title, phone number, and email to allow for government verification.

Offerors may submit corporate experience from identified subcontractors. Corporate experience submissions from a subcontractor must be accompanied by a signed letter of commitment from the identified subcontractor, indicating their commitment to work with the offeror on the project.

Section II: Subfactor 1.2, Certifications:

The offeror shall provide copies of current certifications for at least one paint inspector that meets at least one of the requirements outlined in evaluation subfactor 1.2. In order for a certificate to be considered current, the certificate must not expire prior to the first day of the period of performance as designated in Section F of the Solicitation.

Section III: Subfactor 1.3, Facility:

The offeror shall provide a narrative that describes how they meet the requirements of evaluation subfactor 1.3.

Narratives provided must be clear, coherent, and prepared in sufficient detail for effective evaluation. Any supporting documentation included should clearly substantiate claims and be verifiable.

2. VOLUME II- FACTOR 2: Past Performance

a. Organization: Volume II shall be organized conforming to the required proposal content. Volume II shall not include pricing information.

The Past Performance volume shall be organized in the following manner:

Contractor Performance Data Sheet (Attachment J-4)

Table 4- Past Performance Submission Requirements

Submission Requirements Offerors are required to provide Contract Performance Data Sheets (Attachment J-4) on one (1) of the offeror’s recently completed projects (not to exceed) five years since completion) as a prime contractor that demonstrates relevant work in accordance with evaluation factor 2. Substituted Contract Performance Data Sheet (Attachment J-4) will not be evaluated. Offerors may submit performance data regarding current contract performance as long as a minimum of one year of performance has been completed as of the closing date of this RFP.

Supporting documentation should clearly substantiate claims and be verifiable.

Offeror’s shall include complete contract numbers, to include specific delivery/task order numbers as applicable, within the narrative to allow for the verification of claims. However, copies of contracts referenced are not required as part of the proposal.

If referencing non-government past performance, ensure that the Contract Performance Data Sheets list a current customer point of contact with name, company title, phone number, and email included for government verification.

Past performance information may be obtained from established systems such as the Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases. Past performance information may also be obtained from other sources available to the Government, such as the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, Fee Determining Officials.

Offeror’s are not required to submit any additional documentation in support of this evaluation criterion.

3. VOLUME III – FACTOR 3: PRICE OFFER

a. Organization: Volume III shall be organized as outlined below. Volume III shall be clearly labeled.

At a minimum, each section shall constitute a separate file.

Section I Cover Letter

Section II Completed solicitation and amendments

Section III Completed price proposal worksheet, Attachments J-2

1) Section I, Cover Letter: A cover letter that addresses all the requirements of the “first page of the proposal” outlined in FAR 52.215-1(c)(2)(i-v). In addition to those requirements, the offeror shall include the following in the cover letter:

Identification of all separate files included in the proposal package, CAGE and Data Universal Numbering System (DUNS) numbers for the prime contractor, Notice of any alterations to the solicitation or attachments/exhibits (except for completing appropriate “fill-in” blocks and certifications).

Period for acceptance of offers. The offeror agrees to hold the prices in its offer for

90 calendar days from the date specified for receipt of offers, unless another time period is specified in an amendment to the solicitation.

2) The completed SF 33 with blocks 12 through 18 completed, as well as all sections with applicable “fill-ins” filled in and shall acknowledge all amendments (block 14). Block 12 must match the 90 days specified in the provided cover letter. The representative who signs this form must be authorized to contractually bind the company providing the offer. Section B CLIN pricing must also be completed for CLIN 0001 and CLIN 0003 and be equal to the total price of the price proposal worksheet. CLIN 0002, CLIN 0004, and CLIN 0005 are unpriced CLINs. The Offeror shall complete and provide all Representations, Certifications, and Other Statements included in section K of the solicitation. Submission of a signed offer to the Government constitutes agreement and acceptance of the terms and conditions of the solicitation.

3) Complete the price proposal worksheet, Attachment J-2 of the Solicitation. Labor rates, Fringe rate, Overhead rate, G&A rate, FCCOM, and Profit rate used to calculate for the overall price of the base contract award shall be the basis for pricing all modifications under this contract.

b. Notification/Exceptions: The proper completion and submission to the Government of the above items will constitute an offer. Unless this solicitation expressly authorizes alternate offers with respect to specific terms and conditions of this solicitation, any exception to any of the terms and conditions shall constitute a deficiency, which may make the offer unacceptable.

c. Release of Pricing Information: All pricing information submitted is for the exclusive use of

Government representatives, and will be treated as business confidential and will not be publicly disclosed, provided that, where a request for disclosure of such cost information is submitted to the Government pursuant to the Freedom of Information Act (FOIA) (5 U.S.C. 552a), the Government will not disclose the offeror’s pricing information if public disclosure of such information would substantially harm the offeror in its competitive position. In order to help ensure non-disclosure, the title page of the cost proposal and other sheets of proposal data should be marked with a restrictive legend stating that the price information is proprietary.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .