This document provides answers to questions about solicitation N4523A23Q5739 from the Department of the Navy Naval Supply Systems Command for the procurement of four three-ton bridge cranes for PSNS IMF Bremerton WA. The answers clarify requirements for a crossover walkway on all four cranes, confirm the need for a built-up hoist design rather than a package or serial hoist, and note revisions made to the statement of work addressing broken links and walkway surfaces.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
01 September 2023 Questions and Answers:
Question 1:
1. There appears to be a broken link in at least two places and maybe a missing figure.
*Dimensions are approximate. Final values shall be verified by the Contractor per section
Error! Reference source not found.CRANE REQUIREMENTS
Answer 1:
Broken link is 1.6.3.1. Statement of Work has been updated. See C08.0 Attachment 1 –
Statement of Work REV 1SEP2023.
Question 2:
Please confirm you would like a fully-decked 3 ton top-riding hoist.
2.2.8.4.1 The trolley frame shall be a one-piece structural steel weldment. Open areas of the trolley frame deck, except rope openings, shall have walking surfaces of slip-resistant type.
Answer 2:
SOW Section 2.2.8.4.1 has been revised: 2.2.8.4.1 The trolley frame shall be a one-piece structural steel weldment. Open areas of the trolley frame deck, except rope openings, shall have walking surfaces of slip-resistant type.
See C08.0 Attachment 1 – Statement of Work REV 1SEP2023.
Question 3:
Section 2.2.8.6 mentions the crossover walkway several times “if possible” or “if able”. Can you confirm for which cranes the crossover walkway is a requirement?
Answer 3:
Crossover walkway is required for all four cranes.
Question 4:
Please confirm the intention to procure a built-up hoist instead of a package or serial hoist.
Answer 4:
Built-up is required four all four cranes.