C09.0 Amendment 0001 - Questions and Answers.pdf

PDF 107 KB Posted

Attached to
(4) three-ton bridge cranes for PSNS IMF Bremerton WA
Solicitation number
N4523A23Q5739
Issued by

About this file

This document provides answers to questions about solicitation N4523A23Q5739 from the Department of the Navy Naval Supply Systems Command for the procurement of four three-ton bridge cranes for PSNS IMF Bremerton WA. The answers clarify requirements for a crossover walkway on all four cranes, confirm the need for a built-up hoist design rather than a package or serial hoist, and note revisions made to the statement of work addressing broken links and walkway surfaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 September 2023 Questions and Answers:

Question 1:

1. There appears to be a broken link in at least two places and maybe a missing figure.

*Dimensions are approximate. Final values shall be verified by the Contractor per section

Error! Reference source not found.CRANE REQUIREMENTS

Answer 1:

Broken link is 1.6.3.1. Statement of Work has been updated. See C08.0 Attachment 1 –

Statement of Work REV 1SEP2023.

Question 2:

Please confirm you would like a fully-decked 3 ton top-riding hoist.

2.2.8.4.1 The trolley frame shall be a one-piece structural steel weldment. Open areas of the trolley frame deck, except rope openings, shall have walking surfaces of slip-resistant type.

Answer 2:

SOW Section 2.2.8.4.1 has been revised: 2.2.8.4.1 The trolley frame shall be a one-piece structural steel weldment. Open areas of the trolley frame deck, except rope openings, shall have walking surfaces of slip-resistant type.

See C08.0 Attachment 1 – Statement of Work REV 1SEP2023.

Question 3:

Section 2.2.8.6 mentions the crossover walkway several times “if possible” or “if able”. Can you confirm for which cranes the crossover walkway is a requirement?

Answer 3:

Crossover walkway is required for all four cranes.

Question 4:

Please confirm the intention to procure a built-up hoist instead of a package or serial hoist.

Answer 4:

Built-up is required four all four cranes.