This document provides details for a solicitation to perform docking and maintenance work on the IX-550 Tank Barge. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to accomplish maintenance, repair, and preservation on the IX-550, including blasting and preserving the exterior hull, replacing hull zinc anodes, cleaning and preserving cargo tanks and voids, replacing steel fenders and skegs, and conducting visual and ultrasonic testing. The period of performance is from August 1, 2022 through October 31, 2022. This is a total small business set-aside under NAICS code 336611 with a small business size standard of 1,250 employees. The government intends to award a firm-fixed-price, stand-alone contract in June 2022 to the responsible contractor on a lowest price, technically acceptable basis.

View the file

Other files

File Type Posted
C04.0 Attachment J-1 N4523A22R1051 IX-550 SOW_Errata 2.pdf PDF
C09.0 Amendment 0004 - N4523A22R1051 IX-550.pdf PDF
C09.0 Government Response to RFC 006 N4523A22R1051 IX-550.pdf PDF
C09.0 Amendment 0003 - N4523A22R1051 IX-550.pdf PDF
C04.0 Attachment J-1 N4523A22R1051 IX-550 SOW_Errata 1.pdf PDF
C09.0 Amendment 0002 - N4523A22R1051 IX-550.pdf PDF
C09.0 Government Response to RFC 002-005 N4523A22R1051 IX-550.pdf PDF
C09.0 Attachment J-7 BAVR Instructions IX-550 N4523A22R1051.pdf PDF
C09.0 Attachment J-4 Past Performance IX-550 N4523A22R1051_Revised 29Apr2022.docx DOCX document
C09.0 Amendment 0001 - N4523A22R1051 IX-550.pdf PDF
C04.0 Attachment J-1 N4523A22R1051 IX-550 SOW.pdf PDF
C09.0 Attachment J-2 IX-550 Price Proposal Worksheet_Revised 27Apr2022.xls XLS spreadsheet
C04.0 Exhibit A CDRL's and DID's Request IX-550 N4523A22R1051.pdf PDF
C04.0 Attachment J-2 IX-550 Price Proposal Worksheet.xls XLS spreadsheet
C04.0 Exhibit B GFPN4523A22R1051_1.pdf PDF
C04.0 Attachment J-7 Contractor Badging and Access Requirements Solicitation.docx DOCX document
C04.0 Attachment J-6 References and Drawings IX-550 N4523A22R1051.pdf PDF
C04.0 Attachment J-3 RFC Form IX-550 N4523A22R1051.docx DOCX document
C04.0 Solicitation IX-550 N4523A22R1051.pdf PDF
C04.0 Attachment J-4 Past Performance IX-550 N4523A22R1051.docx DOCX document
C04.0 Attachment J-5 Corporate Experience IX-550 N4523A22R1051.docx DOCX document
C04.0 Attachment J-1 N4523A22R1051 IX-550 SOW.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government Responses to RFC 001

1) Question: The statement of work and the bid sheet do not match each other. Example in the statement of work it lists 3.2.3 Steel Half Pipe Fenders, on the bid sheet 3.2.3 is Zinc Anodes. There is no Steel Half Pipe Fenders on the bid sheet. There are numerous other issues between these two documents.

Response: Please see the revised J-2 Attachment Price Proposal Worksheet.