J_12_Request_for_Clarification_RFC McCain_Combined_Redacted.pdf

PDF 482 KB Posted

Attached to
USS MCCAIN (DDG-56) 3A1 CONTINUOUS MAINTENANCE AVAILABILITY (CMAV) Federal contract opportunity
Solicitation number
N4523A22R0556
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This solicitation requests proposals for the USS McCain (DDG-56) 3A1 Continuous Maintenance Availability (CMAV). The work includes completion of items in Attachment J-1. The contract will be awarded as a firm-fixed price and is set aside 100% for small businesses under NAICS code 336611 with a size standard of 1,250 employees. The period of performance is from October 31, 2022 to November 25, 2022. Offerors must have an existing Master Ship Repair Agreement or Agreement for Boat Repair and be registered in the System for Award Management. Requests for clarification are due by August 24, 2022 and proposals by September 19, 2022. The solicitation is issued by the Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility detachment in Everett, Washington for the Department of the Navy Naval Supply Systems Command.

View the file

Other files for this federal contract opportunity

Other files attached to USS MCCAIN (DDG-56) 3A1 CONTINUOUS MAINTENANCE AVAILABILITY (CMAV), newest first.
File Type Posted
C 04.0 RFP N4523A22R0556.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 24 Aug 2022

REQUIREMENT:

ITEM NO: 150-11-002

TITLE: Superstructure Bulkhead; repair

QUESTION NO:

REQUISITION NO.:

TPPC-DDG56-NWRMC23-S001

ISSUING OFFICE POC (CODE 440.13):

Contract Specialist Name (360) 900-8904 angela.charpia@navy.mil

PARA. NO: 1.3.1.1 PAGE NO: _1_____ CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

The work item and drawing associated call out HSLA specification number, HSLA 60. Request clarification as to specification to use. The 248 Rev recognizes HSLA spec number MIL-S-24645 as the current authorized spec for this.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: J. Deschamp SERIAL NO:

Government concurs with KTR clarification request. ERRATA will be issued for changing 2.2 to the current revision.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

FOR PROPOSAL.

DATE OF REQUEST: 24 AUG 2022 QUESTION NO:

REQUIREMENT: SHIP CHECK REQUISITION NO.:

TPPC-DDG56-NWRMC23-S001

ITEM NO: All Work Items

TITLE: MCCAIN 3A1 CMAV

ISSUING OFFICE POC (CODE 440.13):

Contract Specialist Name (360) 900-8904 angela.charpia@navy mil

PARA. NO: PAGE NO: ______ CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

Contractor requests SHIPCHECK date and time to properly assess all work items included in the upcoming McCain 3A1 CMAV.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: J. Deschamp SERIAL NO:

Ship check is not available for the next several weeks until 2nd week of October.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST

DATE OF REQUEST: 24 Aug 2022

REQUIREMENT:

ITEM NO: 122-21-002

TITLE: Structural Bulkhead; repair

QUESTION NO:

REQUISITION NO.:

TPPC-DDG56-NWRMC23-S001

ISSUING OFFICE POC (CODE 440.13):

Contract Specialist Name (360) 900-8904 angela.charpia@navy.mil

PARA. NO: 1.3.1 PAGE NO: _1_____ CONTRACTOR:

PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION:

The detail called out in paragraph 1.3.1 does not show plate PL101 as stated in work item, instead shows PL100. Need to clarify if detail called out is correct for work identified to be completed under this work item and/or if contractor is being tasked to install thicker plate outside of drawing specifications.

DO NOT WRITE BELOW THIS LINE

SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N

TECHNICAL REVIEW: J. Deschamp SERIAL NO:

After technical analysis, government concurs with KTR clarification. ERRATA will be created to make an admin change to the work item to the correct plate stated in 5-3-4E of 2.2.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING

OFFICE POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST