This document summarizes a federal solicitation for maintenance, repair, and preservation services for the SSN-21 Logistic Escape Truck Kit 1. The Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility intends to award a firm-fixed-price contract to retrieve LET houses, cofferdams, and associated equipment from Trident Refit Facility - Bangor in Silverdale, Washington; deliver the equipment to the contractor's Puget Sound, Washington region facility for work including blasting, preserving, modifying, installing new components, and adjusting doors; then return the equipment to TRF Bangor. The period of performance is scheduled from May 14, 2020 to July 14, 2020. The solicitation anticipates setting aside the procurement for HUBZone small businesses under NAICS code 336611 with a size standard of 1,250 employees on a lowest-price technically acceptable basis. Offerors must register in the System for Award Management to be eligible for award.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR CLARIFICATION
ATTACHMENT J-6
DATE OF REQUEST:
REQUIREMENT: SSN-21 LET Kit 1
ITEM NO:
TITLE:
PARA. NO: PAGE NO:
PLANNER’S NAME: ATTACH. NO:
QUESTION NO: 001
SOLICITATION NO.: N4523A20R1057
ISSUING OFFICE POC: Brian Fergus
PHONE: (360) 476-4071
EMAIL: brian.fergus@navy.mil
CONTRACTOR:
CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO: 001
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
Please see revised 5-way breakout to follow.
See file"C04.2a - Attachment J-2 - SSN-21 LET KIT 1 - 5-way Breakout V2.xls"
4/7/2020
J-2
It appears that the 5-way Breakout doesn't reflect items 3.10.9 or 3.10.10 in the SOW.
Can the Government provide a revised 5-way breakout or advise what work item contractor should include this under?
5-way Breakout