C04.2a - Attachment J-2 - SSN-21 LET KIT 1 - 5-way Breakout V2.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- N4523A20R1057
About this file
This solicitation is for a firm-fixed-price contract to provide maintenance, repair, and preservation services for equipment comprising the SSN-21 Logistic Escape Truck (LET) Kit 1. The contractor will be required to retrieve LET houses, cofferdams, and associated equipment from the Trident Refit Facility in Silverdale, Washington; perform blast preservation, apply non-skid coatings, install electrical power modifications and door components, and modify cofferdams; and return the equipment. The period of performance is from May 14 to July 14, 2020. The procurement is set aside for HUBZone small businesses located in the Puget Sound region of Washington state. The Navy intends to make award by April 2020 on a lowest-price technically acceptable basis. Offerors must register in the System for Award Management to be eligible for award.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SSN-21 LET Kit 1 V2
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||
| Project = | Project: SSN-21 LET Kit 1 | DATE: = | |||
| PRIME | SUBCONTRACTOR | PRIME | |||
| Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A | PRIME |
Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | |
| Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material Price | Labor Cost | Material Cost | TOTAL |
Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7 | Availability Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.7.1 | Transport Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.8 | Care of Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.11 | Condition Found/Inspection Discrepancy Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.16.1 | Preservation OQE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.17 | Environmental and Hazardous Waste Management | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.21 | Integrated Logistics Support | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 1.23 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3 | Structural Repairs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.1 thru 3.3.2 | Identify Distinguishing Figures & Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.3 thru 3.3.6 | Vent Access Panels | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.7 thru 3.3.10 | Doors | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.11 | Sliding Door Rain Guard | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.12 | Side Wall Panel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.13 thru 3.3.16. | Sliding Door Hangers and Door Trucks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.17 | Upper Deck Hatch Door handles | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.18 thru 3.3.19 | New Rubber Upper Deck Hatch Doors | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.20 thru 3.3.21 | Fabricate install Latch Clip | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.22 | Davit Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.22.1 thru 3.3.22.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.22.3 | Modify detail 5-7A (Capacitiy) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.23 | Davit Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.23.1 thru 3.3.23.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.23.3 | Modify detail 5-7A (Capacitiy) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.24 | Handrails and Upper Deck Safety Rails | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.25 | Deck Safety Rail | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.26 thru 3.3.27 | Upper Deck Swing Gate | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.28 | Incline Ladder | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.28.1 thru 3.3.28.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.29 | Incline Steps and Platform | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.29.1 thru 3.3.29.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.30 | Incline Steps and Platform | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.30.1 thru 3.3.30.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.31 | Ladder Assembly | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.31.1 thru 3.3.31.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.32 | Blast and Preserve FWD House | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.33 | Blast and Preserve AFT House | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.34 thru 3.3.35 | Label Houses | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.36 thru 3.3.7 | Repair Bow in Deck Add Stiffeners | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.38 thru 3.3.39 | Weld Seal Upper Deck Plating | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.40 thru 3.3.41 | New Service Line Opening | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.42 thru 3.3.45 | New Door Guides | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.46 thru 3.3.49 | Door Stops | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.50 thru 3.3.51 | Hose Rack Tabs | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.52 | Exterior Ladder | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.52.1 thru 3.3.52.2 | Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.53 thru 3.3.54 | Label Ladders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.55 thru 3.3.56 | New Rubber | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.57 thru 3.3.58 | Blast and Preserve Cofferdam | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.3.59 thru 3.3.60 | Label Cofferdams | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.1 thru 3.10.4 | Elecrical Access Panels | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.5 thru 3.10.6 | Install Electric | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.7 thru 3.10.8 | Eletrical: Test insulation and continuity. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.10.9 thru 3.10.10 | Electrical Op testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| 3.12 thru 3.12.4 | Weight Handling Systems Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Column Totals | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
Scope (SOW/PWS) Labor Rate/MH: 0 G&A Rate: 0.00% Profit Rate: 0.00%
Total Bid: $0.00
&"Arial,Bold"&KFF0000SSN-21 LET KIT 1
J-2 ATTACHMENT V2
********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it. Updated .