C04.0 Attachment J-2 N4523A20R1055 YC-1526 Price Proposal Worksheet.xls

XLS spreadsheet 60 KB Posted

Attached to
YC-1526 Maintenance, Preservation, and Repair
Solicitation number
N4523A20R1055
Issued by

About this file

This document contains a price proposal worksheet and related federal contract opportunity notice for maintenance, preservation, and repair services for a YC-1526 Yard Craft Barge. The price proposal worksheet is a template for contractors to provide pricing details for labor, materials, overhead, and profit across various tasks required by the opportunity notice. These tasks include docking and undocking the vessel, hull blasting and preservation, tank cleaning and testing, non-skid deck coating, and equipment removals and replacements. The federal contract opportunity notice provides additional details on the vessel specifications and period of performance from March to May 2020. The solicitation number is N4523A20R1055 and will be awarded by the Department of the Navy Naval Supply Systems Command as a lowest-price technically acceptable, firm-fixed-price contract. The pre-solicitation notice is released for information purposes only.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YC-1526

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-1526DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/ Hazwaste Management$0.00$0.00$0.00$0.00$0.00
1.2Gas Free$0.00$0.00$0.00$0.00$0.00
1.21Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking$0.00$0.00$0.00$0.00$0.00
3.2.1Indentify Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc's Replacement$0.00$0.00$0.00$0.00$0.00
3.2.4Rubber fenders$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard U/T Inspection$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Indentfy Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Pre-Lim Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover provide/ Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch repairs$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.9Tank Close-out Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid Preservation$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00
3.5.4Handrail Removals$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.

File details come from the government source that posted it. Updated .