Attachment J-2-A N4523A20R1054 YC-1591 Price Proposal Worksheets.xls

XLS spreadsheet 58 KB Posted

Attached to
YC-1591 & YC-1571 Maintenance
Solicitation number
N4523A20R1054
Issued by

About this file

This document includes a price proposal worksheet template and details for a federal contract solicitation. The solicitation is for maintenance, repair, and preservation services for two yard craft barges, YC-1591 and YC-1571, owned by the Department of the Navy. The contractor will be required to transport each vessel to their facility, clean and preserve the hull and tanks, undertake visual and ultrasound inspections, replace components as needed, and return the vessels to the government location. The period of performance is from March 17, 2020 to May 27, 2020. Offerors must be registered in the System for Award Management to be eligible for award. Drawings of the vessels will be available for request starting January 2, 2020. The solicitation was released by the Regional Maintenance Center at Puget Sound Naval Shipyard and Intermediate Maintenance Facility.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YC-1591

INSERT CONTRACTOR/COMPANY NAME HERE
Project =YC-1591DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALLabor CostMaterial CostTOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR Reports$0.00$0.00$0.00$0.00$0.00
1.13Safety Requirements$0.00$0.00$0.00$0.00$0.00
1.16.1Preservation OQE$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/ Hazwaste Management$0.00$0.00$0.00$0.00$0.00
1.2Gas Free$0.00$0.00$0.00$0.00$0.00
1.21Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel & Equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedures$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Aligning Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking$0.00$0.00$0.00$0.00$0.00
3.2.1Indentify Distinguishing Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Steel Half Pipe Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc's Replacement$0.00$0.00$0.00$0.00$0.00
3.2.4Rubber fenders$0.00$0.00$0.00$0.00$0.00
3.2.5Hull Blasting and Preservation$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard U/T Inspection$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Vent, Gas Free, Close all tanks$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Indentfy Color Schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Pre-Lim Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Access Cover provide/ Preservation$0.00$0.00$0.00$0.00$0.00
3.4.7Watertight Hatch repairs$0.00$0.00$0.00$0.00$0.00
3.4.8Final Air Test$0.00$0.00$0.00$0.00$0.00
3.4.9Tank Close-out Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-skid Preservation$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck U/T Inspection$0.00$0.00$0.00$0.00$0.00
3.5.4Handrail Removals$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:
Total Bid:$0.00

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* =MH*Labor Rate*G&A =(Prime Material Price+Subcontractor Total)*Profit Rate =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit) =(MH*Labor Rate)+Material Price =Sub Cost (F) *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.