REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 5/28/2019 QUESTION NO: 002
REQUIREMENT: REQUISITION NO.: N4523A19R1056
ITEM NO:
TITLE:
ISSUING OFFICE POC (CODE 440.22):
Brittany Chartier: (360) 476-6438 brittany.chartier@navy.mil
PARA. NO: PAGE NO: CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Sections 1.21 through 1.23 do not align between the J-1_SOW and J-2 5-way_break_Out.
DO NOT WRITE BELOW THIS LINE
SPEC CHG: Y/N DWG/REF CHG. Y/N RQMTS CHG: Y/N MAT'L CHG: Y/N
TECHNICAL REVIEW: SERIAL NO:
Please be advised the Paragraph 1.21 is Gas Free but was incorrectly labeled 1.22 on the provided J-2a and J-2b attachments (UFDD 45& UFDD 46 5 way break outs.) Paragraph 1.22 is Develop and Maintain Test Plan but was incorrectly labeled 1.23 on the provided J-2a and J-2b attachments (UFDD 45& UFDD 46 5 way break outs.) Paragraph 1.23 is labeled Request for Contract Change in the Attachment J-1 SOW and is not included as a priced line item in the J-2 attachments.
The J-2 attachments will remain as is and offerors should price the work items in accordance the clarification provided above.
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.