Attachment_J-2b_UFDD_46_5-way_break_out.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Maintenance, Preservation, and Repair of UFDD 45 & UFDD 46
Solicitation number
N4523A19R1056
Issued by

About this file

Attachment J-2b UFDD 46 5 way break out

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =UFDD 46DATE: =
PRIMESUBCONTRACTORPRIME
Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&APRIME

Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate

PARAGRAPH No.TITLEM/HMATERIAL PRICETOTAL
Carney, Sean R CIV PSNS&IMF, Code 411: =(MH*Labor Rate)+Material PriceLabor CostMaterial CostTOTAL

Carney, Sean R CIV PSNS&IMF, Code 411: =Sub Cost (F)

Carney, Sean R CIV PSNS&IMF, Code 411: =MH*Labor Rate*G&A Carney, Sean R CIV PSNS&IMF, Code 411: =(Prime Material Price+Subcontractor Total)*Profit Rate Other Direct Cost (ODC)* G&A PROFIT Line Item Total Carney, Sean R CIV PSNS&IMF, Code 411: =SUM(Prime Total+Subcontractor Total+ODC+G&A+Profit)

1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availability Requirements$0.00$0.00$0.00$0.00$0.00
1.7.1Transport Vessel$0.00$0.00$0.00$0.00$0.00
1.7.2Provide Office Space$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11CFR$0.00$0.00$0.00$0.00$0.00
1.16Maintain Preservation OQE Records$0.00$0.00$0.00$0.00$0.00
1.17Enviromental/Hazwaste management$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00
1.23Develop & Maintain Test Plan$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.7Dock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undock the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1I.D. Distuinguished Figures & Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.3Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.4Hull Blasting & Preservation$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Hull and Freeboar UT Inspection$0.00$0.00$0.00$0.00$0.00
3.2.7UT Accomplish 25 sites as designated$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate, and Gas Free$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identifie Color Scemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Preliminary Air Test$0.00$0.00$0.00$0.00$0.00
3.4.5Tank/Void touch Up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.6Blast and Preserve Void Access Covers$0.00$0.00$0.00$0.00$0.00
3.4.7Final Air test$0.00$0.00$0.00$0.00$0.00
3.4.8Tank/Void closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Non-Skid Repair$0.00$0.00$0.00$0.00$0.00
3.5.2Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.3Ultrasonic Test (UT) Inspection$0.00$0.00$0.00$0.00$0.00
3.5.4UT Accomplish 20 sites as designated$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A RateProfit Rate:$0.00
Total Proposed Price

********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor rates and Profit rates used to calculate for the overall price of the base contract award shall be the basis for pricing on all modifications under this contract.