Attachment_J-2_Price_Proposal_Worksheet_IX-536.xls
XLS spreadsheet 55 KB Posted
- Attached to
- Maintenance, Repair and Preservation of IX-536
- Solicitation number
- N4523A18R1076
About this file
Attachment J-2, Price Proposal Worksheet IX-536
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFC5_Response.doc | DOC document | |
| RFC4_Response.doc | DOC document | |
| N4523A18R1076_SolicitationDrawings.zipx | ZIPX file | |
| RFC3_Response.pdf | ||
| RFC2_Response.pdf | ||
| RFC1_Response.pdf | ||
| Attachment_J-3_Request_for_Clarification_Form.doc | DOC document | |
| N4523A18R1076_IX-536.pdf | ||
| Attachment_J-4_Contract_Performance_Data_Sheet.docx | DOCX document | |
| Exhibit_A_-_CDRLs_and_DIDs_Combined_IX-536.pdf | ||
| Attachment_J-1_Statement_of_Work_IX-536_dated_9MAY2018.pdf | ||
| Attachment_J-7_BAVR_Instructions.docx | DOCX document | |
| Attachment_J-5_Corporate_Experience_Data_Sheet.docx | DOCX document | |
| Attachment_J-6_GFP_Attachment.pdf | ||
| IX-536_Draft_SOW.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
vessel name
| INSERT CONTRACTOR/COMPANY NAME HERE | ||||||||||||
| Project = | IX-536 | DATE: = | ||||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | |||||||||
| PARAGRAPH No. | TITLE | M/H | MATERIAL PRICE | TOTAL | M/H | LABOR PRICE | MATERIAL PRICE | TOTAL | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.5 | Required Documents | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.6 | Progress Meetings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.7 | Availibility Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.8 | Care of Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.11 | Condition Found Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.17 | Environmental and Hazardous Waste Mgt. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.19 | Weight Control | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.22 | Gas Free | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.23 | General Requirements for Testing | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 1.24 | Compartment Arrival / Closeout Inspections | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.1 | Personnel and equipment | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.2 | Docking Procedure | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.3 | Blocking Plan | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.4 | Crib and Brace Blocking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.5 | Setting and Alignment of Docking Blocks | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.6 | Docking Conference | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.7 | Docking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.8 | Post Docking | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.9 | Undocking the Vessel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.1.11 | Final Docking Report | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.1 | Identify Distinguishing Figures and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.2 | Square Tube Stock Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.3 | Rubber Fenders | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.4 | Zinc Anodes | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.6 | Identify color schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.2.7 | Hull and Freeboard Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.3.1 | Toe Board Install | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.1 | Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.2 | Tank/Void Visual Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.3 | Identify color schemes and Markings | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.4 | Tank/Void Touch-Up Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.5 | Blast and Preserve Access covers | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.6 | Install Missing Tank Access Cover Fasteners | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.7 | Tank Closeout Inspection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.4.8 | On-Load Fuel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.1 | Main Deck Surface Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.2 | Main Deck Track Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.3 | Main Deck Non-skid Repair (Option Item) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.4 | Visual Inspection for Structural Defects | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.5 | Stanchion Test | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.6 | Stanchion Deck Sockets | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.7 | Threaded Deck Inserts Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.8 | Threaded Deck Inserts Modification | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.5.9 | Weld Brackets to Main Deck | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.6.1 | Workshop Exterior and Generator Foundation Preservation | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.6.2 | Mount Fire Hose Reel | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.6.3 | Forward Deck House Tower Removal | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.10.1 | Shore Power Connection | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| 3.12.1 | Dual Bridge Crane Maintenance | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Column Totals | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Scope (SOW/PWS) | Labor Rate/MH: | G&A Rate: | Profit Rate: | $0.00 | ||||||||
| CLIN 0001 Price | ||||||||||||
| $0.00 | ||||||||||||
| CLIN 0003 Price | ||||||||||||
| $0.00 | ||||||||||||
| Total Evaluated Price: |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********
=C(XXX)*D61*F61
=(D(XXX)+I(XXX))*I61
=SUM(E(XXX)+I(XXX)+J(XXX)+K(XXX)+L(XXX))
=C(XXX)*D61+D(XXX)
=G(XXX)+H(XXX)
*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.
NOTE: Labor Rate/Manhour, G&A Rate, and Profit Rates (Row 61) are used to calculate the overall price of the base contract award and shall be the basis for pricing on all modifications under this contract.
File details come from the government source that posted it.