Attachment J-2, Price Proposal Worksheet IX-536

View the file

Other files

File Type Posted
RFC5_Response.doc DOC document
RFC4_Response.doc DOC document
N4523A18R1076_SolicitationDrawings.zipx ZIPX file
RFC3_Response.pdf PDF
RFC2_Response.pdf PDF
RFC1_Response.pdf PDF
Attachment_J-3_Request_for_Clarification_Form.doc DOC document
N4523A18R1076_IX-536.pdf PDF
Attachment_J-4_Contract_Performance_Data_Sheet.docx DOCX document
Exhibit_A_-_CDRLs_and_DIDs_Combined_IX-536.pdf PDF
Attachment_J-1_Statement_of_Work_IX-536_dated_9MAY2018.pdf PDF
Attachment_J-7_BAVR_Instructions.docx DOCX document
Attachment_J-5_Corporate_Experience_Data_Sheet.docx DOCX document
Attachment_J-6_GFP_Attachment.pdf PDF
IX-536_Draft_SOW.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

vessel name

INSERT CONTRACTOR/COMPANY NAME HERE
Project =IX-536DATE: =
PRIMESUBCONTRACTORPRIMEPRIME
PARAGRAPH No.TITLEM/HMATERIAL PRICETOTALM/HLABOR PRICEMATERIAL PRICETOTALOther Direct Cost (ODC)*G&APROFITLine Item Total
1.4Arrival Conference$0.00$0.00$0.00$0.00$0.00
1.5Required Documents$0.00$0.00$0.00$0.00$0.00
1.6Progress Meetings$0.00$0.00$0.00$0.00$0.00
1.7Availibility Requirements$0.00$0.00$0.00$0.00$0.00
1.8Care of Vessel$0.00$0.00$0.00$0.00$0.00
1.11Condition Found Report$0.00$0.00$0.00$0.00$0.00
1.17Environmental and Hazardous Waste Mgt.$0.00$0.00$0.00$0.00$0.00
1.19Weight Control$0.00$0.00$0.00$0.00$0.00
1.22Gas Free$0.00$0.00$0.00$0.00$0.00
1.23General Requirements for Testing$0.00$0.00$0.00$0.00$0.00
1.24Compartment Arrival / Closeout Inspections$0.00$0.00$0.00$0.00$0.00
3.1.1Personnel and equipment$0.00$0.00$0.00$0.00$0.00
3.1.2Docking Procedure$0.00$0.00$0.00$0.00$0.00
3.1.3Blocking Plan$0.00$0.00$0.00$0.00$0.00
3.1.4Crib and Brace Blocking$0.00$0.00$0.00$0.00$0.00
3.1.5Setting and Alignment of Docking Blocks$0.00$0.00$0.00$0.00$0.00
3.1.6Docking Conference$0.00$0.00$0.00$0.00$0.00
3.1.7Docking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.8Post Docking$0.00$0.00$0.00$0.00$0.00
3.1.9Undocking the Vessel$0.00$0.00$0.00$0.00$0.00
3.1.11Final Docking Report$0.00$0.00$0.00$0.00$0.00
3.2.1Identify Distinguishing Figures and Markings$0.00$0.00$0.00$0.00$0.00
3.2.2Square Tube Stock Removal$0.00$0.00$0.00$0.00$0.00
3.2.3Rubber Fenders$0.00$0.00$0.00$0.00$0.00
3.2.4Zinc Anodes$0.00$0.00$0.00$0.00$0.00
3.2.5Hull and Freeboard Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.2.6Identify color schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.2.7Hull and Freeboard Preservation$0.00$0.00$0.00$0.00$0.00
3.3.1Toe Board Install$0.00$0.00$0.00$0.00$0.00
3.4.1Open, Pump, Clean, Ventilate, and Gas Free Tanks/Voids$0.00$0.00$0.00$0.00$0.00
3.4.2Tank/Void Visual Inspection$0.00$0.00$0.00$0.00$0.00
3.4.3Identify color schemes and Markings$0.00$0.00$0.00$0.00$0.00
3.4.4Tank/Void Touch-Up Preservation$0.00$0.00$0.00$0.00$0.00
3.4.5Blast and Preserve Access covers$0.00$0.00$0.00$0.00$0.00
3.4.6Install Missing Tank Access Cover Fasteners$0.00$0.00$0.00$0.00$0.00
3.4.7Tank Closeout Inspection$0.00$0.00$0.00$0.00$0.00
3.4.8On-Load Fuel$0.00$0.00$0.00$0.00$0.00
3.5.1Main Deck Surface Defects$0.00$0.00$0.00$0.00$0.00
3.5.2Main Deck Track Removal$0.00$0.00$0.00$0.00$0.00
3.5.3Main Deck Non-skid Repair (Option Item)$0.00$0.00$0.00$0.00$0.00
3.5.4Visual Inspection for Structural Defects$0.00$0.00$0.00$0.00$0.00
3.5.5Stanchion Test$0.00$0.00$0.00$0.00$0.00
3.5.6Stanchion Deck Sockets$0.00$0.00$0.00$0.00$0.00
3.5.7Threaded Deck Inserts Preservation$0.00$0.00$0.00$0.00$0.00
3.5.8Threaded Deck Inserts Modification$0.00$0.00$0.00$0.00$0.00
3.5.9Weld Brackets to Main Deck$0.00$0.00$0.00$0.00$0.00
3.6.1Workshop Exterior and Generator Foundation Preservation$0.00$0.00$0.00$0.00$0.00
3.6.2Mount Fire Hose Reel$0.00$0.00$0.00$0.00$0.00
3.6.3Forward Deck House Tower Removal$0.00$0.00$0.00$0.00$0.00
3.10.1Shore Power Connection$0.00$0.00$0.00$0.00$0.00
3.12.1Dual Bridge Crane Maintenance$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00$0.00$0.00
Column Totals0$0.00$0.000$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Scope (SOW/PWS)Labor Rate/MH:G&A Rate:Profit Rate:$0.00
CLIN 0001 Price
$0.00
CLIN 0003 Price
$0.00
Total Evaluated Price:

&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********

=C(XXX)*D61*F61

=(D(XXX)+I(XXX))*I61

=SUM(E(XXX)+I(XXX)+J(XXX)+K(XXX)+L(XXX))

=C(XXX)*D61+D(XXX)

=G(XXX)+H(XXX)

*ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.

NOTE: Please fill in within the yellow highlighted boxes, the fixed labor rate, proposed G&A and proposed Profit rates.

NOTE: Labor Rate/Manhour, G&A Rate, and Profit Rates (Row 61) are used to calculate the overall price of the base contract award and shall be the basis for pricing on all modifications under this contract.