N4523A18R1053_Request_for_Clarification_(RFC)_Form_004.pdf
PDF 175 KB Posted
- Attached to
- 65 FT Bravo Dive Boat Federal contract opportunity
- Solicitation number
- N4523A-18-R-1053
About this file
N4523A18R1053 Request for Clarification (RFC) 004.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_008.pdf | ||
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_003.pdf | ||
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_005.pdf | ||
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_001.pdf | ||
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_006_&_007.pdf | ||
| N4523A18R1053_Request_for_Clarification_(RFC)_Form_002.pdf | ||
| N4523A18R1053_Additional_Bravo_Dive_Boat_SOW_References_RFC_005_&_RFC_008.zip | ZIP file | |
| N4523A18R1053_Bravo_Dive_Boat_SOW_References.zip | ZIP file | |
| N4523A18R1053.pdf | ||
| Attachment_J-1_Statement_of_Work_(SOW.pdf | ||
| Exhibit_A_CDRLs_&_DIDs.pdf | ||
| Attachment_J-5_Corporate_Experience_Data_Sheet.docx | DOCX document | |
| Attachment_J-3_Request_for_Clarification_(RFC)_Form.docx | DOCX document | |
| Attachment_J-4_Contract_Performance_Data_Sheet.docx | DOCX document | |
| Attachment_J-2_Price_Proposal_Worksheet.xls | XLS spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR SPECIFICATION CLARIFICATION
DATE OF REQUEST: 9FEB2018 QUESTION NO: 004
REQUIREMENT: N/A REQUISITION NO.: N4523A18R1053
ITEM NO: N/A
TITLE: WEIGHT CONTROL
ISSUING OFFICE POC (CODE 440.22):
Nick Crowell: (360) 476-4071 nicholas.a.crowell@navy.mil
PARA. NO: 3.2.2 PAGE NO: 25, SOW CONTRACTOR:
PLANNER’S NAME: ATTACH. NO: CONTRACTOR POC & PHONE:
CONTRACTOR QUESTION:
Para 3.2.2, drawing SK10826, shows that there is a modification to the mounting of the rubber fenders, but the SOW does not state the contractor is to accomplish the mod. It only states to remove fenders, clean, inspect, and reinstall, replace all hardware. Is the contractor to assume this is only for reference and not to be accomplished?
DO NOT WRITE BELOW THIS LINE
SPEC CHG: N DWG/REF CHG. N RQMTS CHG: N MAT'L CHG: N
TECHNICAL REVIEW: GILBERT SERIAL NO:
Accomplish requirements of paragraph 3.2.2
ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE POC NO
LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.
File details come from the government source that posted it.