Attachment_J-2_Price_Proposal_Worksheet.xls
XLS spreadsheet 39 KB Posted
- Attached to
- 65 FT Bravo Dive Boat Federal contract opportunity
- Solicitation number
- N4523A-18-R-1053
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||
| Project = | 65 FT DIVE BOAT | DATE: = | |||||||
| PRIME | SUBCONTRACTOR | Grand Total = | $0 | ||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | PRIME |
OTHER
(G&A) PRIME
OTHER
| (PROFIT) | Line Item Tally | ||
| 1.4 Arrival Conference: Project manager, Admin, QA Manager | $0 | ||
| 1.5 Required Reports; 27 CDRLs | $0 | ||
| 1.6 Progress Meetings; | $0 | ||
| 1.7 Availability Requirements | $0 | ||
| 1.8 Care of Vessel | $0 | ||
| 1.11 Condition Found Reports | $0 | ||
| 1.13 Safety Requirements | $0 | ||
| 1.14 Hot Work / Welding | $0 | ||
| 1.15 Threaded Fasteners | $0 | ||
| 1.17 Environmental & Hazardous Waste Management | $0 | ||
| 1.18 Materials | $0 | ||
| 1.19 Weight Control | $0 | ||
| 1.20 Label Plates | $0 | ||
| 1.22 Gas Free | $0 | ||
| 1.23 General Requirements for Testing | $0 | ||
| 1.24 Compartment Arrival / Close out Inspection | $0 | ||
| 3.1 Docking / Undocking | $0 | ||
| 3.1.2 Docking Procedure | $0 | ||
| 3.1.3 Blocking Plan | $0 | ||
| 3.1.4 Crib & Brace Blocking | $0 | ||
| 3.1.5 Setting & Alignment of Blocks | $0 | ||
| 3.1.7 Docking Conference | $0 | ||
| 3.1.8 Docking the vessel | $0 | ||
| 3.1.9 Post Docking | $0 | ||
| 3.1.10 Undock Vessel | $0 | ||
| 3.1.12 Final Docking Report | $0 | ||
| 3.2.1 Identify Distinguishing Figures & Markings | $0 | ||
| 3.2.2 Rubber Fenders | 180 | $0 | |
| 3.2.3 Remove FWD Push Bar | $0 | ||
| 3.2.4 Zinc Anodes | $0 | ||
| 3.2.5 Hull Blast and Preservation | $0 | ||
| 3.2.6 Hull & Freeboard Inspection | 8 | $0 | |
| 3.2.7 Hull & Freeboard UT | $0 | ||
| 3.3.1 Remove Diver Umbilical Saddles | $0 | ||
| 3.3.2 Weld umbilical rack base plates | $0 | ||
| 3.3.3 Aluminum Pipe repairs | $0 | ||
| 3.4.1 Tanks, Open, clean, ventilate and Gas Free | $0 | ||
| 3.4.2 Tank / Void visual inspection | $0 | ||
| 3.4.3 Identify Color Schemes & markings | $0 | ||
| 3.4.4 Preliminary Air Test | $0 | ||
| 3.4.5 Clean, Disinfect, flush Potable water tk | $0 | ||
| 3.4.6 Certify Potable water tk & piping | $0 | ||
| 3.4.7 Install access covers | $0 | ||
| 3.4.8 Final Air Test | $0 | ||
| 3.4.9 On load fuel | $0 | ||
| 3.4.10 Watertight hatch Repairs | 36 | $0 | |
| 3.5.1 Main Deck Non-skid repair | $0 | ||
| 3.5.2 Main Deck Visual Inspection | 4 | $0 | |
| 3.6.1 Main Cabin roof non skid repair | $0 | ||
| 3.6.2 Main Cabin and Mast preservation | $0 | ||
| 3.7.1 Shaft Removals | $0 | ||
| 3.7.2 Shaft Reassemble | $0 | ||
| 3.7.3 System Operational Test | $0 | ||
| 3.8.1 Rudder Swing Test | $0 | ||
| 3.8.2 Steering Removals | $0 | ||
| 3.8.3 Steering Assembly | $0 | ||
| 3.8.4 System Operational Test | $0 | ||
| 3.13.2 Sea Trial Base line Dock Trial | $0 | ||
| 3.13.3 Dock Trial | $0 | ||
| 3.13.4 Sea Trial | $0 | ||
| $0 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR*********