7275V525-00309-7275-V525_UNCLAS_Statement_of_Work_-_Products.pdf
PDF 102 KB Posted
- Attached to
- Lead Shielding
- Solicitation number
- N4523A18Q4033
About this file
Statement of Work - Products
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JOB ORDER KO KO ITEM KO REV IDN IDN REV PAGE
3615R-86028 S02 101 - 7275-V525 - 1 OF 4
16OCT2017
STATEMENT OF WORK
FOR
LEAD SHIELDING
Prepared by
PUGET SOUND NAVAL SHIPYARD &
INTERMEDIATE MAINTENANCE FACILITY
3615R-86028 S02 101 - 7275-V525 - 2 OF 4
CONTENTS
Section/Paragraph
1 Scope
1.1 Background
2 Applicable documents
2.1 Specifications
2.2 Standards
2.3 Other Government documents
2.4 Non-Government standards and other publications
2.5 Availability of Non-Government standards and other publications
3 Requirements
3.1 General Requirements
3.2 Technical Objective and Goals
3.2.1 Design, Engineering, Fabrication and Test Contractor Services
3.2.2 Program Planning
3615R-86028 S02 101 - 7275-V525 - 3 OF 4
1 Scope. This Statement of Work (SOW) defines the effort for the fabrication and testing of
LEAD SHIELDING identified by the following Job Material Lists (JMLs) associated with this contract: 7275V525, 7275V526, 7275V527, 7275V528 and 7275V529.
1.1 Background. The LEAD SHIELDING is required for support of government work.
2 Applicable Documents. The following documents are applicable to this SOW.
2.1 Specifications.
2.1.1 QQ-L-201 Revision F with Amendment 2; Federal Specification, Lead Sheet
2.1.2 QQ-C-40 Original Revision; Federal Specification, Calking: Lead Wool & Pig
2.2 Standards.
2.2.1 MIL-STD-2041 Revision E; Control of Detrimental Materials
2.3 Other Government documents. The specifications of paragraph 2.1 are electronically available in Information Handling Service (IHS; Haystack). Please contact your company's contracting officer or purchasing agent to obtain the military standard of paragraph 2.2.1.
2.4 Non-Government standards and other publications.
2.4.1 PSNS Drawing 2301-3537 Revision H; Temporary Lead Shielding Assemblies
2.5 Availability of Non-Government standards and other publications. The drawing listed above will be provided in the contract.
3 Requirements.
3.1 General Requirements. The contractor shall manufacture LEAD SHIELDING components of this SOW in accordance with the federal specifications of paragraph 2.1, the drawing of paragraph 2.4.1 and this SOW.
3.1.1 The contractor shall manufacture LEAD SHIELDING components for JMLs
7275V525 and 7275V526 in accordance with the federal specification of paragraph 2.1.1.
3.1.2 The contractor shall manufacture the LEAD SHIELDING components for JMLs
7275V527, 7275V528 and 7275V529 in accordance with the federal specification of paragraph
2.1.2.
3.1.3 The contractor shall manufacture LEAD SHIELDING components to meet the detailed requirements of the drawing provided by paragraph 2.4.1 and paragraph 3.2.1 of this
SOW.
3615R-86028 S02 101 - 7275-V525 - 4 OF 4
3.2 Technical Objectives and Goals.
3.2.1 Design, Engineering, Fabrication and Test.
3.2.1.1 Design and Engineering. The contractor shall design the LEAD SHIELDING of this SOW to meet the specifications and performance criteria provided by the drawing of paragraph 2.4.1.
3.2.1.2 Design Analysis. Not applicable.
3.2.1.3 Preliminary Design Review (PDR) and Design Formalization. Not applicable.
3.2.1.4 Fabrication. The contractor shall fabricate the LEAD SHIELDING of this SOW in accordance with the drawing provided by paragraph 2.4.1 of this drawing.
3.2.1.5 Test and Evaluation.
3.2.1.5.1 The contractor shall test LEAD SHIELDING components of this SOW
(that reference General Note #6 of the drawing (paragraph 2.4.1)) for detrimental materials in accordance with General Note #6 and the military standard of paragraph 2.2.1. The test may be conducted at the contractor's facilities or at an independent laboratory or commercial testing facility.
3.2.1.5.2 The contractor shall provide one test report (per chemical formulation) with each production batch supplied to the government under this contract. For example, if the same chemical formulation is used for all LEAD SHIELDING components of this SOW (that reference General Note #6 of the drawing (paragraph 2.4.1)), then only one report is required for the LEAD SHIELDING components of this SOW.
3.2.1.5.2 The contractor shall evaluate the LEAD SHIELDING of this SOW in accordance with General Note #15 of the drawing provided by paragraph 2.4.1
3.2.1.6 Certificate of Compliance (COC). The contractor shall provide a COC to confirm all design, performance, drawing and test specifications required by this contract have been met.
3.2.2 Program Planning
3.2.2.1 Program Management. Not applicable.
3.2.2.2 Human Engineering Program Not applicable.
3.2.2.3 Logistic Support Planning. Not applicable.
File details come from the government source that posted it.