Sheet1
| INSERT CONTRACTOR/COMPANY NAME HERE | |||||||||||
| Project = | SWOB 25 | DATE: = | |||||||||
| PRIME | SUBCONTRACTOR | PRIME | PRIME | ||||||||
| PARAGRAPH No. | TITLE | M/H | LABOR PRICE | MATERIAL PRICE | M/H | LABOR PRICE | MATERIAL PRICE | Other Direct Cost (ODC)* | G&A | PROFIT | Line Item Total |
| 1.4 | Arrival Conference | $0 | |||||||||
| 1.5 | Required Documents | $0 | |||||||||
| 1.6 | Progress Meeting | $0 | |||||||||
| 1.7 | Availability Requirements | $0 | |||||||||
| 1.11 | CFR Reports | $0 | |||||||||
| 1.13 | Safety Requirements | $0 | |||||||||
| 1.13.3 | Scaffolding | $0 | |||||||||
| 1.16 | Preservation OQE | $0 | |||||||||
| 1.17 | Environmental/Hazwaste Managemment | $0 | |||||||||
| 1.21 | Gas Free | $0 | |||||||||
| 1.23 | Compartmet Arrival/ Closeout Inspection | $0 | |||||||||
| 3.1 | Docking & Undocking | $0 | |||||||||
| 3.1.3 | Blocking Plan | $0 | |||||||||
| 3.1.4 | Crib and Brace Blocking | $0 | |||||||||
| 3.1.5 | Setting and Alignment of Docking Blocks | $0 | |||||||||
| 3.1.6 | Docking Conference | $0 | |||||||||
| 3.1.7 | Docking the Vessel | $0 | |||||||||
| 3.1.8 | Post Docking | $0 | |||||||||
| 3.1.9 | Undocking the Vessel | $0 | |||||||||
| 3.2.1 | Identify Distinguishing Figures & Markings | $0 | |||||||||
| 3.2.2 | Rubber Fender | $0 | |||||||||
| 3.2.3 | Zinc Anodes | $0 | |||||||||
| 3.2.4 | Hull Blasting & Preservation | $0 | |||||||||
| 3.2.5 | Hull and Freeboard Visual Inspection | $0 | |||||||||
| 3.2.6 | Hull and Freeboard UT Inspection | $0 | |||||||||
| 3.2.7 | Steel Half Pipe Fenders | $0 | |||||||||
| 3.2.8 | Skeg Repairs | $0 | |||||||||
| 3.3.1 | Deckhouse: Identify Distinguishing Figures and Markings | $0 | |||||||||
| 3.3.2 | Blast and Preserve of Exterior of Deck House | $0 | |||||||||
| 3.3.3 | Deckhouse Signage Repair | $0 | |||||||||
| 3.3.4 | Replace Deck House Roof Nonskid | $0 | |||||||||
| 3.3.5 | Deck House Exterior Visual Inspection | $0 | |||||||||
| 3.3.6 | Install New Deck House Window Gaskets | $0 | |||||||||
| 3.3.7 | Install New Deck House Door Gasket | $0.00 | |||||||||
| 3.3.8 | Deck House Roof Cofferdam Repairs | $0.00 | |||||||||
| 3.4.1 | Open, Pump, Clean, Vent, Gas free | $0.00 | |||||||||
| 3.4.2 | Identify Distinguishing Figures & Markings | $0.00 | |||||||||
| 3.4.3 | Tanks/Void Visual Inspection | $0.00 | |||||||||
| 3.4.4 | Cargo Tank UT Inspection | $0.00 | |||||||||
| 3.4.5 | Preliminary Air Tests | $0.00 | |||||||||
| 3.4.6 | Cargo Tank/Void Touch up Preservation | $0.00 | |||||||||
| 3.4.7 | Blast and Preserve Access Covers | $0.00 | |||||||||
| 3.4.8 | Void Touch-Up Preservation | $0.00 | |||||||||
| 3.4.9 | Hatch Repairs | $0.00 | |||||||||
| 3.4.10 | Install Tank & Void Covers | $0.00 | |||||||||
| 3.4.11 | Final Air Test | $0.00 | |||||||||
| 3.4.12 | Closeout Inspection | $0.00 | |||||||||
| 3.5.1 | Main Deck Non-skid repair | $0.00 | |||||||||
| 3.5.2 | Main Deck Visual Inspection | $0.00 | |||||||||
| 3.5.3 | Main Deck UT inspection | $0.00 | |||||||||
| 3.5.4 | Stanchion Deck Socket Repair | $0.00 | |||||||||
| 3.5.5 | Repair Portable Handrail and Liferail System | $0.00 | |||||||||
| 3.5.6 | Cofferdam Repairs | $0.00 | |||||||||
| 3.5.7 | Roller Chock Repairs | $0.00 | |||||||||
| 3.6.1 | Cargo Pump Repairs | $0.00 | |||||||||
| 3.7.1 | Tank Level Indication System Repairs | $0.00 | |||||||||
| 3.8.1 | Cargo Piping Preservation | $0.00 | |||||||||
| 3.8.2 | Cargo Piping UT Inspection | $0.00 | |||||||||
| 3.8.3 | Valve Repairs | $0.00 | |||||||||
| 3.8.4 | Cargo Simplex Strainer Inspection | $0.00 | |||||||||
| 3.8.5 | Relief Valve Adjustment | $0.00 | |||||||||
| 3.8.6 | Fuel Oil Flexible Transfer Hose Testing | $0.00 | |||||||||
| 3.9.2 | Dock Trials Baseline Testing | $0.00 | |||||||||
| 3.9.3 | Final Dock Trial | $0.00 | |||||||||
| Column Totals | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
&C********DOLLAR ENTRIES ARE AUTOMATICALLY ROUNDED UP TO THE NEAREST WHOLE DOLLAR********* *ODC-Defined as anything other than labor, subcontracts, and/or material that is directly attributable to a contract per FAR 31.202. Examples include rental charges and travel etc.
NOTE: Please fill in within the yellow highlighted boxes, the proposed G&A and proposed Profit rates.