AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1) The purpose of this amendment is to provide answ ers to questions received from prospective offerors. This amendment answ ers Request for Clarif ication (RFC) 1-14.
2) Change SOW paragraph 3.4.7 Table 5, based on RFC 1 and 2.
3) Change SOW paragraph 3.2.2, based on RFC 4, 5 and 6.
4) Change SOW list of reference draw ings and paragraph 3.5.4, based on RFC 7.
5) Change SOW paragraph 3.3.2.4, based on RFC 9 and 10.
6) Change SOW paragraphs 3.8.2 and 3.8.3, based on RFC 13.
7) Change SOW list of reference draw ings and paragraph 3.3.3.2, based on RFC 14.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Jun-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4523A17R0033
X 9B. DATED (SEE ITEM 11)
06-Jun-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Jun-2017
CODE
PUGET SOUND NAVAL SHIPYARD
1400 FARRAGUT
BREMERTON WA 98314
N4523A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4523A17R0033
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
Question #1: In 3.7.4 void preservation table 5 the contractor cannot find voids 2-2-0-V or 2-13-0-V is this a typo and if not can you supply the right void ID.
Answer #1: Paragraph 3.4.7 table 5 void 2-2-0-V should be split to show 2-2-1-V and 2-2-2-V. Void 2-13-0-V should be split to show 2-13-1-V and 2-13-2-V. Table 5 has been updated accordingly. All are shown on dwg 800- 4470385A which was sent with the original solicitation. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.
Question #2: Paragraph 3.4.7 calls for ‘Remove existing and install new coating systems to the entire interior surfaces listed in TABLE 5’. Void numbers in Table 5do not correspond to void numbers on 800-4470385 ‘Gen Arrgt/Profile’ drawing. Drawing indicates voids 2-2-1-V and 2-2-2-V not 2-2-0-V. Drawing indicates voids 2-13-1-V and 2-13-2-V not 2-13-0-V. Please clarify number of voids for preservation.
Answer #2: (see answer #1)
Question #3: In table 5 for void preservation voids 2-5-0-V and 2-8-0-V AND 2-11-0-V are we do both port and starb voids?
Answer #3: For table 5 voids 2-5-0-V, 2-8-0-V and 2-11-0-V there is no Port or Stbd. They are one tank extending the width of the vessel as shown in DWG 544-4470389. This answer does not constitute a change to the solicitation.
Question #4: Are we to store & reuse existing fasteners or replace with new?
Answer #4: Remove existing and retain rubber fender fasteners for reinstallation in paragraph 3.2.2.2. SOW paragraph 3.2.2.1.1 has been added for clarification. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.
Question #5: Is the contractor to assume all fasteners are to be reused in the installation of the rubber fenders?
Answer #5: (see answer #4)
Question #6: Paragraph 3.2.2.2 calls for install of cleaned rubber fenders. Is contractor to re-use existing fasteners?
Answer #6: (see answer #4)
Question #7: Can you supply the drawings for the Handrail and lifeline system.
Answer #7: DWG 804-5184155 shall be provided as general guidance, template from existing conditions. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.
Question #8: Will the Navy consider holding another ship-check? My understanding is that the middle tanks were closed up during the ship check held on 6/20 so we were unable to assess their conditions for bidding purposes.
Answer #8: No. After paragraph 3.4.3 has been completed if the square footage recommended for touch up preservation exceeds the 200 sq ft per cargo tank identified in 3.4.6 a CFR should be submitted. This answer does not constitute a change to the solicitation.
Question #9: Paragraph 3.3.2.4 states to install new warning sign. Is ‘Warning Sign’ intended to be painted on the deck house exterior bulkhead or to be a placard, mounted to the exterior of the deck house? If mounted, contractor request desired material for the placard and mounting method for new Warning Sign.
Answer #9: Paint. New warning signs shall be installed using a 12-year service life, low solar absorption (LSA), silicone alkyd coating system as follows: prime coat in accordance with the requirements of MIL-PRF-23236 or 24647, Type V or VI, 4-8 mils DFT; stripe and second coat in accordance with the requirements of MIL-PRF-23236 or 24647, Type V or VI, 4-8 mils DFT; top coat horizontal and vertical surfaces in accordance with the requirements of MIL-PRF-24635, Type III, Grade B, 2-3 mils DFT; installed in accordance with the manufacturer’s F-718. Top
N4523A17R0033 coat shall be white and stencil lettering shall be black. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.
Question #10: What material shall be used for the new warning sign?
Answer #10: (see answer #9)
Question #11: Paragraph 3.8.2 states dock trials to be prior to docking the vessel. Can dock trials be conducted at PSNS prior to transport to contractor facility?
Answer #11: No. Dock trials shall be conducted at the contractor facility. This answer does not constitute a change to the solicitation.
Question #12: Paragraph 3.8.2 states dock trials to be prior to docking the vessel. If dock trials conducted at PSNS will government dispose of testing medium?
Answer #12: Dock trials shall be conducted at the contractor’s facility, Government will not dispose of testing medium. This answer does not constitute a change to the solicitation.
Question #13: Paragraph 3.8.2 states dock trials to be prior to docking the vessel. How much testing medium will be required for conducting dock?
Answer #13: 2,000 gallons of fresh water will be required for dock trial baseline testing (included in paragraph 3.8.2). An additional 2,000 gallons of fresh water will be required for final dock trail testing (included in paragraph 3.8.3). This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.
Question #14: Contractor requests additional information on type or style of bulkhead penetration. If shore power bulkhead penetration is plugged, include plug information.
Answer #14: Penetration exterior to deck house shall extend 2 inches from bulkhead and have one inch threading with matching threaded cap that has a gasket and lanyard to keep the weather out while not in use and retain while in use. DWG 803-1385866 has been included for guidance. This answer does constitute a change to the solicitation, and is reflected in the summary of changes of this amendment.