Exhibit_J-1_CDRLs_&_DIDs_A001_through_A026.pdf

PDF 4 MB Posted

Attached to
Maintenance, Repair & Preservation of SWOB-24 (Ship Waste Oil Barge)
Solicitation number
N4523A-17-R-0033
Issued by

About this file

Exhibit J-1_CDRLs & DIDs A001 through A026

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:28Z Check the source to verify that this is the current version before use.

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:28Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DATA ITEM DESCRIPTION

Title: COATING SYSTEM DATA REPORT

Number: DI-QCIC-82111 Approval Date: 20170327

AMSC Number: N9784 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: QCIC-2017-004

Applicable Forms: N/A

Use/Relationship: Coating System data report is used by the Government to define product requirements.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

The Website cited in this DID can be accessed at: http://www.nstcenter.biz/tech-documents/astm-f718s/

Requirements:

1. References Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The Report shall be in contractor’s format.

3. Content. The Report shall include all of the information specified in The American Society of Testing and Materials, Standard Specification for Shipbuilders and Marine Paints and

Coatings Product/Procedure Data Sheet(ASTM) F-718.

End of DI-QCIC-82111

Source: https://assist.dla.mil -- Downloaded: 2017-03-28T14:42Z http://www.nstcenter.biz/tech-documents/astm-f718s/ http://www.nstcenter.biz/tech-documents/astm-f718s/

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: SAFETY DATA SHEET (SDS) REPORT

Number: DI-SAFT-82112 Approval Date: 20170327

AMSC Number: N9785 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: SAFT-2017-004

Use/Relationship: The SDS Report will be used by the Government to define product safety and environmental procedures.

The Website cited in this DID can be accessed at:

https://www.osha.gov/Publications/OSHA3514.html

1. References.

1.1 Occupational Safety and Health Administration (OSHA) Part Number 1910.1200 App D

SDS, Subpart Z Toxic and Hazardous Substances.

2. Format. The Report shall be in contractor’s format.

3. Content. The Report shall include all of the information specified in the Occupational

Safety and Health Administration (OSHA) Part Number 1910.1200 App D SDS, Subpart Z

Toxic and Hazardous Substances.

End of DI-SAFT-82112

Source: https://assist.dla.mil -- Downloaded: 2017-03-28T14:43Z https://www.osha.gov/Publications/OSHA3514.html

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: CONDITION FOUND REPORT

Number: DI-MGMT-81648 Approval Date: 20040809 AMSC Number: N7531 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: N PEO SHIPS-FL32 Applicable Forms: N/A

Use/Relationship: The Condition Found Report identifies needed repairs and recommends corrective action for work discovered during the contract performance period which are not covered by the work specifications.

This DID contains the format, content, and intended use information for the data product resulting from the work task described in the contract.

Requirements:

1. Reference documents. N/A.

2. Format. The report shall be in contractor’s format.

3. Content. The report shall be serialized by CFR Number, and shall include the following:

a. Contract number, ship and hull number

b. Work Item Number to which the CFR relates

c. Date work requirement was discovered

d. Clear description of the work requirement

e. Specific location of the work requirement

f. Recommendation for corrective action

3.1 Recommendation for appropriate/best time to accomplish (i.e. during current availability with or without schedule change, future CNO or Continuous Maintenance Availability), and supporting rationale for the recommendation (such as cost efficiencies, availability of work force, availability of material, premium expenditures, etc.).

3.2 Cost and time estimates and the time frame for which it is valid, including:

a. Class “C” cost estimates. For work requirements which could be estimated within five working days, a class “F” estimate (+/-40%) identifying any potential impact which may affect the current schedule shall be included. The Class “F” estimate shall also contain the date on which a class “C” estimate will be provided.

b. Estimated Premium/Acceleration Costs, including premium costs for; material, subcontractors, man-hours, rework and any additional costs to on going work resulting from inclusion of the CFR work requirement.

c. Identification of related changes, if any, to the internal milestones and production and contract completion dates shall be included. When no changes were required a statement to that fact shall also be included

4. Media. The electronic media requirements shall be as specified in the contract on the DD 1423 CDRL.

5. End of DI-MGMT-81648

Source: https://assist.dla.mil -- Downloaded: 2016-05-07T22:47Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: INCIDENT REPORT

Number: DI-MGMT-82071

AMSC Number: N9720

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

GIDEP Applicable: No

Project Number: MGMT-2016-058

Use/Relationship: This DID will be used to describe each accident, electrical shock, and fire that requires medical treatment.

This DID contains the format and content preparation instructions for the data product generated by the discrete task requirement as delineated in the contract.

Format. The report shall be similar to that of Figure 1.

Content. The report shall contain all the information contained in Figure 1.

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T15:48Z

DI-MGMT-82071

Figure 1

INCIDENT REPORT

Report #

INITIAL REPORT REQUESTED UPDATE FINAL REPORT

TYPE OF INCIDENT:

NAME(S) OF INJURED (if applicable):

INCIDENT DATE: TIME: COMPANY:

SUPERVISOR:

LOCATION OF INCIDENT: TYPE OF INJURY OR FIRE:

CAUSE OF INCIDENT: EQUIPMENT INVOLVED:

WORK ITEM NUMBER: CONTRACT NUMBER:

WITNESS AND/OR INDIVIDUALS INVOLVED

NAME(S) DEPT. COMPANY

DESCRIPTION OF INCIDENT

INVESTIGATED BY (NAME): TITLE:

SIGNATURE OF INVESTIGATOR: DATE:

DISPOSITION OF INJURED (if applicable)

IMMEDIATE CORRECTIVE ACTION

FIGURE 1 (continued)

LONG TERM CORRECTIVE ACTION

INVESTIGATED BY (NAME): TITLE:

SIGNATURE OF INVESTIGATOR: DATE:

INCIDENT REPORT

Report #

ROOT CAUSE ANALYSIS

FIGURE 1 (continued) Incident Report Instructions

REPORT NUMBER- Unique tracking number created by contractor

TYPE OF INCIDENT- Injury, fire or near miss

NAME(S) OF INJURED- Self Explanatory

INCIDENT DATE: - Self Explanatory

TIME: - Self Explanatory

COMPANY: - Prime and subcontractors involved

SUPERVISOR – Supervisor of employee(s) involved

LOCATION OF INCIDENT: - Base/Yard, Ship name and hull number, space number and compartment name TYPE OF

INJURY OR FIRE – i.e. broken arm, laceration to head or Class A, B, C fires, smoldering

CAUSE OF INJURY – i.e. Equipment failure, PPE, process

EQUIPMENT INVOLVED – Equipment working on and equipment being used to cause incident WORK

ITEM NUMBER – Work Item being accomplished when incident occurred

CONTRACT NUMBER: - Contract Number assigned by government agency i.e. RMC, Alteration Installation Team

(AIT) Sponsor.

WITNESS AND/OR INDIVIDUALS INVOLVED – Name, company of witnesses and or individuals involved with the incident.

DESCRIPTON OF INCIDENT OR NEAR MISS – Short description of events leading up to incident and extent of injuries and or damage to equipment.

DISPOSITION OF INJURED – i.e. Transported to hospital via ambulance or POV, transported to clinic, released from hospital, name of hospital or clinic, limited duty or loss time (if known).

IMMEDIATE CORRECTIVE ACTION – i.e. Scene/space secured, ship notified (who and when), RMC notified (who and when) clean-up of blood, equipment secured fire debris cleaned up.

INVESTIGATED BY – Self Explanatory.

TITLE – Self Explanatory.

SIGNATURE OF INVESTIGATOR – Self Explanatory.

DATE – Self Explanatory.

LONG TERM CORRECTIVE ACTION – What action(s) were taken so that incident does not reoccur, i.e. training, safety stand down or process/policy change?

ROOT CAUSE ANALYSIS – Process by which you will identify the cause or contributing factors of the incident.

Note: Attach additional information as necessary.

End of DI-MGMT-82071

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: TEMPORARY ACCESS CUT DRAWING/SKETCH

Number: DI-PSSS-82079

AMSC Number: N9703

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161004

Limitation: N/A

Project Number: PSSS-2016-020

Use/Relationship: This DID will identify each proposed access cut to the ship structure and engine enclosure and a list of each proposed bolted/riveted access removal. The drawing/sketch shall not contain authorized access cuts on NAVSEA-approved drawings.

References. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

Format. The Drawing/Sketch shall be in the contractor’s format.

Content. The Drawing/Sketch shall include the following information:

A plan and elevation view specifying the location of the access by deck, frame, and distance from the center line or deck edge and showing location of adjacent penetrations, bulkheads, framing, welds, and riveted joints within 12 inches of the proposed cut.

Location and number of previous cuts visible in each plate and the cutback of existing welds.

Temporary structural reinforcement required to prevent distortion of ship structure.

Thickness and type of material of plating and structural members to be cut. Include source or document/drawing number which identifies material requirements.

A description of the temporary access closure and enclosures.

A copy of the weld approved weld procedure number with the proposed access sketch.

List of bolted/riveted access covers shall include location, designation, and classification as identified on ship's damage control book.

All drawing titles and numbers (including applicable sub-tier), and technical documentation that will used to accomplish the requirements of MIL-STD-1689.

End of DI-PSSS-82079

Source: https://assist.dla.mil -- Downloaded: 2016-12-06T20:10Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: PAINT PRESERVATION APPENDICES REPORT

Number: DI-MISC-82120 Approval Date: 20170410

AMSC Number: N9794 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MISC-2017-006

Use/Relationship: The Preservation Appendices Report will provide the Government with evidence of completed preservation operations.

by the specific and discrete task requirements as delineated in the contract.

Format. The Paint Preservation Appendices Report shall be in contractor’s format.

Content. The Paint Preservation Appendices Report shall contain all the information contained in

Sample Figures 1 through 9.

Source: https://assist.dla.mil -- Downloaded: 2017-04-18T13:08Z

DI-MISC-82120

SAMPLE FIGURE-1

SAMPLE FIGURE-2

SAMPLE FIGURE-3

SAMPLE FIGURE-4

SAMPLE FIGURE-5

SAMPLE FIGURE-6

SAMPLE FIGURE-7

SAMPLE FIGURE-8

End of DI-MISC-82120

SAMPLE FIGURE 9

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DATA ITEM DESCRIPTION (DID

Title: Hazardous Waste Report

Number: OT-17-20151 dsw Approval Date: 20170420 dsw

AMSC Number: N/A Limitation: N4523A-17-R-0033 DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: SH Project Number:

Use/Relationship: The Hazardous Waste Report will identify type, amount, and disposal cost of hazardous waste removed during the period of performance. It will provide the Government with evidence of proper hazardous waste disposal.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is for one time use on solicitation N4523A-17-R-0033 only. dsw

1. Format. The Report shall be in contractor’s format.

2. Content. The report shall contain:

a. Name of each item.

b. Title of each item.

c. Description of each item.

d. Quantity of each item.

e. Analysis used to identify the hazardous waste.

f. Copies of paid invoices for the disposal of hazardous wastes.

g. Copies of paid receipts for the disposal of hazardous wastes.

End of OT-17-20151. dsw

Page 1 of 1 Page

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: GAS FREE PROGRAM REPORT

Number: DI-MGMT-82093 Approval Date: 20161208

AMSC Number: N9754 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2017-001

Use/Relationship: The Gas Free Program Report will provide the Government with proof of the

Contractor’s confined space entry/gas free certification processes and qualified personnel, including sub-contractors.

by the specific and discrete task requirements as delineated in the contract.

2. Content. The Gas Free Program Report shall contain the following Sections:

2.1 Objective.

2.2 Background.

2.3 Assignment of Responsibility for:

a. Employer

b. Program Manager

c. Entry Supervisors

d. Attendants

e. Rescue Team

f. Entrants/Affected Employees

2.4 Training:

a. Training Frequency

b. General Training

c. Specific Training

d. Verification of Training

2.5 Identification of Hazards and Evaluation of Confined Spaces:

a. Survey

b. Hazard Reevaluation

c. Pre-Entry Hazard Assessment

d. Hazard Controls

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:11Z

DI-MGMT-82093

2.6 Entry Permits:

a. Key Elements of Entry Permits

b. Permit Scope and Duration

2.7 Entry Procedures:

a. Prior to Entry

b. Opening a Confined Space

c. Atmospheric Testing

d. Isolation and Lockout/Tagout Safeguards

e. Ingress/Egress Safeguards

f. Warning Signs and Symbols

2.8 Maintenance of Safe Conditions:

a. Conditions

b. Tests required

2.9 Emergency Response:

a. Emergency Response Plan

b. Retrieval Systems and Methods of Non-Entry Rescue

2.10 Current Roster of the following personnel:

a. Certified National Fire Protection Association (NFPA) Marine Chemists

b. Certified Industrial Hygienists

c. Qualified Competent Persons

End of DI-MGMT-82093

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:11Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: TEST AND INSPECTION PLAN (TIP)

Number: DI-MGMT-82062

AMSC Number: N9711

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-049

Use/Relationship: This DID is used to identify all inspections and tests required by zero-tier references and first tier references, as well as symbols (I)(V)(Q) test/inspections and (G) government notification identified in the Work Item, and any additional tests and inspections the contractor deems necessary to substantiate product conformance.

Format. The TIP shall be in the contractor’s format.

Content. The TIP shall include the following information:

Ship’s name/hull number

Work Item number

Work Item Paragraph number

Identification of item/component to be inspected/tested

Standard Item Number

Standard Item Paragraph

Location

Sub-Contractor (if applicable)

Inspection Symbol (I, V, Q, G)

Accept/Reject Criteria

Test Result (Accept or Reject)

Notify Date

Notify Time

Request Date

Request Time

Inspection Date

Name of Person Notified

Name of Government Representative at Inspection

Name of Contractor’s authorized representative who witnessed/performed test.

End of DI-MGMT-82062

Source: https://assist.dla.mil -- Downloaded: 2016-12-06T20:05Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: COMPARTMENT INSPECTION REPORT

Number: DI-MGMT-82063

AMSC Number: N9712

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-050

Use/Relationship: This DID will be used to provide results of each compartment inspection, including discrepancies found, and provides objective quality evidence (OQE) for the work accomplished within the compartment.

Format. The report shall be in the contractor’s format.

Content. The report shall contain the following information:

Name and hull number of ship

Job Order

Work Item

Paragraph numbers including standard item paragraph number

Compartment (number and name)

Date of inspection

List of discrepancies and the identity of the Contractor responsibility and Government responsibility

Signature of Contractor representative

Signature of SUPERVISOR

Signature of Commanding Officer’s designated representative

End of DI-MGMT-82063

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:27Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: COMPARTMENT INSPECTION REPORT

Number: DI-MGMT-82063

AMSC Number: N9712

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-050

Use/Relationship: This DID will be used to provide results of each compartment inspection, including discrepancies found, and provides objective quality evidence (OQE) for the work accomplished within the compartment.

Format. The report shall be in the contractor’s format.

Content. The report shall contain the following information:

Name and hull number of ship

Job Order

Work Item

Paragraph numbers including standard item paragraph number

Compartment (number and name)

Date of inspection

List of discrepancies and the identity of the Contractor responsibility and Government responsibility

Signature of Contractor representative

Signature of SUPERVISOR

Signature of Commanding Officer’s designated representative

End of DI-MGMT-82063

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:27Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: VESSEL DOCKING AND UNDOCKING PLAN

Number: DI-MGMT-82094 Approval Date: 20161208

AMSC Number: N9755 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2017-002

Use/Relationship: The plan will document a detailed plan to safely dock and undock the vessel(s). It is used by the Government to review, comment, and approve docking and undocking plans prior to each docking and undocking evolution.

1. Format. The Plan shall be in contractor’s format.

2. Content. The Plan shall include the following Docking Procedures:

a. Operating Practices

b. Safety and Security Plans

c. Special precautions or actions required by the characteristics of the dock, marine railway, or other docking methods

d. Pumping/flooding schedule

e. Specific list, trim, and stability requirements

3. The Plan shall contain:

a. Set and align docking blocks

b. A scaled drawing including block size, block spacing, and location of vessel with respect to the blocks at landing

c. Docking clearances utilizing references for guidance

d. The use of haul, fixed, or fitted blocks

e. The number, distance from centerline, and square footage of the side blocks per side sufficient to resist overturning moments

4. The Plan shall show that at least 90 percent of blocks land on longitudinal strength members or main transverse bulkheads.

End of DI-MGMT-82094

Source: https://assist.dla.mil -- Downloaded: 2017-01-10T14:39Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DATA ITEM DESCRIPTION (DID)

Title: Final Docking Report

Number: OT-17-20152 dsw Approval Date: 20170420 dsw

AMSC Number: N/A Limitation:N4523A-17-R-0033

DTIC Applicable: N/A GIDEP Applicable: N/A

Office of Primary Responsibility: SH Project Number:

Applicable Forms: NAVSEA Forms 9997/1 through 9997/5

Use/Relationship: The report will document the results of various vessel drydocking evolutions. It will provide the Government with historical information to be applied to future drydockings.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is for one time use on solicitation N4523A-17-R-0033 only.

The NAVSEA forms 9997/1 through 9997/5 can be obtained as specified in the contract.

1. Format. The Report shall be presented on NAVSEA forms 9997/1 through 9997/5.

2. Content. The Report shall contain all the information specified in

NAVSEA forms 9997/1 through 9997/5 as applicable to each vessel.

End of OT-17-20152. Dsw

Page 1 of 1 Page

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: ZINC ANODE LOCATION REPORT

Number: DI-MGMT-82108 Approval Date: 20170327

AMSC Number: N9781 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: MGMT-2017-016

Use/Relationship: The report will provide detailed current zinc anode locations of the underwater hull of vessel(s).

1. Format. The report shall be in contractor’s format.

2. Content. The Zinc Anode Location report shall contain a sketch of the underwater body and freeboard plating surfaces with the following information:

2.1 Specific locations of fixed hull structural members.

2.2 Specific locations of docking block locations.

2.3 Specific locations of hull reference points.

2.4 Specific measurements of zinc anodes to docking block locations.

2.5 Specific measurements of zinc anodes to hull reference points.

2.6 Specific measurements of zinc anodes to fixed hull structural members.

End of DI-MGMT-82108

Source: https://assist.dla.mil -- Downloaded: 2017-03-30T17:25Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: STRUCTURAL INSPECTION REPORT

Number: DI-MGMT-82065

AMSC Number: N9714

DTIC Applicable: No

Preparing Activity: SH

Applicable Forms: N/A

Approval Date: 20161003

Limitation: N/A

Project Number: MGMT-2016-052

Use/Relationship: This DID will report the conditions found during structural inspection of each exposed piping penetration, deck drain, deck plating and bulkheads for structural integrity, deterioration, pitting, cracks, and areas of damage or distortion.

1. Format. The report shall be in the contractor’s format.

2. Content. The report shall contain the following information:

a. Name and Hull number of ship

b. Job Order

c. Work Item

d. Paragraph numbers including standard item paragraph number

e. Compartment (number and name)

f. Date of inspection

g. Material condition

h. Deficiencies noted

i. Recommendation for repairs

End of DI-MGMT-82065

Source: https://assist.dla.mil -- Downloaded: 2016-10-13T13:23Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: Ultrasonic Test (UT) Report

Number: DI-NDTI-82095 Approval Date: 20161208

AMSC Number: N9756 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: NDTI-2017-002

Use/Relationship: The Ultrasonic Test (UT) Report will document the results of Ultrasonic

Testing. It will provide the Government with evidence of structural damage and deterioration.

1. Format. The UT Report shall be in contractor’s format.

2. Content. The UT report shall include the following:

a. Contractor’s name and address.

b. Contract number.

c. Work item number.

d. Paragraph number.

e. Date of report.

f. Test results.

End of DI-NDTI-82095

Source: https://assist.dla.mil -- Downloaded: 2017-01-05T18:03Z

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

Title: AIR TEST REPORT

Number: DI-NDTI-82110 Approval Date: 20170327

AMSC Number: N9783 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: SH Project Number: NDTI-2017-003

Use/Relationship: The report will be used to provide Objective Quality Evidence (OQE) evidence of the contractor’s Air Test and to evaluate the need for vessel repairs that are not covered by the work specifications.

2. Content. The Report shall contain:

2.1 Test result.

2.2 Recommendation for corrective action.