REQUEST FOR SPECIFICATION CLARIFICATION

DATE OF REQUEST: 11/17/16
QUESTION NO: 005
REQUIREMENT:
REQUISITION NO.: N4523A-17-R-0007

ITEM NO:

TITLE:

ISSUING OFFICE POC (CODE 446):

J. Brian Fergus

(360) 476-4470 James.Fergus@navy.mil

PARA. NO: 3.6.1
PAGE NO:
CONTRACTOR:
PLANNER’S NAME:
ATTACH. NO:
CONTRACTOR POC & PHONE:

CONTRACTOR QUESTION: - The windshield has been in previous contracts "to re-do the gasketing and hinges to make the windshield watertight". The entire frame around the windows is out of plane with the windows and the windows and frame need to be rebuilt from scratch. Otherwise this will be a repeated problem in every contract. Can this contract be re-written to make this a rebuild of windows and window frames?

DO NOT WRITE BELOW THIS LINE

SPEC CHG: N
DWG/REF CHG. N
RQMTS CHG: N
MAT'L CHG: N
TECHNICAL REVIEW: C/411.1JT
SERIAL NO: 005

Accomplish the requirements of the SOW. During contract execution and after the removal of the windshield assemblies, the contractor may submit a CFR documenting actual conditions found and proposed repairs. The contract will not be changed at this time.

ALL REQUESTS FOR CLARIFICATION MUST BE RECEIVED BY THE ISSUING OFFICE’S POC NO LATER THAN THE DATE & TIME IDENTIFIED IN THE REQUEST FOR PROPOSAL.